Attachment G - Price Proposal Form.pdf
PDF 110 KB Posted
- Solicitation number
- N4008521R0272
About this file
This document provides a price proposal form for solicitation N4008521R0272, which seeks a replacement caisson for Dry Dock #1 at Portsmouth Naval Shipyard in Kittery, Maine. The project includes offsite fabrication of the steel caisson with mechanical, electrical and testing work, delivery to the shipyard, and removal and disposal of the existing caisson including hazardous materials.
The solicitation will be awarded as a lump sum contract. The price proposal form includes line item costs for caisson fabrication including structural, architectural, mechanical and electrical work; transportation of the new caisson to the shipyard; inspection and acceptance; and removal and disposal of the existing caisson. The Naval Facilities Engineering Command is the contracting agency. Responses are due by the date specified in the solicitation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RM-13-1458 Dry Dock 1 Caisson Replacement - Fabrication Portsmouth Naval Shipyard, Kittery, ME eProjects #1630175
Document 00 41 00 Page 1 of 4
DOCUMENT 00 41 00
BID SCHEDULES
PART 1 GENERAL
1.1 BASIS OF BIDS
This contract will be awarded as one Lump Sum.
a. The low bidder for purposes of award will be determined as in Clause "FAR
52.217-4, Evaluation of Options Exercised at Time of Contract Award," of Section 00200, "Instructions to Bidders."
b. The minimum bid guarantee shall be 100 percent of the amount of CLIN 001a through 001e Base Amount.
c. This Bid Schedule does not include options.
d. No provision is made for economic price adjustment. Method for evaluation for bids for award purposes is specified below.
e. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
f. Any bid price for items indicated which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
1.2 BID ITEMS
1.2.1 Bid Schedule
This contract will be solicited with bid items. A description of the bid items is contained in Standard Form 1442, "Solicitation, Offer and Award."
See Contract Clauses, "FAR 52.212-11, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys."
CLIN 001 Dry Dock 1 Caisson Replacement Fabrication
The Total Amount for CLIN 001 shall provide the full project scope for supply of one caisson and related work, complete and in place, in accordance with the drawings and specifications even if not specifically listed below.
TOTAL CLIN 001: $ ________
CLIN 001a Caisson Fabrication – Structural & Architectural
Price for provision of all work associated with the fabrication of
Document 00 41 00 Page 2 of 4 structural and architectural components of the caisson for the RM13-1458 Dry Dock 1 Caisson Replacement Fabrication project, complete as depicted in the drawings and specifications.
Structural items include: plating, hull framing, structural bulkheads & frames, decks & platforms, foundations, fixed ballast (concrete), and special structures (rubber seals) and removable aluminum flood walls.
Architectural items include: hull fittings, ladders, handrails, ramps, companionways, hatches, painting, and cathodic protection.
TOTAL CLIN 001a: $ ________
CLIN 001b Caisson Fabrication – Mechanical & Electrical
Price for provision of all work associated with the fabrication of mechanical & electrical components of the caisson for the RM13-1458 Dry Dock 1 Caisson Replacement Fabrication project, complete as depicted in the drawings and specifications.
Mechanical items include: pumps; piping; valves and valve actuators;
climate control; drainage & ballasting systems; and fire detection.
Electrical items include: motors & associated equipment; electrical cables; power distribution systems; lighting fixtures; receptacle circuits; alarm, safety & warning systems; and control, indicating & metering systems.
TOTAL CLIN 001b: $ ________
CLIN 001c Transport of Caisson to Portsmouth Naval Shipyard
Price for provision of all logistics and work to transport the caisson from fabrication shop to Portsmouth Naval Shipyard (PNSY) in Kittery, ME, and offloading of the caisson to a PNSY berth as designated upon delivery. Price shall include all costs associated with loading, transport, insurance, offloading, and delivery, complete as depicted on the drawings and specifications.
TOTAL CLIN 001c: $ ________
CLIN 001d Inspection, Testing and Acceptance of Caisson
Price for provision of all logistics and work to inspect, test, and attain government acceptance of the caisson. Price shall be inclusive of all Bidder costs, Shipyard inspection, testing and acceptance requirements, complete as depicted on the drawings and specifications.
TOTAL CLIN 001d: $ ________
CLIN 001e Removal and Disposal of Existing Caisson
Price for provision of all work associated with the removal and
Document 00 41 00 Page 3 of 4 disposal of the existing Dry Dock 1 caisson after delivery and government acceptance of the replacement caisson, handling and disposal of hazardous materials on and within the existing caisson, complete as depicted on the drawings and specifications.
TOTAL CLIN 001e: $ ________
1.2.2 Explanation of Bid Items:
Total amount of Base Amount CLIN 001 shall provide the full project scope for the Caisson Fabrication, complete in place in accordance with the drawings and specifications even if not specifically listed. Explanation of specific work items as defined as follows:
CLIN 001a: Caisson Fabrication – Structural and Architectural includes provision of all work associated with:
Structural: plating, hull framing, structural bulkheads & frames, decks & platforms, foundations, fixed ballast (concrete), supports, and special structures (rubber seals), removable aluminum flood walls; and
Architectural: hull fittings, ladders, handrails, ramps, companionways, hatches, supports, painting, and cathodic protection;
Including but not limited to furnishing all labor, materials, tools, equipment, and incidentals required for the Structural and Architectural items for Caisson fabrication as described above, and all other incidental and related work.
CLIN 001b: Caisson Fabrication – Mechanical and Electrical includes provision of all work associated with:
Mechanical: pumps, pump columns, bowls, inlets; piping, inlet screens, blind flanges; valves and valve actuators; climate control; drainage & ballasting systems; supports and guides; and fire detection; and
Electrical: motors & associated equipment; electrical cables; power distribution systems; lighting fixtures; receptacle circuits; alarm, safety & warning systems; and control, indicating & metering systems;
supports;
Including but not limited to furnishing all labor, materials, tools, equipment, and incidentals required for the Mechanical and Electrical items for Caisson fabrication as described above, and all other
CLIN 001c: Transportation of Caisson to Portsmouth Naval Shipyard includes provision of all work associated with:
Transportation of the Caisson including but not limited to design for sea transportation, transportation from fabrication shop to Portsmouth Naval Shipyard, offloading at a PNSY berth as designated upon delivery, insurance, logistics and all other incidental and related work.
CLIN 001d: Inspection, Testing and Acceptance of Caisson includes provision of all work associated with:
Document 00 41 00 Page 4 of 4
All work required for inspection, testing, and to attain government acceptance of the caisson, including but not limited to furnishing all labor, materials, tools, equipment and incidentals, and all other
CLIN 001e: Removal and Disposal of Existing Caisson includes provision of all work associated with:
Removal and disposal of the existing Dry Dock 1 caisson after delivery and acceptance of the replacement caisson, handling, and disposal of hazardous materials on and within the existing caisson, including but not limited to furnishing all labor, materials, tools, equipment and incidentals, and all other incidental and related work.