Attachment A - PPII log.doc
DOC document 39 KB Posted
- Solicitation number
- N4008521R0272
About this file
This document provides details on a federal solicitation to replace the caisson for Dry Dock #1 at the Portsmouth Naval Shipyard in Kittery, Maine. The proposed project involves steel fabrication of a replacement caisson including mechanical and electrical systems. Construction will primarily occur offsite with delivery and final testing at the dry dock. Upon acceptance of the new caisson, the project includes removing the existing caisson to an offsite facility for demolition and disposal, including handling and disposal of hazardous materials. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for caisson replacement and related demolition and disposal work.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL INQUIRY ATTACHMENT (5.3)
Solicitation Number: N40085-21-R-0272
Contractor Name:
Contractor POC (Name and email):
Instructions: DO NOT submit in PDF format. DO submit as a word document
| Contractor PPI# |
| Section of RFP or Page Number |
| Paragraph Reference |
| Drawing Number |
| Question |
| RESPONSE |
File details come from the government source that posted it. Updated .