This document is an amendment to a solicitation for the replacement caisson for Dry Dock #1 at Portsmouth Naval Shipyard in Kittery, Maine. The amendment provides revised drawings, responses to pre-proposal inquiries, and instructions for submitting electronic proposals through the PIEE Solicitation Module by the response deadline of 23 November 2021. The proposed project involves offsite fabrication and delivery of the replacement caisson, installation and testing at the dry dock, and subsequent removal and demolition of the existing caisson including hazardous materials handling. The Naval Facilities Engineering Command is the contracting agency seeking these services from industry in accordance with the terms and conditions outlined in solicitation number N4008521R0272.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-21-R-0272, DESIGN-BID-BUILD, RM-13-1458 DRY DOCK 1 CAISSON REPLACEMENT, PORTSMOUTH NAVAL

SHIPYARD, KITTERY, MAINE

This amendment is issued to update instructions to offorers, incorporate responses to pre-proposal inquiries (PPI’s), revised draw ings, and Attachment H - PIEE Solicitation Module Vendor Access Instructions.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Dec-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R0272

X 9B. DATED (SEE ITEM 11)

23-Nov-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Dec-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521R0272

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

The following revised Documents are hereby incorporated under this amendment and are attached separately:

RM13-1458_amend_002_revdwgs_20211222 (Please refer to Amendment 0002; summary of changes)

Attachment H – PIEE Solicitation Module Vendor Access Instructions.

SECTION 00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSORS

INSTRUCTIONS TO OFFERORS

4. PROPOSAL REQUIREMENTS

4.2. PROPOSAL SUBMISSION INSTRUCTIONS: Delete in its entirety and insert the following:

4.2. PROPOSAL SUBMISSION INSTRUCTIONS:

In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non- Cost/Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor.

Offerors shall also submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation.

Electronic proposal submissions should be no larger than 1.9 GB per file. Electronic proposals shall match the hard copy version of the proposal. In the event of a discrepancy, the electronic copy will govern. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment - H. Emailed submissions will not be accepted.

Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL NOT BE

CONSIDERED.

Mailed Hard Copies

One (1) original, one (1) CD-ROM, and one (1) copy of the hard copy proposal shall be delivered by mail within 5 business days of the electronic proposal submission. Proposal shall be labeled “PRICE PROPOSAL OR NONCOST/ PRICE FACTORS PROPOSAL FOR RFP N40085-21-R-0272, ATTN: BRITTANY CRISTELLI; DO

NOT OPEN IN MAIL ROOM”.

Express Mail to:

Naval Facilities Engineering Command, Mid-Atlantic 9324 Virginia Avenue Building Z-140, Room 225 Norfolk, Virginia 23511 Attn: Brittany Cristelli, CON21

PROPOSALS THAT ARE HAND CARRIED WILL NOT BE ACCEPTED.

It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from Opportunities (www.sam.gov).

Section 00 22 16 – Supplementary Instructions to Proposers

INSTRUCTIONS TO OFFERORS

EVALUATION FACTORS FOR AWARD

3. Basis of Evaluation and Submittal requirements for Each Factor.

(a) Price, (1) Solicitation Submittal Requirements: Delete in its entirety and insert the following

(1) Solicitation Submittal Requirements

Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit in accordance with INSTRUCTIONS TO OFFERORS, 4. PROPOSAL REQUIREMENTS, 4.2. PROPOSAL SUBMISSION INSTRUCTIONS. All submissions shall include the following:

- Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, DUNS, CAGE code, Point of Contact (POC), POC phone number, and POC email address;

- Completed SF 1442 signed with all amendments acknowledged;

- Price Proposal Form;

- Copy of Representation and Certifications and proof of registration in System for Award Management

(SAM);

- Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2020/2021 filing cycle;

- Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million; and

- Responsibility Determination Information (see below).

- Small Business Subcontracting Plan

Note: Price information included in the non-price/technical proposal will not be considered. Likewise, non-price/ technical information included in the price proposal will not be considered.

The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs). Pricing information is not required to be completed under Section 00 10 00 – Solicitation Contract Form in SF 1442. All required proposal documents shall be submitted in accordance with FAR 15.208.

DOCUMENT 00 01 15 LIST OF DRAWINGS

CONTRACT DRAWINGS

The following drawing is revised as of 22 December 2021:

On NAVFAC Dwg. No. 12852153

REPLACE OA202 PROFILE - CENTERLINE ELEVATION with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852157

REPLACE OA402 FIXED CONCRETE BALLAST - ARRANGEMENT with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852158

REPLACE OA403 FIXED CONCRETE BALLAST – INSTALLATION PROCEDURE with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852182

REPLACE OS304 CAISSON FRAME 3 with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852214

REPLACE OP301 PROCESS SECTION – LONGITUDINAL SECTION with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852215

REPLACE OP302 PROCESS SECTIONS – SHEET 1 OF 2 with revised drawing sheet accompanying this

On NAVFAC Dwg. No. 12852218

REPLACE OP502 BALLAST & FLOOD THROUGH SYSTEMS DETAILS – SHEET 2 OF 2 with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852219

REPLACE OP503 PROCESS SYSTEM SUPPORTS – SHEET 1 OF 2 with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852221

REPLACE OP601 SYSTEM DIAGRAM & SHEDULES with revised drawing sheet accompanying this

On NAVFAC Dwg. No. 12852222

REPLACE OP901 FULL SYSTEM ISOMETRIC with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852223

REPLACE OP902 ISOMETRICS with revised drawing sheet accompanying this amendment.

On NAVFAC Dwg. No. 12852226

REPLACE OM301 MECHANICAL LONGITUDINAL SECTION with revised drawing sheet accompanying this

On NAVFAC Dwg. No. 12852227

REPLACE OM302 MECHANICAL SECTIONS – SHEET 1 OF 2 with revised drawing sheet accompanying this

PPI RESPONSES

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

1 Due Date With Christmas and New Years in the mix, we would like to request an extension of the bid due date.

The bid date will not be extended.

2 RFP pp. 7-8 Offeror requests that the Government allow the usage of 10-point font for charts, tables, graphics, captions, and illustrations.

Propose per RFP.

3 Ship Work Breakdown Structure Specifications

NAVFAC

12852208 Sheet 83 of 129

(OS523)

If the answer to #2 is yes, then 1), does NAVFAC have a notional storage location reserved on Ops Deck (for drawing note 7), 2) how do these panels get to and from Ops Deck (person-carry, hoist, or ?), and 3) we find no details for the mating bolt holes in the caisson shell plate, so how are these attached using the slotted holes in the panels (note that dwg detail B4 shows a gap between the shell plate and panel at the slotted holes)?

1) Port and Starboard sides of Inner Hull approx 30 inches above the operations deck to least affect the list and trim. As-Built weight will be included in the Weight Control Reports per

SWBS 096

2) "Person-carried" each piece is less than 100 lbs.

3) See DWG No. 12852208 Rev 1

4 RFP p. 5 1.2

GENERAL

OVERVIEW

OF THE

CONTRACT

(12/14/2021): Can the requirement for “removal… and disposal of the existing Dry Dock #1 Caisson…” be removed from the contract?

No.

5 Ship Work Breakdown Structure Specifications

Section 042 and 070b

Section 042 requires a minimum GM in the Lightship condition of 1’.

Section 070b requires a minimum GM in the Lightship condition of 1.25’.

Please clarify the Lightship GM requirement.

In SWBS subsection 042b.

Definitions, paragraph 10, delete, "…metacenter is at least 1 foot…" and replace with, "…metacenter is at least 1.25 feet…".

6 Ship Work Breakdown Structure Specifications

Section 096a Section 096a states that the flood through pipes should be considered empty for the Lightship condition. This is contrary to the treatment of flood through pipes on all previously completed caissons.

Flood through pipes have always been considered as full in the lightship condition. Please confirm this new Lightship definition is correct.

Typically, light condition is with flood tubes full, since when caisson is removed from seat after flooding the dock its not possible to empty out the tubes.

However, flood tubes are to be assumed empty for seating reaction, while caisson is in seat.

7 Ship Work Breakdown Structure Specifications

Section 100d Section 100d states that sounding tubes (also known as deck drains) should be installed with a clear line to the pump sumps. Sounding tubes and deck drains are not equivalent. Please clarify which needs to be installed.

Sounding Tubes, see also sheet OP102, Keynote No. 7 (four places) About Fr 3-2 and Fr 3-1 (watertight bulkheads). In SWBS subsection 100d, paragraph Sounding Tubes, first sentence delete, "(also known as deck drains)".

8 Ship Work Breakdown Structure Specifications

Section 505.b.1

Section 505.b.1 states ““Pipe and fittings for 8 through 18-inch

Pipe and fittings for 8 through 18-inch diameter shall be Schedule 40. In SWBS subsection 505.b.1 diameter piping shall be Schedule 40 (wall thickness of

0.750 inches).” This statement is contradictory with itself. The wall thickness of Schedule 40 piping varies with pipe diameter. Further, the SCH 40 wall thickness for all pipes in the provided range is less than 0.750.

Please clarify desired pipe material spec.

Carbon Steel Pipe:

paragraph a.1. delete, "(wall thickness of 0.750 inches)".

9 Ship Work Breakdown Structure Specifications

Section 505.b.3

Section 505.b.3 requires that the hinged blind flange be analyzed to a design head of 40.75

ft. Such a design head would place the water level well above the top of the caisson. Please clarify the required design head and safety factor for the hinged blind flange.

The design head shall be analyzed from the top of weather deck to centerline of pipe with hinged blind flange. In SWBS subsection 505.b.3 Hinged Blind Flanges: first paragraph last sentence, delete, "…40.75 feet." and replace with, " ...23.75 feet and a factor of safety of 2.0 for a total head of 47.5 feet."

10 Ship Work Breakdown Structure Specifications

Various BSR believes that the provided Lightship characteristics, Hydrostatics, and Tank Capacity Tables are incorrect as-provided, base don’t eh following.

a. This caisson does not have pump sumps or dewatering pumps for the trim tanks.

Operationally, this means that the trim tanks can only be drained by opening the cross-connect valve to the main tank and using the main tank pumps to

6.25-ft ABL is the refernce for the ballast heights.

They're not truly "soundings" since the top of concrete is 6.25-ft in main tank (top fo pump sump) and 6.75-ft in trim tanks, should be "ballast level".

The reference point (6.25-ft ABL) helps from a calculations perspective in maintaining same ballast levels in all tanks, referenced from caisson baseline. Please refer to the 12/22/2021 drawing revisions that adjust the elevation of the equalization pipe and valve with sump.

The lightship characteristics, hydrostatics and tank capacity tables will drain all tanks. This setup hinders the flexibility of operation of the caisson, and presents an operational risk if damage occurs to one of the tanks. b.

Tank capacity tables for the trim tanks begin at a sounding of 0.0’ and then proceed upward in 6” increments. The soundings for 0.00’ and 0.50’ have a tank volume of 0.0 CF. The definition of a sounding is a measurement from the bottom of a tank (or other reference point) to the surface of the water. It is impossible to have a sounding of 0.50’ that represents zero tank contents. Trim tank soundings need to be referenced to their own tank bottoms, not to the level of the main tank. c. The lack of a pump and sump in the trim tanks means that the trim tanks can never be fully dewatered. The placement of the equalizing line is such that there will always be approx.

7” of water in the bottom of the trim tanks. Because this water cannot be removed by the pumps, it must be considered as part of Lightship just like the water in the main tank sumps.

The estimated free have an insignificant change.

surface moment of this water could result in a reduction in Lightship GM of up to 0.25’. The added weight of this water will also increase the lightship draft of the caisson. Please confirm the Lightship characteristics, Hydrostatics, and Tank Capacity Tables data.

11 Ship Work Breakdown Structure Specifications

Section 045b Section 045b of the SWBS requires that the Launching Plan be stamped by a registered professional Naval Architect. BSR’s degreed Naval Architects are registered Professional Engineers (Mechanical Discipline) which is assumed to be sufficient because the registration states do not offer a Professional Naval Architect registration.

Further, our PEs have Nav Arch BS degrees and have been involved in multiple previous NAVFAC caisson projects. Please confirm that a PE stamp is acceptable in lieu of a PNA.

SWBS Section 045b, LAUNCHING AND

DOCKING, second paragraph, replace the second sentence with, "Provide and submit to the Government a Launching Plan prepared by the Contractor and reviewed, approved, and stamped by a Registered Professional Naval Architect or Registered Professional Engineer with naval architecture experience."

12 RFP p.10, Factor 2

Paragraph d. states:

“The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page”.

Offeror requests that the Government increase the page limit to three or more pages to allow adequate space to present the required elements in meaningful detail.

Propose per RFP.

13 OS523 -

Floodwall Details

Please clarify the material alloy on the Aluminum Flood Wall Panels.

Aluminum Plate or Flat Bar

6061-T6 (ASTM B209)

Aluminum Rod: 6061-T6

(ASTM B221)

---END OF AMENDMENT---