1. CONTRACT ID CODE PAGE OF PAGES
J 1 71
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. PROJECT NO. (If applicable) 0004 12/18/2020
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-20-R-0105
9B. DATED (SEE ITEM 11)
10/13/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
P907, DESIGN-BUILD, DRY COMBAT SUBMERSIBLE OPERATIONS FACILITY, JOINT EXPEDITIONARY BASE (JEB)
LITTLE CREEK- FORT STORY, VIRGINIA BEACH, VIRGINIA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0004
The purpose of this amendment is to provide the following:
1. Pre-Proposal Inquiry (PPI) Responses
2. Revise General Requirements, Price Proposal Form
3. Provide additional files
All other terms and conditions remain unchanged.
I. Pre-Proposal Inquiry (PPI) Responses
No.
Date
Submitted
LEAVE
BLANK
Reference
Question Response Page Section Paragraph
1 10/16/20 3 Proposal Due
Date
Will the government consider extending the proposal due date by 3 weeks?
Refer to Amendment
2 10/19/20 1
C30 SSPC QP 9
Certification
Part 3 of the RFP requires SSPC QP 9 Certification, this certfication appears to be unnesscary for the scope of work in this RFP, please remove the requirement for the SSPC QP 9 Certification.
Refer to Amendment 0004 Continuation Sheet Titled “Q907 Amendment 0004 Cont Sht RFIs 1 – 250.doc
3 10/19/20 G103010
TEMPORARY
DEWATERING
Please provide additional direction and information on "all necessary environmental permits" in regards to the temporary dewatering requirements.
Applicable permits include, but may not be limited to, VA DEQ Erosion and Sediment Control permit and Stormwater permit.
4 10/19/20 1 D102001
OVERHEAD
CRANES
The RFP states that the Navy Crane Center will procure three bridge cranes.
1) Please clarify procurement to what extent, FOB to the jobsite?
2) Will the contractor be responsible for installation, testing, and warranty?
3) For bidding purposes, please provide an assumed date or number of days after award for cranes to arrive on site.
NCC will procure the cranes via a separate contract, FOB to crane acceptance (after field installation and testing). NCC's crane contractor will be responsible for installation, testing, and warranty. For bidding purposes, the cranes can be assumed to arrive on site approximately 27 months after facility contract award.
5 10/19/20 1 D102001
OVERHEAD
CRANES
In order to design the structure (footings, supports, connections, power, controls, loads, spacing, access) suitable for the Navy supplied cranes, please provide complete specifications for alll three bridge cranes prior to bid. Including crane platforms if relevant.
KTR to coordinate with Crane Center at the CDW stage for crane specifications and requirements .
6 1019/20 1 D102001
OVERHEAD
CRANES
Please provide any design and construction requirements for the Navy supplied bridge cranes.
KTR to coordinate with Crane Center at the CDW stage for crane specifications and requirements .
7 1019/20 D102001
OVERHEAD
CRANES
Please confirm if the Navy Crane Center Checklist will be a requirement of the RFP, if so please provide all necessary documentation.
No.
8 10/21/20 Page 3 of
Although the RFP is providing 5 weeks from solicitation until the due date, and does provide fairly well established site plans and floor plans, there are still 1,400 pages of the RFP to digest. In addition, the design of the engineering systems for the building, in particular for the foundations and pool, is no small task. We respectfully request a two week bid extension until December 3rd (one week would push into the Federal Holiday). This would allow all bidders ample time to digest the RFP, design/engineer the necessary systems, and provide a complete and competitive price to the Gov't.
Refer to PPI 1 response.
9 10/23/20 3 Part 3-Chapter 1 5
Air conditioning and heating capacities are in conflict with Chapter 6 D30 HVAC. Which capacities are correct?
Air Conditioning and Heating Capacities shall be sized per ASHRAE and applicable UFC's.
However capacities shall not be less than the minimum capacities listed in Chapter 6 D30.
Contractor responsible for final equipment sizing.
10 10/23/20 6 Factor 2: (a)(1) 1
Please clarify what is intended by the statement:
"Also describe how the solution for each facility will provide baseline ASHRAE 90.1, based on life cycle cost effectiveness."
Bid per RFP.
11 10/23/20 7 Factor 2: (b) 1 - 8
We do not see the documents referenced below included in Part 6:
"The Whole Building Energy Solution requires the use of the following documents included in Part 6 of this RFP:
- Government Baseline Building Performance Rating
- Government Baseline Building Energy Model (input-output) schedules (If the process and receptacle loads are not given in the schedules, assume they are 25% of the total load.)
- Default simulation factors
- Utility Costs (energy rates) for project, based on local unburdened PWD rates
- “Whole Building Energy Simulation” templates
- “Performance Rating Method Compliance Reports”"
To be addressed in a subsequent amendment
12 10/27/20 Part 3 D102001
The RFP notes the OH Bridge Cranes will be GFCI, and that the Navy Crane Center will be contacted early on in the design for coordination.
Critical information about the cranes is required to assemble the bids up front (type … underhung and top running mentioned;
details on depth/height of crane and assembly for coordination with structure/roof/clear height;
details on tracks required and loads imposed on structure; etc.). What information can be provided to the D/B teams during the bid to help answer what type of cranes the Navy Crane Center intends to use/select?
KTR to coordinate with Crane Center at the CDW stage for crane specifications and requirements .
13 10/27/20 2 Chapter 6 / ESR
D30 Chapter 6
What is the full range of air temperatures to be achieved in the pool area?
The inside conditions list 78-88F summer and 68F winter. Will there be any simulations that require colder temperatures within the space when the water is at the low end of the range at 37F?
Temperatures should be maintained as indicated in inside conditions.
14 10/27/20 Part 3 B3010
Section B301001 notes that steep slope roofing systems are preferred, and that standing seam metal roof is the only acceptable steep slope roof system.
Section B301002 notes that low slope roofing is acceptable, and that a three-ply built up roof with a modified bit cap sheet is the only acceptable low slope system. The drawings in part 6.B show a low sloped roof. Please confirm that a low slope, three-ply modified bit roof is required for this project.
Contractor has the option to provide a steep slope standing seam roof, low slope modified bitumen roof or a combination of the two. Steep slope is preferred however due to building size this may not be feasible in all locations.
15 10/27/20 Part 3 F104001
The RFP calls for tie-off cleats around the pool.
Will the submersibles be "propelled" while in the pool, and if so, what amount of thrust do they create?
No, submersibles will not operate under water. Tie offs are to prevent drift during submersion and retrieval processes.
16 10/27/20 Part 3 2.3
One of the project priorities is for "complete blackout conditions." Will anyone be allowed on the Pool Deck during these blackout conditions (full fall protection into the pool)? Emergency Exit Lighting/Signs must always remain on per life safety codes (including back-up power or batteries). Will the Navy have the authority to allow exit lighting to be turned off? We also assume this means any supplemental lighting on HVAC equipment, OH Cranes, etc?
Yes, pool deck will be used for training during blackout conditions.
Emergency lighting shall remain illuminated.
17 10/27/20 10 3 3.2.2.5
Part 3, Chapter 3, Page 10, Paragraph 3.2.2.5 states that "Permeable paving is not a preferred strategy" for stormwater management. However, permeable paving appears to be required for parking spaces in multiple other sections. Please clarify if permeable paving is required, or not desired.
Permeable pavement is not required.
18 10/27/20 13 3 3.2.7.2
Part 3, Chapter 3, Page 13, Paragraph 3.2.7.2 gives very specific orientation for the POV parking lot. Is this orientation a requirement, or is an alternative layout acceptable?
Referenced paragraph supports RFP site plans and addresses multiple RFP requirements beyond parking orientation. Concept shown is one Government approved alternative. If the Contractor desires another alternative they do so at the risk of obtaining Government approval.
19 10/27/20 14 3 3.2.7.5
Part 3, Chapter 3, Page 14, Paragraph 3.2.7.5 states "Provide connection from bike/jogging path along entrance drive to Signal Point Road." No connection is shown on the drawings in Part 6. Please clarify if a 6-ft wide paved path is to continue north along to 20-ft clearzone of the fenceline on the western edge of the site, or if the bike path terminates at the secure entrance.
Provide connection from bike/jogging path along entrance drive to Signal Point Road.
20 10/27/20
Part 3, Chapter 6, Page 2 Paragraph G2010 states "The minimum PCC pavement must be 7" PCC surface course of 4,500 psi concrete." However, on Page 3, Paragraph G201003, PCC concrete is specified as 650 psi flex mix (which is typicall for NAFVAC projects). Please clarify is we are to use 4,500 compressive concrete, 650 flex mix, or a combination of both and where each mix should be used.
Concrete pavements shall have a minimum unconfined compressive strength of 4,500 psi and a flexural strength of 650 psi. Shall be used where concrete paving is shown in RFP.
21 10/27/20
Part 3, Chapter 6, Page 6, Paragraph G303006 and G303007 make references to Erosion and Sediment Control permit and State Stormwater Management permit. Should we assume that this is meant to reference the Construction General Permit, as VA does not have an ESC or Stormwater Management permit?
Yes, the Erosion Control and Stormwater must be reviewed and approved by VA DEQ as part of the General Permit.
22 10/27/20 B201001
Solicitation drawing elevation show insulated precast panels as the exterior wall types. RFP B201001 states 3 options for exterior closure. Are insulated precast panels the preferred option for the exterior? If not, why indicate insulated precast panels on the drawings?
Do the drawings take precedent over the RFP description?
Yes a insulated precast panel is the preferred option, however the contractor shall evaluate 3 options and determine best course of action. The drawings do not take precedence, see specification 01 33
10.05 20 Part 3 section
3.2 contract order of precedence.
23 10/27/20 B301001
Solicitation drawings show a low-slope roof system.
RFP B301001 states steep slope roof systems are preferred. What is the preferred roof system? Do drawings take precedent over RFP description?
Refer to PPI 14 response.
24 10/27/20
Roofing UFC 3-110-03 require a minimum 1/2/12" slope for new construction. Solicitation drawing elevations show roof elevation heights that are not achievable over the lengths of this building at 1/2"/12". Please confirm that the roof slope for this building can be lower than the minimum required in the UFC.
No, the UFC minimum roof slope is required.
The solication drawings are a basis of design, contractor is responsible for meeting all building codes, UFC, RFP, etc.
25 10/28/20 2 Part 3
Chapter 2
2.3.5 Accessibility Requirement
s
Please confirm that ALL areas within the building, except Pool, need to comply with barrier-free design in compliance with
UFC 1-200-01.
Confirmed, all facility areas including pool deck shall be ABA accessible. The only exception is that pool does not require ABA access or ABA approved pool lift.
26 10/28/20 20 Part 3
Chapter 5 - Pool Mechanical
B203001 Exterior Doors & B203004 Overhead Roll-Up Doors
Line items indicate to provide a 42"W exterior (man) door and 12'W x 10'H overhead roll-up door, however the concept floor plan of the Pool Mechanical room does not have enough lineal feet of exterior wall to accommodate both these items. Please confirm door size requirements.
36" wide door is acceptable. RFP drawings are conceptual only.
Minor changes may be required by contractor to meet RFP, building code, and UFC requirements.
27 10/28/20 Part 6 - 6.C.2
Room Planning Sketches
Maintenance Bay 01 &
Long Term Storage
Based on the equipment sizes and quantities detailed in the RFP room planning sketches, there appears to be insufficient floor plan area within the Maintenance Bay 01 and Long Term Storage to physically fit the items as indicated. Please confirm these sketches are conceptual in nature and in conjunction with final floor plans will be adjusted during Concept Design Phases and programming discussions with Activity Groups.
Room planning sketch for Maintenance Bay 01 shall be revised to incorporate 3 bays in lieu of 4. The fourth bay will be shared with Long Term Storage if needed. Revise equipment quantities per the following.
3. Maintenance dolly (3)
4. Storage Cage (6)
5. Vidmar (18)
28 10/28/20 5 Part 3
Chapter 2
2.7 Adaptability
And Flexibility
If it is the intent of the Governemnt to require the contractor to include provisions for the future adjacent facility, for purposes of bidding, please provide all relevant required information.
Bid per RFP.
29 10/28/20 9 Part 3
Chapter 3 3.2.2.4 Utilities
Paragraph states, “This extension must be sized to serve all buildings included in the master plan for this area.” For bidding purposes, please provide all relevant required master plan information to accurately size the waterservice line.
Refer to Amendment 0004 Continuation Sheet Titled “Q907 Amendment 0004 Cont Sht RFIs 1 – 250.doc”
30 10/28/20 6 of 25 RFP Part 1 Factor 2 - Energy Design
Reduction (b)
Factor 2 – Energy Design Reduction, requires the submission of all templates from the Whole Building Energy Simulation and the use of numerous documents noted in the RFP to be included in Part 6 Attachments such as “Government Baseline Building Performance Rating”, “Default Simulation Factors”, “Utility Costs”, etc. These documents were not included in the RFP and we are not able to prepare the energy model and required documentation without these documents.
Please provide the referenced documents and / or confirm if the submission requirements for this factor can be limited to the “Performance Rating Report”.
31 10/28/20 6 of 25 RFP Part 1 Factor 2 - Energy Design
Reduction (b)
This section of the RFP indicates to provide energy simulation results using the Whole Building Energy Simulation Templates provided in Part 6 of the RFP. These templates could not be located in Part 6.
In the past these government provided templates have included a Government Baseline workbook along with the baseline building performance rating assumptions to ensure the government is reviewing apples-to-apples comparisons between offerors. On previous projects the simulation factors included:
1. The specific weather file to be used by all applicants
2. Required occupancy of each room
3. Space usage classification for each room
4. Lighting schedule and calculation method classification
5. Unoccupied temperature setpoints and schedules
6. Infiltration rate assumptions for perimeter zones
7. Receptacle and plug load assumptions
8. Service hot water space usage classification
9. Elevator schedules
10. Parking lot lighting classifications
11. Burdened utility rates for the Base
Please confirm that the Factor 2 Paragraph (1)(b) Whole Building Energy Simulation is a requirement of this RFP and the indicted information above will be provided. If it was not the intent to provide this information please confirm that Factor 2 Paragraph (1)(b) can be excluded and the Paragraph (1) Energy Efficiency Narrative still applies.
32 10/28/20 6 Part 1 Factor 1 (b)
The RFP states: "The Government will evaluate the Offeror’s technical solution to determine adherence to or enhancement of the technical requirements of the RFP." (a) Is the term enhancement to be considered the same as a betterment? (b) Are enhancements allowed to contradict or deviate from base RFP requirements?
Confirmed, enhancement is equivalent to betterment.
Enhancement may deviate from base RFP requirements, but they may not contradict RFP base requirements.
33 10/27/20 8 3 3.2.2.3
Part 3, Chapter 3, Page 8, Paragraph 3.2.2.3 states "The western gate must be wide enough to accommodate MTL access….." It appears from the drawings in Part 6 that the MTL gate is the eastern gate. Please confirm.
Correct. The eastern gate is the MTL gate.
34 10/30/20 1 E1010
Is the Equipment Specialist required to develop package similar to the FFE and AV? Is the equipment a contract mod similar to the FFE and
AV?
FFE and AV must be Contractor designed and are planned modifications.
35 10/30/20
Can the SID and FFE “Over the Shoulder” meetings be combined to reduce the amount of travel?
Yes, as long as this is coordinated with all key stakeholders to confirm their participation.
36 10/30/20 E20
Please clarify selection of Interior finishes. Chapter 6.J, NSWG Standard Interior Material Palettes are included in RFP.
Section Part 3, E20, pg 3 states selecting multiple finish schemes for presentation to NAVFAC and the Activity. Are these schemes based on the included NSWG Standard Interior Material Palettes standards?
Yes, the options should be based on the included color schemes.
37 10/30/20 01 45 00.05 20 and 01 91 100.15 22
1.1
01 91 00.15 22 para 1.1
SUMMARY:
"Commission the building systems listed herein. The Government will employ the services of an independent, Commissioning Firm acting as the Commissioning Authority (CxA). The Contractor will support the commissioning efforts described herein. Conform to the commissioning procedures outlined in this specification and the Design Phase Commissioning Plan in Appendix A, developed during the design phase of this projects and inserted into the specifications before design is Issued For Construction (IFC)."
Per RFP specification section 01 91 00.15 22, the Commissioning Authority will be provided by the Government but there are several other references in Division 01 (such as in 01 45 00.05 20) that state that commissioning shall be by the Contractor.
Please advise if Commissioning shall be included in the General Contractor's scope of work or if this is by NAVFAC.
If this shall be by the GC, please consider a bid extension so that this scope can be adequately captured. There are multiple systems that are outlined to be commissioned that require time to review if this shall be provided by the Contractor.
The Commissioning (Cx) Firm and Commissioning Authority (CxA) will be provided by separate contract with the Government and not hired by the General Contractor.
References to the Cx Firm, the CxA submittals, and the CxA responsibilities mean the Government-hired Cx Firm and CxA.
38 10/30/20 1 01 31 23.13 20 1.1
Per spec 01 31 23.13 20 contract states for eCMS to be used. However, this system has not been required on other recent project due to shortfalls. Is eCMS intended for use on this project?
Bid per RFP.
38 10/30/20 2 01 31 23.13 20 1.4.3
This specification section states, "Provide a tablet computer with a Common Access Card (CAC) reader at the job site for Government use only. The tablet computer must have a web-browser, built-in camera, and cellular data connectivity. The tablet computer must be fully charged and made available at all times for Government use to facilitate the input of construction data at the job site. After completion of the work, reset the tablet computer to factory default settings. The tablet computer remains the property of the Contractor and must be removed from the site."
Please provide a preferred product that is compatible with CAC cards in Attachments 6 so that the correct product can be included. Pricing varies significantly depending on the type of product required.
Bid per RFP to meet performance requirements.
40 10/30/20 3 01 33 00.05 20 1.3
This specification section states, "The use of a "G" following a submittal indicates that an approval action is required, either by the Government or by the Contractor's Designer of Record (DOR) or QC Specialist." There are instances where a submittal is designated as "G" but it is unclear if the submittal is required to ultimately be approved by the DOR or by the Government.
It is suggested to designate submittals in the register and specifications as follows: For Government Approval (FGA), For Government Surveillance (FGS), and DOR for submittals requiring review by the DOR. Both FGA and FGS would be required to be reviewed by the DOR prior to submission to the Government .
Refer to response to
PPI 42.
41 10/30/20 13 01 45 00.05 20 1.4.5.5
"01 45 00.05 20 para 1.4.5.5:
Telecommunications Systems QC Specialist:
The Telecommunications Systems QC Specialists may be required on site, full time with 10 years minimum experience in telecom installation and experience. Specialist shall be very familiar with UFGS Divisions 27, 28, and 33 concerning communications systems work and installation."
Please specify if this specialist shall be a requirement on this project and the extent to which they are required to be on-site: during telecommunications backbone installation only, during pulling only?
Telecommunications Systems QC Specialist is required on this project and must be on site for backbone installations, hardware installations and system functionality testing.
42 10/30/20 3 01 45 00.05 20 1.4
This specification section / paragraph indicates that Government Approval is required for submittals with a "G" designation.
However, specification section 01 33 00.05 20 para 1.3 states that all submittals identified as "G" are either for Government or DOR review.
Are submittals marked with "G" for Government only or for Government or DOR review? It is recommended to identify submittals with For Government Approval (FGA), For Government Surveillance (FGS), For DOR Review (DOR).
In this instance, will submittals pertaining to the special inspections be ultimately reviewed by the Government or the DOR?
The "G" designation indicates that Government approval is required.
43 10/30/20 01 57 19 1.6.5.1
01 57 19 para 1.6.5.1 Pest Control Training:
"Trained personnel in pest control. Conduct a pest control meeting for personnel prior to commencing construction activities. Conduct additional meetings for new personnel and when site conditions change.
Include in the training and meeting agenda: methods of detecting and pest infestation;
familiarization with statutory and contractual pest control standards;
installation and care of devices, and instruments, if required, for monitoring purposes to ensure adequate and continuous pest control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of waters of the United States, and endangered species and their habitat that are known to be in the area. Provide a Certificate of Competency for the personnel who will be conducting the pesticide application and management of pest control."
Please advise as to the kind of pest that this training should be focused on. Is there currently a pest issue in this area? Are the personnel being trained construction personnel or is this to be the end user?
We recommend to delete this requirement unless additional information can be provided regarding the training, intent, and trainees.
Pest control is not anticipated for this project.
44 10/30/20 Chapter 6.C - Architectural
Room Planning Sketches
In section 6.C.2 of the RFP, the Room Planning Sketches, there are various items listed that are not included in the FF&E package (i.e. storage cages, moveable work table, etc).
Please verfiy these items will be part of the FF&E package.
Equipment will be provided within FF&E unless specifically noted in room requirements. See amendment for cage requirement within Mainetnance Bay 01.
45 10/30/20 Part 3 - Project
Program
Room Requirement s
The Room Requirements call for HDPE 36" wide lockers in the locker rooms. The largest HDPE locker on the market is 24" wide. Please verify if a 36" wire mesh locker or 24" HDPE locker is preferred.
Wire Mesh Lockers for 36" lockers are acceptable. See amendment for revised
ESR C10.
46 10/30/20 01 14 00.05 20 1.4
The security requirements references "FAC 5252.236-9301," which states (6) 2 hour shut downs, and (1) 4 hour shut down per month are to be anticipated in the Limited Area. It also notes that all vehicles entering the worksite are subject to a "blank" hour delay, and that all work vehicles are subject to rigirous searches that enter the Limited area, and no POV's are allowed in the Limited Area.
Please define the Limited Area on the site plans provided in the RFP, and confirm the above restrictions/loss of productivity are to be priced into the offer. Also define the average expected delay at the gate.
Bid per RFP.
Contractor to use knowledge of the local, client, and security procedures to account for time allocation.
47 10/30/20 01 30 00.05 20 1.6
Please confirm if the American Preference Policy applies to only the General Contractor, or to Subcontractor's with a subcontract value over $1M as well.
Bid per RFP.
48 10/30/20 Part 3 - Chapter 6 F104001
The RFP is calling for an "external" 40,000 gallon surge tank, with a modulating float valve.
The modulating float valve requries the surge tank to sit at the same elevation as the pool. Looking at C- 104, the area between the exterior of the building by the Pool Deck and the project LOD's has a proposed 12" water line, 10" sanitary line, second sanitary line, and underground communications ductbank running in this area, all under a paved roadway.
There is a little room outside the fence line, but that area is designated as a potential bioretention pond. This surge tank requires a 4,500 GPM gravity connection between the pool and surge tank, and return circulation lines to the pool equipment room (necessitating the surge tank be somewhere in the vacinity of the pool and equipment room).
Given all of the site constraints above, and requirement for the tank to be in the vacinity of the pool, please confirm if the surge tank could be placed below the pool deck, inside the building footprint.
This would provide long term energy savings for the Gov't, doesn't result in any hazards to the building/occupants, and can still accomidate the loads passing above for the pool deck.
At contractors option Surge tank can be located external to the building near the pool equipment area or adjacent to the pool between the pool and the entry to the pool area, but not within the drive aisle. Concrete Surge tank cap must comply with ESR B10 structural requirements. Open metal grating is not acceptable.
49 10/30/20 Part 3 - Chapter 3 3.1.4.1
Although the site appears to be virgin ground, can the Gov't please confirm that there are no known obstructions below grade.
There will be an extensive amount of work below grade on this project (foundations, sheeting/shoring, etc), and encountering manmade obstructions could cause significant delays during construction.
Bid per RFP.
50 11/02/20 12 Part 3 / Chapter 5 D203003
Please confirm that an acid neutralization tank and piping system is not required to be connected to the floor drain.
Provide floor drain per UFC 3-420-01 and
UFC 3-520-05.
51 11/02/20 15 Part 3 / Chapter 5 D203003
Please confirm that an acid neutralization tank and piping system is not required to be connected to the floor drain.
Provide floor drain per UFC 3-420-01 and
UFC 3-520-05.
52 11/02/20 60 Part 3 / Chapter 5 D202002
Please confirm that a tub filler with a thermostatic mixing valve to be able to control the temperature of the water is not required.
Temperatures should be limited and thermostatic mixing valves shall be provided as required by UFCs.
53 11/02/20 16 Part 3 / Chapter 5 D209001
Please confirm that the supply piping system between the government furnished equipment and the dive air room are part of the infrastructure.
Dive air system is furnished by government. See requirements in Part 6 chapter 6.G section 7 for minimal infrastructure requirements.
54 11/02/20 3,6,8,19 Part 3 / Chapter 5 D209005
Please confirm how many feet of hose is required for each hose reel.
Depending on final design and hose location, provide length as required to provide full coverage of space.
55 11/02/20 7 Part 4 / D20 D202003 1.7
Please confirm that a ASSE 1070 mixing valve is not required at public lavatories as noted in the IPC, Chapter 4, Part 416.5
TEMPERED WATER
FOR PUBLIC HAND
WASHING FACILITIES.
Temperatures should be limited and thermostatic mixing valves shall be provided as required by UFCs.
56 11/02/20 10 Part 4 / D20 D209005
Please confirm that there is not a list of equipment the air compressor serves noting the operating pressure and CFM's to be used for sizing the pipe.
There is not a list of equipment requiring compressed air
57 11/02/20 4 Part 3 / Chapter 6
/ ESR F10
Please confirm the location where the 40,000 gallon surge tank is to be located.
Refer to PPI #48
58 11/02/20 10 Part 3/ Chapter 3
3.2.2.5 /
3.2.7.2 / 3.2.7.10
Last sentence of second paragraph under 3.2.2.5 indicates permeable paving is not a preferred strategy.
Both 3.2.7.2 and 3.2.7.10 indicate that parking stalls are to have permeable pavers. In addition, ESR G303007 Stormwater Management indicates that permeable pavement or pavers is an acceptable LID feature. Please confirm that use of permeable pavement or pavers is required for this project.
Permeable pavement is not required.
59 11/02/20 15 Part 3 / Chapter 3 3.2.7.5
Paragrap indicates that biking/jogging trail along entrance road that connects to Gator Blvd. is required to be connected to Signal Point Road. Please confirm that biking/jogging trail.
Bid per RFP
60 11/02/20 15 Part 3 / Chapter 3 3.2.7.9
Indicates that higher aesthetic fenceoption is required between service drive and main walkway entrance. Please confirm that wrought iron fence is required from entrance road gate to east end of pedestrian gate/entrance plaza.
Base approved standard, higher aesthetic fence option is required, per RFP.
61 11/02/20 4 Part 3 / Chapter 6 D301005
The first sentence reads, “Provide a complete solar domestic hot water system…”. The second sentence reads, “Provide a system designed to furnish a minimum of 30 percent of the annual demand for domestic hot water if life cycle effective.” Please confirm that a solar domestic hot water system must only be provided if determined to be life cycle cost effective.
Solar hot water system to be provided unless solar hot water is not life cycle cost effective.
62 11/02/20 4 Part 3 / Chapter 6 D303001
This section requires a chilled water system for service to the building HVAC equipment. Please confirm that this requirement only applies to the four pipe fan coil system option.
HVAC system to be determined by design build contractor based on life cycle cost analysis.
63 11/02/20 5 Part 3/ Chapter 6 D303002
The first sentence reads, “Provide vertical water source or ground-coupled heat pump units…”. The following sentence reads, “Provide one vertical or horizontal water source or ground-coupled heat pump unit for each zone…”.
Please confirm that either vertical or horizontal water source heat pump units are acceptable.
Vertical or horizontal water source heat pumps are acceptable.
64 11/02/20 5 Part 3 / Chapter 6 D304001
The fourth paragraph states, “Provide with supply and exhaust/return fan with heat recovery element if called for or required by life cycle cost analysis.” As a life cycle cost analysis exercise does not call for or require any specific technologies, please confirm that heat recovery technology is required in the pool air handling unit unless demonstrated to not be life cycle cost effective.
Heat recovery to be provided if required by code.
If not required by code heat recovery shall be provided unless heat recovery is not life cycle cost effective.
65 11/02/20 5, 7 Part 3 / Chapter 6 D303002 and D305003
The referenced sections require one vertical mechanical unit per zone, located within a mechanical closet. The floor plans included in the RFP do not indicate the mechanical closets that would be required to satisfy this requirement.
Please confirm that horizontal units are acceptable, so that additional closets are not required at the expense of space square footage.
Vertical or horizontal water source heat pumps are acceptable.
66 11/02/20 9 Part 3 / Chapter 6 D309090
This section indicates requirements for total energy (enthalpy) type energy recovery wheels or fixed plate in the air handling system. It also requires heat pipe energy recovery in the air handling system. Please confirm that the intent of these requirements is to require energy recovery devices where required by code or UFC, and as life cycle cost effective to accomplish the required energy savings. Please confirm that the use of multiple energy recovery devices (i.e. enthalpy wheel or fixed plate and heat pipe) in a single air handling system is not required.
Heat recovery to be provided if called for by code.
If not required by code heat recovery shall be provided unless heat recovery is not life cycle cost effective.
Multiple heat recovery devices are not required except as needed to meeting required energy savings.
67 11/02/20 7 Part 3 / Chapter 6 D305002
This section states, “Provide unit heaters to serve the heating requirements of the facility.” The following sentence also states, “Provide gas-fired infrared heaters to serve the heating requirements of the facility.” Please confirm that most of the facility is to be heated by the selected central mechanical system (FCUs or VAV or WSHP) and that the type(s) of heaters in spaces not served by the central mechanical system is/are to be selected by the offeror based on the options indicated in this section.
HVAC system to be determined by design build contractor based on life cycle cost analysis.
Spaces not served by central system may be served by heater types indicated.
68 11/02/20 3, 6 Part 3 / Chapter 5
Room Requirements
MAINTENA
NCE BAY 1
and
MAINTENA
NCE BAY 2
D3040: Please provide the number of vehicle exhaust reel drops required in each space.
Provide one hose reel for each bay.
69 11/02/20 8 Part 3 / Chapter 5
Room Requirements
LONG
TERM
STORAGE
D3040: Please clarify the cfm requirements for the exhaust retractable reel.
Also, please clarify whether the ductwork and fan associated with the exhaust reel is to be provided as part of this project.
Provide exhaust as part of maintenance bay vehicle exhaust.
70 11/02/20 19 Part 3 / Chapter 5
Room Requirements
POOL
DECK
D3040: Please provide the number of vehicle exhaust reel drops required in the space.
See PPI #68
71 11/02/20 49 Part 3 / Chapter 5
Room Requirements
WETSUIT
DRYING
ROOM
The HVAC requirements do not indicate specific dehumidification criteria for a space that appears intended to dry as many as 50 wetsuits. Please confirm the indoor design conditions for this space are 78 Fdb & 50 percent RH (uncontrolled) for summer and 68 Fdb with no RH requirement in the winter, per the table in Part 3 Chapter 6 D30 page 2.
Provide wall mounted or horizontal ducted dehumidifier to maintain relative humidity below 60%
RH
72 11/02/20 Solicitation
p. 7 of 25
EVALUATION
FACTORS FOR
AWARD
Factor 2 - Energy Design
Reduction
This factor references multiple documents in Part 6 of the RFP, including:
“Government Baseline Building Performance Rating, Government Baseline Building Energy Model (input-output) schedules, Default simulation factors, Utility costs, Whole Building Energy Simulation templates, and Performance Compliance Reports.” These documents do not appear to have been included in the RFP, and are necessary to be able to perform the energy modeling and life cycle cost calculations required to respond to Factor 2 and the RFP requirements. Please provide this information.
Refer to PPI #11
73 11/02/20 8 Part 3 / Chapter 6 D306001
This section refers to D50 and G30 for metering of electrical energy and potable water. Please clarify whether these meters are required to be monitored by the DDC system, or a basewide AMI system, or both.
Monitor the Meters through the DDC /
UMCS.
74 11/02/20 5 Part 3/ Chapter 5 C101001
This section calls for CMU walls of Battery Storage 02 to be full height to roof deck. It is unclear if this indicates underside of Maintenance Bay 02 roof or if the rooms inside the Maintenance Bay 02 are capped. Battery Storage 01 does not require such full-height walls - please verify.
Battery Storage 02 CMU walls shall extend to concrete lid.
Rooms within Maintenance Bay 02, Calibration 102, Battery 103, Parts Storage 104, Dive Air 105 Tool Room 106 and Training 107 all will have a concrete cap. Battery Storage 01 shall extend to underside of deck as indicated.
75 11/02/20 4 Part 3 - Ch 1 6
How often does the transition from fresh water to salt water occur?
Transition from fresh to salt water expected to be twice a year.
76 11/02/20 4 Part 3 - Ch 1 6
How is the salt water condition achieved?
Adding raw salt or using surrounding saltwater from the Bay?
Raw salt will be added to the pool to create saltwater conditions.
77 11/02/20 4 Part 3 - Ch 1 6
How quickly should the pool be able to be drained?
Pool water to be pumped onto trucks and taken off-site.
78 11/02/20 2 Part 3 - Ch 6 -
F10
Should the visible interior of the pool vessel be smooth raw concrete, with waterproofing integral with the concrete rather than a second surface applied material?
Provide surface applied waterproofing to the inside of the pool and surge tank.
79 11/02/20 1 Part 3 - Ch 6 -
F10
Is the pool vessel required to be designed with sufficient mass in the pool walls and/or pool floor to achieve negative buoyancy when empty with respect to groundwater?
The pool vessel and surge tank are to be designed with a deep foundation system to resist all buoyancy forces.
80 11/02/20 Part 3 2.3.5
Part 3 - 2.3.5 Accessibility requirements are for barrier-free design in accordance with UFC 1- 200-01. Cabinets in Part 3
5.0 - Room Requirements are called out as 36"H. Is the intent to provide ABA/ADA compliant cabinets at 34"H?
Correct. All cabinets shall be revised to 34"H to meet ABA requirements.
81 11/02/20 ESR - E1010 1
Women's shower has swimsuit extractor referenced in ESR E1010 is included in room data sheet and in FF&E estimate. Men's shower has wetsuit spinner in FF&E only. Verify if this is funded in the FF&E package or the construction contract?
Swimsuit extractor unit is furnished within the FF&E package.
However floor drains are to be provided in the construction contract. See room requirement sheets Male Locker Room and Female Shower Area.
82 11/02/20 ESR C301090
ESR C301090 calls out solid surface shower pan receptors, Shower Area (Female) calls for D201005 - Terrazzo Shower Floor. Verify if the intent is to provide terrazzo shower pans or solid surface?
Provide Terrazzo shower pans.
83 11/02/20 ESR E1020
Please clarify what equipment is included in the equipment package that is to be funded as part of the construction contract base bid referenced in E1020?
E1020 is a general heading. See subheadings for additional information (i.e. E102001, E102009, etc.)
84 11/02/20 ESR D4040
If the pool areas are separated from the remainder of the facility as is typical for pools please clarify that corrosion resistant sprinkers are required thoughout the facility and not just in the pool areas.
Corrosion resistant sprinklers are required throughout entire building as stated in D4040.
85 11/02/20 ESR D4040
Are the lithium battery rooms to be protected as an extra haxard occuancy with a design density of
0.30 gpm/ft2 over a remote area of 2,500 ft2?
Lithium batteries to be protected as extra hazard occupancy.
86 11/02/20 ESR D4020
What is the basis for the fire pump rating of 750 gpm?
Basis is a 2,500 sq ft sprinkler area at 0.3 gpm/ft2 with 25% Imbalance (938 gpm).
Pump will operate at
1.25 base rating.
87 11/02/20 ESR D4010
Specification 28 31 76 was attached to the RFP.
Typically NAVFAC Midlant has required the use of specification 28 31
76.22. Please clarify which
specification is to be used for the project.
Specification 28 31 76 has been reviewed and approved by NAVFAC. Continue with original packaged documents.
88 11/02/20 2 Part 3/ Chapter 5 Maintenance
Bay 01
RFP Says: See Floor Plan and Section 6 Attachments for bay layout. Clear interior dimensions= 40’ wide x 80’ depth, 40’-0” clear to bottom of structure. Confirm this is 40' clear to bottom of bridge crane beam.
Confirmed: 40' is the clear distance to bottom of structure
89 11/02/20 2 Part 3/ Chapter 5 C102091
Do doors leading into the pool area need to be insulated?
Yes, All doors and coiling doors shall into pool area shall be insulated.
90 11/02/20 327 Part 3/ Chapter 5
Rooms tool rm, dive air, Parts Store, Batt 02, & Calibrations look to need 12' ceilings. There also appears to be a concrete slab roof on these spaces so the bridge crane can pass above them. Will this slab be used for storage and does it need to be able to support a specific loading?
Slab is not to be used as storage. Concrete slab is for protection from items being dropped from the bridge crane. Slab design shall support minimum 150 LB/SF.
91 11/02/20 340 Part 3/ Chapter 5
Confirm clear height at pool deck to bottom of bridge crane rail of 40'
Confirmed: 40' is the clear distance to bottom of structure
92 11/02/20 334 Part 3/ Chapter 5
Confirm there are no special explosion considerations in the battery rooms 01 & 02.
Battery rooms to comply with UFC 3- 520-05
93 11/02/20 2 Part 3/ Chapter 5 C101001
Certain room requirements say to provide CMU walls as the fixed partitions.
There are multiple conditions that these rooms occur on the exterior perimeter of the building.
Would the backup of a precast exterior panel satisfy that requirement?
Or will a masonry backup wall be required in addition to precast panels?
Yes, fixed partitions are referring to the interior walls.
Concrete exterior wall system is acceptable.
94 11/02/20 SHEET 00G001
In order to determine appropriate fixture counts, the correct occupancy loads need to be identified for the Pool and Pool Deck area. The RFP drawings suggest standard loads from NFPA 101 Table
7.3.1.2 that correspond solely to a swimming pool and pool deck. Please advise
Life Safety elements (egress path, doors, etc.) shall be designed per NFPA 101 Table
7.3.1.2. For plumbing
fixtures maximum occupancy shall be 75 occupants on the pool deck and within the pool.
95 11/02/20 SHEET 00G001
In regard to the previous PPI above (CN45), once the occupancy types are finalized, the fixture counts can be finalized as well.
However, the RFP drawings suggest a different ratio other than 50-50 male to female in this facility. For proper fixture counts, please verify if there is a suggested ratio of users in the building. Right now it is showing 60/40 for toilets, 95:6 lockers, and 14:2 showers male to female.
Bid per RFP
96 11/02/20 Part 4 D503005 and F104002
D503005 1.3 details SCIF criteria, but F104002 is Not Used and a SCIF is not listed in the Room Requirements. Command planning Room under Room Requirements lists SIPR connections for students, but a separate SIPR Room is not listed.
Will this effort require design for SCIF or a SIPR room?
A SCIF is not required within this facility.
The facility will have SIPR requirements.
Single Telecom room was sized to allow for required clearance between NIPR and SIPR. As the floor plan is conceptual only Contractor/ AE shall determine clearances can be met in final design. Two telecom rooms is an acceptable alternative.
97 11/02/20 Part 3 D503001
Is it acceptable to provide wall mounted telecommunication racks in maintenance bays or is an telecom room required?
Wall mounted telecommunication racks are not acceptable. Telecom rooms shall be provided as required.
98 11/02/20 Part 3 D501003
Is it acceptable to provide wall mounted panelboards in maintenance bays or is an electrical room required?
A main electrical room is required for main distribution equipment.
Distribution panelboards shall be allowed to be wall mounted in the mainteance bays.
99 11/02/20 Part 3 D503005
Is there a requirement for wall sensors for security?
Wall sensor provisions were never anticipated in the RFP generation, however, this decision is up to user's security group.
100 11/02/20 Part 3 D503005
Is the intent for security to be in the main telecom room?
The intent of the security is to be in the main telecom room, with monitoring capabilities at user defined areas.
101 11/02/20 Part 3 Ch 2 Section 2.3
Are you looking for blackout conditions only within the pool or also the surrounding pool deck?
Whereas minimum safety lighting is only required along the walking surface such as marker lights and aisle lighting.
Blackout conditions will apply to the pool deck also. Minimal egress/safety lighting shall be provided.
102 11/02/20 7 Part 3 / Chapter 6 D304008 / D305006
Please confirm that there are no prescribed requirements for packaged rooftop VAV air handling units (one of the three LCCA options) other than MERV 8 prefilters and MERV 13 final filters, and the very limited requirements in Part 4 D30.
Components to be similar to D304008 1.1.2
103 11/02/20 3 Part 3/ Chapter 5
MAINTENA
NCE BAY 1
and
MAINTENA
NCE BAY 2
Please confirm that full conditioning is required for the maintenance bays. This will consume a large amount of energy due to the amount of exhaust and make-up air required for these spaces
Full conditioning is required for the maintenance bays
104 11/02/20 Part 3/ Chapter 5/
POOL
MECH
ROOM
Room requirements call for 12'x10' overhead coiling door, but RFP drawings on Sheet A-100 indicate 8'x10' overhead coiling door instead. Is there specific equipment driving the overall width of the overhead door -documents do not match description.
8' Wide x 10' High Coiling door is acceptable and will meet equipment and supply delivery requirements.
105 11/5/2020 11 / 1432 01 14 00 1.2d
Does the government intend to use a government selected Telecommunications contractor?
KTR to provide all telecommunications materials and labor, with the exception of Government furnished hardware.
106 11/5/2020 11 / 1432 01 14 00 1.2e
Does the government intend to use a government selected NMCI contractor?
NMCI will make connections at patch panels only.
107 11/05/20
What classification level does the government require for the SIPRNET cabling
SECRET
108 11/05/20 What rooms/areas will be considered secured?
All Offices, Classroom and Conference room
109 11/05/20 342 / 1432 5 D503001
Shall the data/telephone outlet for the Pool Mechanical be on the SIPRNET or NIPRNET?
Data/telephone outlet for the Pool Mechanical shall be
NIPRNET.
110 11/05/20 360 / 1432 5 D503001
Please describe the type for (1) Data/Telephone outlet required for this area (Locker Room - Male)
Data/telephone outlet required for this area is intended for a phone and shall be
NIPRNET.
111 11/05/20 362 / 1432 5 D503001
Please describe the type for (1) Data/Telephone outlet required for this area (Locker Room -female)
Data/telephone outlet required for this area is intended for a phone and shall be
NIPRNET.
112 11/05/20 364 / 1432 5 D503001
Please describe the type for (1) Data/Telephone outlet required for this area (Toilet Rooms Male & Female)
Data/telephone outlet required for this area is intended for a phone and shall be
NIPRNET.
113 11/05/20 366 / 1432 5 D503001
Please describe the type for (1) Data/Telephone…