1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. PROJECT NO. (If applicable) 0006 01/07/2020
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-20-R-0105
9B. DATED (SEE ITEM 11)
10/13/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
P907, DESIGN-BUILD, DRY COMBAT SUBMERSIBLE OPERATIONS FACILITY, JOINT EXPEDITIONARY BASE (JEB)
LITTLE CREEK- FORT STORY, VIRGINIA BEACH, VIRGINIA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0006
The purpose of this amendment is to provide the following:
1. Revise the General Requirements, Proposal Due Date
2. Pre-Proposal Inquiry (PPI) Responses
3. Revise General Requirements, Price Proposal Form (Firm information and Acknowledgement of Amendment(s) only change)
4. Provide additional file (6_ESR_C10.pdf)
All revisions are in red font.
All other terms and conditions remain unchanged.
I. Revise the General Requirments, Proposal Due Date
Pages 3/4 of 25, Proposal Due Date is hereby removed and replaced with:
Proposal Due Date: Thursday, January 21, 2021 at 2:00PM Eastern Standard Time
Electronic Copy due: Thursday, January 21, 2021 at 2:00PM Eastern Standard Time Hard Copy due: Wednesday, January 27, 2021 at 12:00 PM. Eastern Standard Time
LATE PROPOSALS WILL NOT BE CONSIDERED.
Electronic Proposal Delivery Information via DOD Safe Site:
Contractors shall send their Electronic Proposal submission to Stephen Astwood through the DOD Safe Site (safe.apps.mil). Only DoD SAFE is authorized for the submission of the electronic original proposal in response to this solicitation. Further guidance is provided below for submission of hard copy submissions.
The contractor shall send the contract specialist, Stephen Astwood at stephen.d.astwood@navy.mil, the email address of the offeror’s point of contact (POC) who will be receiving the Drop-Off invitation to upload proposals to the DOD Safe Site no later than Friday, January 15, 2021 at 2:00PM Eastern Standard Time unless that date and time are changed via Solicitation Amendment. If a firm has already submitted a request for the Drop-off invitation, it is not necessary to resubmit another unless the POC has changed. It is the offeror’s responsiblility to ensure the POC information is received.
The Contract Specialist, Stephen Astwood, will “Request a Drop-Off” through DoD SAFE utilizing the provided offeror’s point of contact email address. The recipient will receive an automated email containing the information for the request and instructions for uploading. Requests from DoD SAFE will be sent by Tuesday, January 19, 2021 by 2:00PM. If you do not receive an email containing drop off instructions on that date, please contact the Contract Specialist. Only the identified POC will be able to drop-off proposals or proposal revisions in DOD SAFE. Failure to provide accurate POC information will preclude the offeror from using DoD SAFE. Note: only two email addresses may be provided per Offeror.
To submit the proposal, the offeror will utilize the link provided in the automated email to take you to DoD SAFE at https://safe.apps.mil. The system will allow for inclusion of a short note to the Recipient and then the offeror will click to add files or drag and drop them. Click “Drop-Off Files” to send the files to the recipient. You should receive a notification on the site “Drop-Off Completed” “Your files have been sent successfully.” Please keep this for your records. The file(s) are uploaded and an email will be sent to the recipient notifying them of the “drop-off”. [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil]. Note that the submission of any proposal must be completed no later than the due date and time, unless the date and time are changed via Solicitation Amendment, using the link sent by the contract specialist via DOD Safe. The DoD SAFE system will record the date and time of package submittal. The date and time of package submittal recorded in DoD SAFE shall govern the timeliness of any proposal submission.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of offerors.
The maximum file size of a package is 8 GB. Up to 25 packages may be uploaded per link.
It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from Opportunities (www.beta.sam.gov).
Mailed Hard Copies In addition, one (1) original and one (1) copy of the hard copy proposal shall be delivered by mail on the date and time listed below, respectively, unless those dates are changed via Solicitation Amendment.
Proposal shall be labeled “PRICE PROPOSAL OR NON-COST/PRICE FACTORS PROPOSAL FOR RFP N4008520R0105, ATTN:
STEPHEN ASTWOOD; DO NOT OPEN IN MAIL ROOM”.
Hand delivered proposals will not be accepted.
Express Mail to:
Naval Facilities Engineering Command, Mid-Atlantic 9324 Virginia Avenue Building Z-140, Room 216 Norfolk, Virginia 23511 Attn: Stephen Astwood, ACQ22
II. Pre-Proposal Inquiry (PPI) Responses (251-254). Any other PPIs received after the PPI cut-off date may or may not be responded to at the discrestion of the Contracting Officer.
No.
Date
Submitted
LEAVE
BLANK
Reference
Question Response Page Section Paragraph
251 12/24/20 5 of 25 RFP Part 1 Factor 1
Part 1 asks us to respond to the following for Factor 1: "In addition, describe how the proposed construction will meet Anti-Terrorism/Force Protection and Explosive Arc requirements as outlined in the RFP."
There are no explosive arc requirements in the RFP. Please clarify and/or provide Explosive Arc information.
Minimum explosive arc requirements are similar or equal to AT/FP exterior enclosure requirements. It is not anticipated that additional security measures beyond the RFP requirements will be needed.
252 12/24/20 Various AMD 0004
PPI
Responses #88, 91, ESR_D10 provided with Amendment 4 reduces the crane hook height to 28’-4”, and increases the clear unobstructed space to at least +42’-4” clear distance to underside of structure (28’-4” hook + 3’ to runway rail + 11’ clear height). The PPI responses to 88, 91 indicates 40’-0” clear distance to underside of structure. PPI 181 calls for a 35’ hook height. Please verify that ESR_D10 overrides any PPI responses.
11'-0" clear zone is from the hook height (28'-4") and not the crane rails.
Underside of the structure shall remain 40'-0".
253 12/24/20 AMD 0004
PPI
Responses #45
Response references a revised ESR C10 included as part of the amendment 0004 package. This document seems to be missing, please provide as indicated. See attached.
254 12/24/20 AMD 0004
PPI
Responses #171
The PPI response did not address the question as to whether the additional make-up air that may be required to compensate for the vehicle exhaust system when in operation is to be conditioned to maintain the bays at the indoor temperature requirements listed in the RFP or not. Please clarify that the room temperature may vary from the RFP required indoor temperature table for the maintenance bays, only when the vehicle exhaust system is in operation.
As noted in PPI #171 response, make-up air shall be provided as required to maintain pressurization. Space is required to be conditioned as noted in PPI request.
System must be designed for conditioning of make-up air as required to maintain space temperature requirements.
III. Revise General Requirements, Price Proposal Form
Price Proposal Form is hereby removed and replaced with:
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001AA. Price for the entire Facility work, including site work and associated parking for the Q907 Dry Combat Submersible Operations Facility building, Base Bid, complete and in accordance with the drawings, specifications, and RFP documents, but excluding work described in CLINs 0001AB, 0002, 0003, 0004, 0005 and 0006
CLIN DESCRIPTION TOTAL PRICE FOR 0001AA
0001AA Q907 Dry Combat Submersible Operations Facility Building, including site work and associated parking, Base Bid.
CLIN 0001AB. Price for overexcavation and replacement of geotechnically unsuitable soils in the pavement areas complete and in accordance with the drawings, specifications, and RFP documents, but excluding work described in CLINs 0001AA, 0002, 0003, 0004, 0005, and 0006, in accordance with the following schedule:
CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR CLIN
0001AB (UNIT PRICE X
NO. UNITS)
0001AB Q907,over excavation and replacement of geotechnical unsuitable soils in the pavement areas as defined in the RFP
Cubic yards
8,500 $
Total CLIN 0001 (0001AA and 0001AB)____________________________
CLIN 0002,Option Item No.1- Price for providing Pool Cooling System Chiller Equipment, complete and in accordance with the drawings, specifications, and RFP documents, but excluding work described in CLINs 0001AA, 0001AB, 0003, 0004, 0005, and 0006.
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0002 Q907 - Dry Combat Submersible Operations Facility – Pool Cooling System Air Cooled Chiller
CLIN 0003 Option Item No. 2 - Price for adding heavy duty industrial poured epoxy flooring with slip resistant additive, including integral epoxy base, complete and in accordance with the drawings, specifications, and RFP documents, but excluding work described in CLIN 0001AA, 0001AB, 0003, 0005, and 0006.
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0003 Q907 - Dry Combat Submersible Operations Facility – Heavy Duty Industrial Epoxy Flooring
CLIN 0004 Planned Modification Item 1 - Price to procure and install Furniture, Fixtures, and Equipment (FF&E) for project Q907 Dry Combat Submersible Operations Facility Building, complete in accordance with the drawings, specifications, and RFP documents and in accordance with the following schedule:
CLIN ITEM GOVERNMENT FF&E
ESTIMATE Q907 -
Dry Combat Submersible Operations Facility
HAR
(NTE
5%)
HAR AMOUNT (GOVT
FF&E ESTIMATE x
HAR%)
TOTAL FF&E ESTIMATED
AMOUNT FOR CLIN 0005
(GOVT FF&E ESTIMATE +
HAR AMOUNT)
CLIN ITEM GOVERNMENT FF&E
ESTIMATE Q907 -
Dry Combat Submersible Operations Facility
HAR
(NTE
5%)
HAR AMOUNT (GOVT
FF&E ESTIMATE x
HAR%)
TOTAL FF&E ESTIMATED
AMOUNT FOR CLIN 0005
(GOVT FF&E ESTIMATE +
0004 FF&E $609,595
CLIN 0005 Planned Modification Item 2 - Price for providing work in connection with all labor, material, equipment, transportation and supervision required for the Audio/Visual (A/V) equipment complete in accordance with the drawings, specifications, and RFP documents, and the following schedule:
CLIN ITEM GOVERNMENT A/V
ESTIMATE
Q907 - Dry Combat Submersible Operations Facility
A/V
(HAR
NTE 5%)
HAR AMOUNT (GOVT
A/V ESTIMATE x
HAR%)
TOTAL A/V ESTIMATED
AMOUNT FOR CLIN 0006
(GOVT A/V ESTIMATE +
HAR AMOUNT)
0005 Audio/Visual (A/V)
$1,257,800
CLIN 0006 Planned Modification Item 3 - Price to procure and install the Electronic Security Systems (ESS), complete in accordance with the drawings, specifications, and RFP documents, and the following schedule:
CLIN ITEM GOVERNMENT ESS
ESTIMATE Q907 -
Dry Combat Submersible Operations Facility
ESS
(HAR NTE
5%)
HAR AMOUNT
(GOVT ESS
ESTIMATE x
HAR%)
TOTAL ESS ESTIMATED
AMOUNT FOR CLIN 0007
(GOVT ESS ESTIMATE +
0006 ESS $600,000
Total Price (CLINs 0001-0006)____________________________
1.2 GENERAL BID NOTES
a. a. Award will be made on the total sum of Contract Line Items (CLINs) 0001AA and 0001AB. For CLIN 0001AB, enter unit price and extend total in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 0002 and CLIN 0003 to the Contractor at the proposed price within 120 calendar days after the contract award.
Firm fixed price is required for CLIN 0002 and 0003. CLIN 0001AB will be awarded at the unit prices indicated if these conditions are encountered during construction.
No provision is made for economic price adjustment. If Option is exercised within 120 calendar days after the contract award, the contract completion date remains unchanged.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with
FAR 17.206(b) Evaluation, not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) and planned modifications to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of Options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the Base Price, Unit Prices, and Options. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. Bonding is required for all CLIN 0001 items. If CLIN 0002 or 0003 is awarded, adjustment to bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
1.2.1 PLANNED MODIFICATION BID NOTES
These notes apply to Planned Modification CLINs.
a. The estimated amounts for FF&E, A/V, and ESS have been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E, A/V, and ESS including freight and installation charges. The Government FF&E, A/V, and ESS estimates are only estimated amounts.
b. If awarded, line items will be funded separately after completion of FF&E, A/V, and
ESS design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in RFP Sections, E20 FURNISHINGS, E10 EQUIPMENT, and D503005 SECURITY SYSTEMS.
c. Bonding is not required for the design, procurement and installation of FF&E, A/V, and ESS equipment.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E, A/V, and ESS not to exceed 5 percent. The Contractor will only be evaluated on the HAR rate applied to the Government Estimate. The actual total cost of the awarded planned modification will be the total of the accepted Final design packages for FF&E, A/V, and ESS plus their respective HAR rates included in the CLIN schedule. This fee shall account for administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E, A/V, and ESS. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E, A/V, and ESS. The proposed HAR is a fixed rate.
e. The Government is not obligated to award Planned Modification line items. Should the
Government choose to award a Planned Modification, the line item will be awarded as a negotiated modification to the contract. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E, A/V, and ESS.
f. If awarded, the FF&E, A/V, and ESS modifications will be awarded at least six months prior to the contract completion date. The Contractor's schedule must assume the award of the FF&E, A/V, and ESS as modifications. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award a Modification less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that accepted Final FF&E, A/V, and ESS packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E, A/V, and ESS are not available due to cause outside the Contractor's control or the Government's award of the modification is in the period less than the last six months of the contract.
1.3.1 Planned Modification-specific Bid Notes
a. FF&E: Design of the FF&E is performed under CLIN 0004. Upon Government approval of the preliminary design and best value analysis, a Best Value Determination (BVD) will be made and will be the rationale for selecting the FF&E vendor(s) for the project.
Accordingly, the price(s) provided by the selected vendor(s), using predominately negotiated price schedules from BPA, GSA or other Federal contracts, will be the basis for the actual cost of the Final FF&E Package. Submit the Final FF&E package, including pricing and vendor selection, not later than nine months prior to building completion.
b. A/V: Design of the A/V is performed under CLIN 0005. Infrastructure for A/V is performed under Base Bid included in CLIN 0001AA. Infrastructure for A/V includes, but is not limited to: conduits, wireways, junction boxes, pull stations, conduit and wireway supports, and pull string in conduits and wireways for A/V equipment wiring.
c. ESS: Design of the Physical Security Equipment (PSE), which includes the ESS is performed under CLIN 0006. Infrastructure for ESS is performed under Base Bid included in CLIN 0001AA.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --
Firm Submitting Offer: _____________________________________________________________
Phone: _______________________________________________________________________
Email:________________________________________________________________________
Signature: ________________________________________________________________________
ACKNOWLEDGEMENT OF AMENDMENT(S)
IV. Provide Additional Files
The following files are hereby incorporated:
6_ESR_C10.pdf
(End of Summary of Changes)