6. ENGINEERING SYSTEMS REQUIREMENTS

D10 CONVEYING

SYSTEM DESCRIPTION

Conveying System(s) include weight handling equipment.

D1010 ELEVATORS AND LIFTS

Not Used.

D101001 GENERAL CONSTRUCTION ITEMS

Not Used.

D101002 PASSENGER ELEVATORS

Not Used.

D101003 FREIGHT ELEVATORS

Not Used.

D101004 WHEELCHAIR LIFT

Not Used.

D101005 DUMBWAITERS

Not Used.

D101090 OTHER VERTICAL TRANSPORTATION EQUIPMENT

Not Used.

D1020 WEIGHT HANDLING EQUIPMENT

D102001 OVERHEAD CRANES

Contractor shall coordinate with NAVFAC to ensure the Navy Crane Center is contacted early on in the design by and shall be included in the design discussion in accordance with SECNAVINST

11260.2 Department of the Navy Weight Handling Program for Shore Activities, NAVCRANECEN Instruction 11450.1C, NAVCRANECEN Instruction 11450.2A, NAVFAC P-307 Management of Weight handling Equipment, and NAVFAC Engineering & Construction Bulletin Issue No. 2012-03.

The NAVFAC project structural engineer shall be included in all discussions between the EOR and the Navy Crane Center. All communication with The Navy Crane Center shall be through NAVFAC .

The Navy Crane Center shall be included as a reviewer for all DB/AE2 submittals and shall be listed

PART 3 - CHAPTER 6 / ESR D10 - Page 2 as a reviewer during construction shop drawing submittal reviews.

Runway rails for top running cranes and necessary foundations are to be provided by the facility Contractor. Coordinate with the Navy Crane Center for additional requirements.

Preliminary Crane Specifications: Cranes will be top running, double girder bridge cranes with top running trolleys. The following information can be used for bidding:

(Quantity-2) 40T overhead electric traveling (OET) cranes with a 28’-4” high hook position above finished floor for Maintenance Bay 01 and Pool Deck. Estimated wheel load for each 4-wheel crane is 70 kips/wheel with wheels spaced at 13 feet. Runway rail shall be 100 lbs/yd. 11’-0” of clear, unobstructed space shall exist above the crane rails for the crane operating envelope.

(Quantity-1) 65T OET crane with a 28’-4” high hook position above finished floor for Maintenance Bay

02. Estimated wheel load for the 4-wheel crane is 115 kips/wheel with wheels spaced at 13 feet.

Runway rail shall be 175 lbs/yd. 11’-0” of clear, unobstructed space shall exist above the crane rails for the crane operating envelope.

The estimated distance from high hook position to top of runway rail is 3 feet for each crane. New runway rails shall be provided for top running cranes. Rails shall be arranged such that joints on opposite sides of the crane runway will be staggered with respect to each other and with due consideration to the wheelbase of the crane. Rail joints shall not occur at runway girder splices.

The cranes will require 480V, 3-phase supply as noted below:

40T cranes' building circuit breaker ratings are estimated to be 150A each

65T crane's building circuit breaker rating is estimated to be 200A.

A floor-level disconnect shall be provided for each crane.

Cranes are likely to be Class C. Speeds are unknown at this time. Cranes will be controlled via portable radio controller.

D102002 MONORAIL SYSTEMS

Not Used.

D1030 ESCALATORS AND MOVING WALKS

D103001 ESCALATORS

Not Used.

D103002 MOVING WALKS

Not Used.

D103003 OTHER MOVING STAIRS & WALKS

Not Used.

D1090 OTHER CONVEYING SYSTEMS

PART 3 - CHAPTER 6 / ESR D10 - Page 3

D109001 PNEUMATIC TUBE SYSTEMS

Not Used.

D109002 CONVEYORS

Not Used.

D109003 LINEN, TRASH, AND MAIL CHUTES

Not Used.

D109004 TURNTABLES

Not Used.

D109005 OPERABLE SCAFFOLDING

Not Used.

--End of Section--