This pre-solicitation notice seeks design-build construction services for Hurricane Florence recovery projects at Marine Corps Air Station Cherry Point in North Carolina. The projects include construction of a PMO/H&HS headquarters building, motor transportation/communication shop, fire stations, a range operations center, and academic facility/auditorium. The anticipated contract value is between $100-250 million, with a performance period of 1,826 calendar days from award. The solicitation will utilize best value tradeoff source selection with technical approach, experience, past performance, safety, technical solution, project management, and small business participation as evaluation factors. Price will also be considered. The NAICS code is 236220 and small business size standard is $39.5 million. The RFP is expected to issue on October 7, 2019 with drawings and specifications.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-1
ATTACHMENT F – PRICE PROPOSAL FORM
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the CLIN lump sum price for the following items:
CLIN 0001 – P162 BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0001 shall provide the full project scope, excluding other Base Bids (CLIN
0002 to 0005) and options, complete and in place in accordance with the RFP even if not specifically listed below.
0001A: P162A HH&S &MWHS-2 Headquarters:
Price for provision of all work for P162A complete.
Basis of Bid for CLIN 0001A shall be the Total Amount for CLIN 0001A, but not including the work indicated or specified to be provided under any other CLIN or option.
DESCRIPTION ESTIMATED
QUANTITY
UNIT TOTAL PRICE
0001AA All work complete in accordance with the RFP for CLIN 0001A including
0001AB, 0001AC, 0001AD
and 0001AE, but not including the work indicated or specified under 0001B.
1 LS $
0001AB Complete work for the facility Exterior Enclosure in accordance with the RFP.
Enter selected Exterior Enclosure System below:
1 LS $
0001AC Complete work for the facility inside the 5 foot line
1 LS $
0001AD Complete work for the site work outside the 5 foot line
0001AE Design work for CLIN 0001A 1 LS $
F-2
0001B: P162 B PMO Building:
Price for provision of all work for P162B complete.
Basis of Bid for CLIN 0001B shall be the Total Amount for CLIN 0001B, but not including the work
UNIT TOTAL PRICE
0001BA All work complete in accordance with the RFP for CLIN 0001B including 0001BB, 0001BC, 0001BD and 0001BE but not including the work indicated or specified under 0001A.
1 LS $
0001BB Complete work for the facility Exterior Enclosure in accordance with the RFP.
0001BC Complete work for the facility inside the 5 foot line
1 LS $
0001BD Complete work for the site work outside the 5 foot line
0001BE Design work for CLIN 0001B 1 LS $
Total CLIN 0001 (0001AA + 0001BA): $
CLIN 0002 – P254 BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0002 shall provide the full project scope, excluding other Base Bids (CLIN
0001 and 0003 to 0005) and options, complete and in place in accordance with the RFP even if not specifically listed below.
0002: P254 Station Academic Facility/Auditorium Replacement:
Price for provision of all work for P254 complete.
Basis of Bid for CLIN 0002 shall be the Total Amount for CLIN 0002, but not including the work
F-3
QUANTITY
UNIT TOTAL PRICE
0002AA All work complete in accordance with the RFP for CLIN 0002 including 0002AB, 0002AC, 0002AD and
0002AE.
1 LS $
0002AB Complete work for the facility Exterior Enclosure in accordance with the RFP.
Enter selected Exterior Enclosure System below:
1 LS $
0002AC Complete work for the facility inside the 5 foot line
1 LS $
0002AD Complete work for the site work outside the 5 foot line
0002AE Design work for CLIN 0002 1 LS $
CLIN 0003 – P246 BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0003 shall provide the full project scope, excluding other Base Bids (CLIN
0001, 0002, 0004, 0005) and options, complete and in place in accordance with the RFP even if not specifically listed below.
0003: P246 BT-11 Range Operations Center Replacement:
Price for provision of all work for P246 complete.
Basis of Bid for CLIN 0003 shall be the Total Amount for CLIN 0003, but not including the work indicated or specified to be provided under any other CLIN or options.
UNIT TOTAL PRICE
0003AA All work complete in accordance with the RFP for CLIN 0003 including 0003AB, 0003AC and 0003AD.
1 LS $
0003AB Complete work for the facility inside the 5 foot line
F-4
0003AC Complete work for the site work outside the 5 foot line
0003AD Design work for CLIN 0003 1 LS $
CLIN 0004 – P142 BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0004 shall provide the full project scope, excluding other Base Bids (CLIN
0001, 0002, 0003, 0005) and options, complete and in place in accordance with the RFP even if not specifically listed below.
0004A: P142A Main Fire Station Replacement:
Price for provision of all work for P142A complete.
Basis of Bid for CLIN 0004A shall be the Total Amount for CLIN 0004A, but not including the work
UNIT TOTAL PRICE
0004AA All work complete in accordance with the RFP for CLIN 0004A including 0004AB, 0004AC, 0004AD and 0004AE but not including the work indicated or specified under 0004B.
1 LS $
0004AB Complete work for the facility Exterior Enclosure in accordance with the RFP.
0004AC Complete work for the facility inside the 5 foot line
1 LS $
0004AD Complete work for the site work outside the 5 foot line
0004AE Design work for CLIN 0004A 1 LS $
F-5
0004B: P142B Satellite Fire Station:
Price for provision of all work for P142B complete.
Basis of Bid for CLIN 0004B shall be the Total Amount for CLIN 0004B, but not including the work
UNIT TOTAL PRICE
0004BA All work complete in accordance with the RFP for CLIN 0004B including
0004BB, 0004BC, 0004BD
and 0004BE, but not including the work indicated or specified under 0004A
1 LS $
0004BB Complete work for the facility Exterior Enclosure in accordance with the RFP.
0004BC Complete work for the facility inside the 5 foot line
1 LS $
0004BD Complete work for the site work outside the 5 foot line
0004BE Design work for CLIN 0004B 1 LS $
Total CLIN 0004 (0004A + 0004B): $
CLIN 0005 – P130 BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0005 shall provide the full project scope, excluding other Base Bids (CLIN
0001 to 0004) and options, complete and in place in accordance with the RFP even if not specifically listed below.
0005: P130 Motor Transportation/Communication Shop Replacement:
Price for provision of all work P130 complete.
Basis of Bid for CLIN 0005 shall be the Total Amount for CLIN 0005, but not including the work indicated or specified to be provided under any other CLIN or options.
UNIT TOTAL PRICE
0005AA All work complete in accordance with the RFP for CLIN 0005 including
0005AB, 0005AC, 0005AD
and 0005AE.
F-6
0005AB Complete work for the facility Exterior Enclosure in accordance with the RFP.
0005AB Complete work for the facility inside the 5 foot line
1 LS $
0005AC Complete work for the facility inside the 5 foot line
0005AD Design work for CLIN 0005 1 LS $
F-7
Refer to paragraph 1.3 for Planned Modification Bid notes.
CLIN 0006– Planned Modification for P162A – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the RFP and in accordance with the following schedule:
CLIN ITEM GOVERNMENT
FF&E
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
AMOUNT)
0006 FF&E $1,062,094
CLIN 0007– Planned Modification for P162A – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with the RFP and in accordance with the following schedule:
ESS ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0007 (GOVT ESS
ESTIMATE + HAR
0007 ESS $194,100
CLIN 0008– Planned Modification for P162A – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
RFP and in accordance with the following schedule:
A/V ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0008 (GOVT A/V
ESTIMATE + HAR
0008 A/V $412,200
F-8
CLIN 0009 – Option 1 for P162A: Price includes the following: NOT USED
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP even if not specifically listed below. Refer to paragraph 1.2 for explanation of option.
UNIT TOTAL PRICE
Non-load bearing cold-formed steel stud exterior wall backup construction
LS
CLIN 0010 – Option 2 for P162A - Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Provide terrazzo floor and base
CLIN 0011– Planned Modification for P162B – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0011 (GOVT FF&E
ESTIMATE + HAR
0011 FF&E $1,700,055
CLIN 0012– Planned Modification for P162B – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with
F-9
ESS ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0012 (GOVT ESS
ESTIMATE + HAR
0012 ESS $242,855
CLIN 0013– Planned Modification for P162B – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0013 (GOVT A/V
ESTIMATE + HAR
0013 A/V $615,300
CLIN 0014 – Option 1 for P162B: Price includes the following: NOT USED
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
CLIN 0015 – Option 2 for P162B: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Provide terrazzo floor and base
F-10
CLIN 0016– Planned Modification for P254 – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0016 (GOVT FF&E
ESTIMATE + HAR
0016 FF&E $777,615
CLIN 0017– Planned Modification for P254 – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0017 (GOVT ESS
ESTIMATE + HAR
0017 ESS $96,000
CLIN 0018– Planned Modification for P254 – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0018 (GOVT A/V
ESTIMATE + HAR
0018 A/V $808,700
CLIN 0019 – Option 1 for P254: Price includes the following: NOT USED
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
F-11
CLIN 0020 – Option 2 for P254: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Increase parking area by 20%
CLIN 0021 – Option 3 for P254: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Provide repaving of parking lot next to Post Office
CLIN 0022– Planned Modification for P246 – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0022 (GOVT FF&E
ESTIMATE + HAR
0022 FF&E $549,590
F-12
CLIN 0023– Planned Modification for P246 – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0023 (GOVT ESS
ESTIMATE + HAR
0023 ESS $121,200
CLIN 0024– Planned Modification for P246 – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0024 (GOVT A/V
ESTIMATE + HAR
0024 A/V $88,700
CLIN 0025 – Option 1 for P246: Not Used.
CLIN 0026 – Option 2 for P246: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Demolish current ROC building
CLIN 0027– Planned Modification for P142A – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
F-13
FF&E
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0027 (GOVT FF&E
ESTIMATE + HAR
0027 FF&E $1,794,805
CLIN 0028– Planned Modification for P142A – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0028 (GOVT ESS
ESTIMATE + HAR
0028 ESS $81,615
CLIN 0029– Planned Modification for P142A – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0029 (GOVT A/V
ESTIMATE + HAR
0029 A/V $135,600
CLIN 0030 – Option 1 for P142A: Price includes the following: NOT USED
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
F-14 steel stud exterior wall backup construction in administration area
CLIN 0031 – Option 2 for P142A: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Provide training catwalk
CLIN 0032 – Option 3 for P142A: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Recreational facilities demolition
CLIN 0033 – Option 4 for P142A: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Add repaving of parking lot next to Building 193
CLIN 0034– Planned Modification for P142B – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
F-15
FF&E
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0034 (GOVT FF&E
ESTIMATE + HAR
0034 FF&E $977,420
CLIN 0035– Planned Modification for P142B – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0035 (GOVT ESS
ESTIMATE + HAR
0035 ESS $75,410
CLIN 0036– Planned Modification for P142B – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0036 (GOVT A/V
ESTIMATE + HAR
0036 A/V $151,500
CLIN 0037 – Option 1 for P142B: Price includes the following: NOT USED
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
F-16 steel stud exterior wall backup
CLIN 0038 – Option 2 for P142B: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Add repaving of parking lot next to Building 192
CLIN 0039– Planned Modification for P130 – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0039 (GOVT FF&E
ESTIMATE + HAR
0039 FF&E $1,289,144
CLIN 0040– Planned Modification for P130 – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL ESS
ESTIMATED
AMOUNT FOR CLIN
0040 (GOVT ESS
ESTIMATE + HAR
0040 ESS $160,440
F-17
CLIN 0041– Planned Modification for P130 – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (A/V) complete in accordance with the
HAR (NTE 5%) HAR
AMOUNT
(GOVT A/V
ESTIMATE X
HAR%)
TOTAL A/V
ESTIMATED
AMOUNT FOR CLIN
0041 (GOVT A/V
ESTIMATE + HAR
0041 A/V $222,300
CLIN 0042 – Option 1 for P130: Price includes the following: NOT USED
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP steel stud exterior wall backup
CLIN 0043 – Option 2 for P130: Price includes the following:
Price for the Total Amount to provide the full option scope complete and in place in accordance with the RFP
Add the fueling station
1.2 Explanation of CLIN Items
CLIN 0001
Total amount of Base Amount CLIN 0001 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of specific work items as defined as follows:
CLIN 0001A: P162 A HH&S & MWHS-2 Headquarters - includes all P162F A Base Bid Work not included in CLIN 0001B and includes, but is not limited to, the design and construction of the building and site utilities; providing construction permitting fees, and all incidental and related work.
F-18
0001AA: All work complete in accordance with the RFP for CLIN 0001A and including the work indicated or specified under 0001AB through 0001AE.
0001AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. Enter selected Exterior Enclosure in the space provided.
0001AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, and equipment for construction of the facility and all incidental and related work.
0001AD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and equipment for grading and drainage, paving, utilities, and all incidental and related work.
0001AE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, electrical, and all incidental and related work.
CLIN 0001B: P162 B PMO Building - includes all P162F B Base Bid Work not included in CLIN 0001A and includes, but is not limited to, the design and construction of the building and site utilities; providing construction permitting fees, and all incidental and related work.
0001BA: All work complete in accordance with the RFP for CLIN 0001B and including the work indicated or specified under 0001BB through 0001BE.
0001BB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
0001BC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0001BD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0001BE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0002
Total amount of Base Amount CLIN 0002 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of
CLIN 0002: P254 Station Academic Facility/Auditorium Replacement - includes all P254F Base Bid
Work and includes, but is not limited to, the design and construction of the building and site utilities;
providing construction permitting fees, and all incidental and related work.
0002AA: All work complete in accordance with the RFP for CLIN 0002 and including the work indicated or specified under 0002AB through 0002AE.
F-19
0002AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
0002AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0002AD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0002AE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0003
Total amount of Base Amount CLIN 0003 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of
CLIN 0003: P246 BT-11 Range Operations Center Replacement - includes all P246F Base Bid Work and includes, but is not limited to, the design and construction of the building and site utilities; providing construction permitting fees, and all incidental and related work.
0003AA: All work complete in accordance with the RFP for CLIN 0003 and including the work indicated or specified under 0003AB through 0003AD.
0003AB: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0003AC: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0003AD: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0004
Total amount of Base Amount CLIN 0004 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of
CLIN 0004A: P142 A Main Fire Station Replacement - includes all P142F A Base Bid Work not included in CLIN 0004B and includes, but is not limited to, the design and construction of the building and site utilities; providing construction permitting fees, and all incidental and related work.
0004AA: All work complete in accordance with the RFP for CLIN 0004A and including the work indicated or specified under 0004AB through 0004AE.
0004AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. The reinforced CMU or reinforced concrete exterior wall back-up construction requirement will remain for the apparatus bays and other spaces required by criteria in the RFP. Enter
F-20 selected Exterior Enclosure in the space provided.
0004AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0004AD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0004AE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0004B: P142 B Satellite Fire Station - includes all P142F B Base Bid Work not included in CLIN
0004A and includes, but is not limited to, the design and construction of the building and site utilities;
providing construction permitting fees, and all incidental and related work..
0004BA: All work complete in accordance with the RFP for CLIN 0004B and including the work indicated or specified under 0004AB through 0004AE.
0004BB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. The reinforced CMU or reinforced concrete exterior wall back-up construction requirement will remain for the apparatus bays and other spaces required by criteria in the RFP. Enter selected Exterior Enclosure in the space provided.
0004BC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0004BD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0004BE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0005
Total amount of Base Amount CLIN 0005 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of
CLIN 0005: P130 Motor Transportation/Communication Shop Replacement - includes all P130F Base
Bid Work and includes, but is not limited to, the design and construction of the building and site utilities;
providing construction permitting fees, and all incidental and related work.
0005AA: All work complete in accordance with the RFP for CLIN 0005 and including the work indicated or specified under 0005AB through 0005AE.
F-21
0005AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. Enter selected Exterior Enclosure in the space provided. The reinforced CMU or reinforced concrete exterior wall back-up construction requirement will remain for the apparatus bays and other spaces required by criteria in the RFP.
0005AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0005AD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0005AE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0006 – Planned Modification for P162A
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the RFP.
CLIN 0007 – Planned Modification for P162A
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0001A.
CLIN 0008 – Planned Modification for P162A
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0001A.
CLIN 0009 – Option 1 for P162A NOT USED
In lieu of reinforced CMU or reinforced concrete exterior wall back-up construction, provide non-load bearing cold-formed steel framing exterior wall back-up construction.
CLIN 0010 – Option 2 for P162A
Provide terrazzo floor and base construction, in lieu of porcelain tile and base construction.
CLIN 0011 – Planned Modification for P162B
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0012 – Planned Modification for P162B
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this
F-22 item and shall be priced in the base bid CLIN 0001B.
CLIN 0013 – Planned Modification for P162B
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0001B.
CLIN 0014 – Option 1 for P162B NOT USED
In lieu of reinforced CMU or reinforced concrete exterior wall back-up construction, provide non-load
CLIN 0015 – Option 2 for P162B
Provide terrazzo floor and base construction, in lieu of porcelain tile and base construction.
CLIN 0016 – Planned Modification for P254
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0017 – Planned Modification for P254
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0002.
CLIN 0018 – Planned Modification for P254
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0002.
CLIN 0019 – Option 1 for P254 NOT USED
In lieu of reinforced CMU or reinforced concrete exterior wall back-up construction, provide non-load
CLIN 0020 – Option 2 for P254
Price for the work, design, and equipment to increase the parking area outside the facility by 20%.
CLIN 0021 – Option 3 for P254
Price for the work and equipment to repair and repave the parking lot next to the Post Office.
CLIN 0022 – Planned Modification for P246
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0023 – Planned Modification for P246
F-23
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0003.
CLIN 0024 – Planned Modification for P246
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0003.
CLIN 0025 – Option 1 for P246
Not used.
CLIN 0026 – Option 2 for P246
Price for the work, equipment, and expenses to demolish the existing ROC building.
CLIN 0027 – Planned Modification for P142A
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0028 – Planned Modification for P142A
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0004A.
CLIN 0029 – Planned Modification for P142A
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0004A.
CLIN 0030 – Option 1 for P142A NOT USED
In lieu of reinforced CMU or reinforced concrete exterior wall back-up construction, provide non-load bearing cold-formed steel framing exterior wall back-up construction in the administration areas. The reinforced CMU or reinforced concrete exterior wall back-up construction requirement will remain for the apparatus bays and other spaces required by criteria in the RFP.
CLIN 0031 – Option 2 for P142A
Price for the work, design, and materials to construct the training catwalk.
CLIN 0032 – Option 3 for P142A
Price for the work and equipment to demolish the recreational facilities.
CLIN 0033 – Option 4 for P142A
F-24
Price for the work, materials, and equipment to repair and repave the parking lot next to Building 193.
CLIN 0034 – Planned Modification for P142B
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0035 – Planned Modification for P142B
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0004B.
CLIN 0036 – Planned Modification for P142B
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0004B.
CLIN 0037 – Option 1 for P142B NOT USED
In lieu of reinforced CMU or reinforced concrete exterior wall back-up construction, provide non-load bearing cold-formed steel framing exterior wall back-up construction in the administration areas. The reinforced CMU or reinforced concrete exterior wall back-up construction requirement will remain for the apparatus bays and other spaces required by criteria in the RFP.
CLIN 0038 – Option 2 for P142B
Price for the work, materials, and equipment to repair and repave the parking lot next to Building 4203.
CLIN 0039 – Planned Modification for P130
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0040 – Planned Modification for P130
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0005.
CLIN 0041 – Planned Modification for P130
Price to procure and supervise installation of the Audio/Visual Equipment (A/V) complete in accordance with the RFP. A/V design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0005.
CLIN 0042 – Option 1 for P130 NOT USED
In lieu of reinforced CMU or reinforced concrete exterior wall back-up construction, provide non-load bearing cold-formed steel framing exterior wall back-up construction in the administration areas. The reinforced CMU or reinforced concrete exterior wall back-up construction requirement will remain for the
F-25 maintenance bays and other spaces required by criteria in the RFP.
CLIN 0043 – Option 2 for P130
Price for the work, design, equipment, and materials to add the covered fueling station.
1.3 Planned Modification Bid Notes:
a. The estimated amounts for FF&E and A/V have been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The Government FF&E Estimate is only an estimated amount.
b. If awarded, line items will be funded separately after completion of FF&E and A/V design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in E10, EQUIPMENT and E20, FURNISHINGS of the RFP..
c. Bonding is not required for the design, procurement and installation of FF&E.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and A/V. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the
FF&E and A/V. The proposed HAR is a fixed rate.
e. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.
f. If awarded, the FF&E and A/V modifications will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the
FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and A/V as modifications. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V were not available and the Government's award of the modification is in the last six months of the contract.
1.4 GENERAL NOTES
a. Submit offers using this Price Proposal Form.
b. Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by calculating the sum total price for CLINs 0006 through 0049 to the total price for CLINs 0001 through 0005. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
F-26
c. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
d. A firm-fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.
e. The Government reserves the unilateral right to award options to the Contractor at the proposed price within one hundred twenty (120) calendar days after contract award. The Government reserves the unilateral right to award planned modifications to the Contractor at the proposed price within five hundred forty (540) calendar days after contract award.
f. The performance period for the work required by base price shall be 1400 (fourteen hundred) calendar days from the date of award (includes 15 days for submission and approval of required bonds and insurance). If any or all of CLINs 0006 through CLIN 0043 are exercised, the contract completion date remains the same as that of the base price work (CLINs 0001 through 0005), as the work required by these options can be performed concurrent to the base work.
g. If CLIN 0006 through CLIN 0043 are exercised, additional bonding and consent of surety is required.
Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.