1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.

PROJECT NO. (If applicable)

0010 02/04/2021

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-20-R-0105

9B. DATED (SEE ITEM 11)

10/13/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

P907, DESIGN-BUILD, DRY COMBAT SUBMERSIBLE OPERATIONS FACILITY, JOINT EXPEDITIONARY BASE (JEB)

LITTLE CREEK- FORT STORY, VIRGINIA BEACH, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0010

The purpose of this amendment is to provide the following:

1. Provide a revised response to PPI#255

2. Revise Factor 2, Energy Design Reduction

3. Provide additional document (Q907 Amendment 0010 Cont Sht_NSW.pdf)

The proposal due date and time remain unchanged.

Proposal Due Date: Thursday, February 11, 2021 at 2:00PM Eastern Standard Time

Electronic Copy due: Thursday, February 11, 2021 at 2:00PM Eastern Standard Time Hard Copy due: Wednesday, February 17, 2021 at 12:00 PM. Eastern Standard Time

All other terms and conditions remain unchanged.

I. Pre-Proposal Inquiries (PPI), Revision to PPI#255

No. Date Submitted

LEAVE

BLANK

Reference

Question Response Page Section Paragraph

255 1/15/2021

The amendment adds language that after final design is complete, NAVFAC MIDLANT will have to submit to NOSSA for approval, which could take four to six months.

Please confirm this means that once the Final Design is complete (01 33 10.05 20, 2.2.2.d), the project is to experience four to six months of down time with no site activity while waiting for NOSSA approval. This will be a 4-6 month critical path impact and have major cost implications on the project.

Please refer to attached amended continuation sheet (Q907 Amendment 0010 Cont Sht_NSW.pdf). Since the building is an exposed site (no explosives in the faclity), the contractor can submit for NOSSA approval once the location of the building is determined, which can occur while the building design is being finalized.The approval is not contingent upon the final building design, so no time and cost impact is anticipated to obtain NOSSA approval.

*Note: Updated PPI Response* This response supersedes the response provided in Amendment 0008

II. Revise Factor 2, Energy Design Reduction

The Government will not be providing the information in Part 6 of the RFP for Building Simulation under Factor 2 – Energy Design Reduction. Therefore, the Building Simulation is hereby removed from Factor 2 – Energy Design Reduction. See the revised Factor 2 – Energy Design Reduction below.

Factor 2, Energy Design Reduction is hereby removed and replaced with:

Factor 2 – Energy Design Reduction

(a) Solicitation Submittal Requirements:

(1) Energy Efficiency Narrative:

The overall facility requires Guiding Principles Validation only. It is to be designed using best practices and maximum energy use reduction/savings where possible, in accordance with UFC 1-200-02 High Performance and Sustainable Requirements.

The facility’s systems must meet the Guiding Principles for Sustainable Federal Facilities. Individual systems, such as HVAC systems, must be commissioned to prove compliance with the design intent.

Provide a detailed narrative describing how the proposed solution will meet at least a 30% energy reduction below the ASHRAE 90.1- 2013 baseline. Also describe how the solution will provide baseline ASHRAE 90.1, based on life cycle cost effectiveness.

Organize narrative in four parts: 1) Orientation, Configuration, and Shape; 2) Envelope properties (fenestration, solar heat gain coefficients (SHGC), wall and roof insulation values (U-values), window U-values); 3) Mechanical (HVAC, plumbing, and domestic hot water heating systems, including any solar hot water systems); and 4) Electrical Systems (lighting and control systems, including any interior and exterior lighting systems, renewable energy and control systems).

Where 30% reduction is not lifecycle cost effective, provide highest percent energy reduction that is lifecycle cost effective and why 30% energy reduction cannot be met.

Note: Building performance rating and percent energy reduction are calculated in terms of energy rather than energy cost.

Do not exceed two (2) double-sided pages (or four (4) single-sided pages).

(b) Basis of Government Evaluation:

1) Energy Efficiency Narrative and Solution: The Government will evaluate the Offeror’s proposed energy efficiency narrative and solution.

III. Provide additional documents

The following file is hereby incorporated:

Q907 Amendment 0010 Cont Sht_NSW.pdf

*Note: This document supersedes the document (Q907 Amendment 0007 Cont Sht_NSW.pdf) provided in Amendment 0007*

(End of Summary of Changes)

File details come from the government source that posted it. Updated .