1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. PROJECT NO. (If applicable) 0005 12/30/2020

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-20-R-0105

9B. DATED (SEE ITEM 11)

10/13/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

P907, DESIGN-BUILD, DRY COMBAT SUBMERSIBLE OPERATIONS FACILITY, JOINT EXPEDITIONARY BASE (JEB)

LITTLE CREEK- FORT STORY, VIRGINIA BEACH, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0005

The purpose of this amendment is to provide the following:

1. Pre-Proposal Inquiry (PPI) Responses

2. Provide additional file

All other terms and conditions remain unchanged.

I. Pre-Proposal Inquiry (PPI) Responses (11, 30, 31 and 39). Responses have been provided to all PPIs that were submitted by the PPI closing date in accordance with Amendment 0002 with the exception of 209 which will be provided in a subsequent Amendment. All other PPIs received after that date may or may not be responded to at the discrestion of the Contracting Officer.

No.

Date

Submitted

LEAVE

BLANK

Reference

Question Response Page Section Paragraph

11 10/23/20 7 Factor 2: (b) 1 - 8

We do not see the documents referenced below included in Part 6:

"The Whole Building Energy Solution requires the use of the following documents included in Part 6 of this RFP:

- Government Baseline Building Performance Rating

- Government Baseline Building Energy Model (input-output) schedules (If the process and receptacle loads are not given in the schedules, assume they are 25% of the total load.)

- Default simulation factors

- Utility Costs (energy rates) for project, based on local unburdened PWD rates

- “Whole Building Energy Simulation” templates

- “Performance Rating Method Compliance Reports”"

Refer to Amendment

0005 , "NAVFAC

Capital Improvements GOV Energy Baseline and Offerors Model Performance Rating Assumptions"

30 10/28/20 6 of 25 RFP Part 1 Factor 2 - Energy Design

Reduction (b)

Factor 2 – Energy Design Reduction, requires the submission of all templates from the Whole Building Energy Simulation and the use of numerous documents noted in the RFP to be included in Part 6 Attachments such as “Government Baseline Building Performance Rating”, “Default Simulation Factors”, “Utility Costs”, etc. These documents were not included in the RFP and we are not able to prepare the energy model and required documentation without these documents.

Please provide the referenced documents and / or confirm if the submission requirements for this factor can be limited to the “Performance Rating Report”.

Refer to Amendment

0005 , "NAVFAC

Capital Improvements GOV Energy Baseline and Offerors Model

31 10/28/20 6 of 25 RFP Part 1 Factor 2 - Energy Design

Reduction (b)

This section of the RFP indicates to provide energy simulation results using the Whole Building Energy Simulation Templates provided in Part 6 of the RFP. These templates could not be located in Part 6.

In the past these government provided templates have included a Government Baseline workbook along with the baseline building performance rating assumptions to ensure the government is reviewing apples-to-apples comparisons between offerors. On previous projects the simulation factors included:

1. The specific weather file to be used by all applicants

2. Required occupancy of each room

3. Space usage classification for each room

4. Lighting schedule and calculation method classification

5. Unoccupied temperature setpoints and schedules

6. Infiltration rate assumptions for perimeter zones

7. Receptacle and plug load assumptions

8. Service hot water space usage classification

9. Elevator schedules

10. Parking lot lighting classifications

11. Burdened utility rates for the Base

Please confirm that the Factor 2 Paragraph (1)(b) Whole Building Energy Simulation is a requirement of this RFP and the indicted information above will be provided. If it was not the intent to provide this information please confirm that Factor 2 Paragraph (1)(b) can be excluded and the Paragraph (1) Energy Efficiency Narrative still applies.

Refer to Amendment

0005 , "NAVFAC

Capital Improvements GOV Energy Baseline and Offerors Model

209 11/06/20 Part 3 / Chapter

6, ESR

G204001

Requires fence to be cable reinforced and anchored, however, UFC 4-022-03 refers to UFC 4-022-01 and 4-022-02 for design of cable reinforcing which in turn require a design condition (kinetic energy) to determine the number of cables required. Please provide design condition data or specify number of cables required.

To be addressed in a subsequent amendment

II. Provide Additional Files

The following files are hereby incorporated:

NAVFAC Capital Improvements GOV Energy Baseline and Offerors Model Performance Rating Assumptions.pdf

(End of Summary of Changes)