This pre-solicitation notice seeks design-build construction services for Hurricane Florence recovery facilities at Marine Corps Air Station Cherry Point in North Carolina. Package 1 includes replacement projects for the Provost Marshall Office and Headquarters buildings, a Motor Transportation and Communication Shop, two Fire Stations, the Range Operations Center at Bombing Target 11, and an Academic Facility and Auditorium. The design-build contractor will complete construction drawings and specifications. The Navy seeks a firm-fixed-price contract with an anticipated period of performance of 1,826 calendar days from award by July 20, 2020. The solicitation will utilize a two-phase evaluation of technical factors, past performance, safety, technical solution, project management and small business utilization, as well as price. The NAICS code is 236220 and size standard is $39.5 million. Market research was conducted and no reasonable expectation exists for adequate small business participation.
Attachment C Construction Design Experience Project Data Sheet
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Jan 2018 3
SOURCE SELECTION SENSITIVE INFORMATION
DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY
ATTACHMENT C: CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA
SHEET
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : CON Bldg #1 CON Bldg #2 CON Bldg #3 CON Bldg #4 CON Bldg #5
CON Theater #1 CON Theater #2
DES Bldg #1 DES Bldg #2 DES Bldg #3 DES Bldg #4 DES Bldg #5
DES Theater #1 DES Theater #2
1. Experience for: Offeror Joint-Venture Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
New Construction Renovation Repair Alteration Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price Cost/Time and Material Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
Revised Jan 2018 4
SOURCE SELECTION SENSITIVE INFORMATION
DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs
Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project: