UTF-C-103 Phasing Plan.pdf

PDF 3 MB Posted

Attached to
Design-Bid-Build, P409 Underwater Launch Test Facility (ULTF), Crane, Indiana
Solicitation number
N4008519R9186
Issued by

About this file

This document outlines the phasing plan and requirements for the Design-Bid-Build of the P409 Underwater Launch Test Facility in Crane, Indiana. The project constructs a new Underwater Launch Test Facility including an Underwater Launch Pit, Operational Support Building, Warehouse Building, Water Treatment Facility, and Mechanical and Electrical Building. Supporting facilities include site preparations, utilities, and environmental mitigation. Phase 1 requires the construction storage pad within seven months of award. Phase 2 provides shared access to the launch pit within twelve months and the OSB low bay within sixteen months. Phase 3 completes the project within eighteen months of award. The Department of the Navy Naval Facilities Engineering Command issued solicitation N4008519R9186 for the project, which will support submerged launch testing and evaluation starting in June 2020 through equipment outfitting in September 2021.

View the file

Other files

File Type Posted
Amendment 0015.pdf PDF
Streams and Wetlands Permit.pdf PDF
Amendment 0014.pdf PDF
NOSSA Final Site Approval.pdf PDF
NPDES Permit.pdf PDF
C2 OSB-A-017_C2 Weep Hole Edit.pdf PDF
G-002 Index Title Edit.pdf PDF
Spec Section 41 22 13.16 Page 2 Gantry Spec Typo.pdf PDF
G-003 Index Title Edit.pdf PDF
Amendment 0013.pdf PDF
UTF-C-002_CATEX Note 15 Removed.pdf PDF
Crane Test Facility Permit.pdf PDF
31 00 00 Blasting in LP only.pdf PDF
Amendment 0012.pdf PDF
PPI 109 UTF Drawing.pdf PDF
PPI 131 attachment Spec 22 00 00 Spec Edits.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
PPI 33 attachment_20200604rev1.pdf PDF
Amendment 0008.pdf PDF
PPI 35 attachment_01 57 19 Edits.pdf PDF
PPI 33 attachment_20200604.pdf PDF
PPI 26 attachment_BLDG3680-1629197-UTF-C-201_207-2A-2B.pdf PDF
1629197dwgVol1_Sheet092-107_C.pdf PDF
1629197dwgVol2_Sheet302-321_T.pdf PDF
1629197dwgVol2_Sheet338-350_E.pdf PDF
ULTF_Geotechnical Design Report Rev 2_Volume 2_Part2.pdf PDF
1629197dwgVol1_Sheet063-080_C.pdf PDF
1629197dwgVol1_Sheet042-046_B.pdf PDF
ULTF_Geotechnical Design Report Rev 2_Volume 2_Part1.pdf PDF
1629197dwgVol1_Sheet015-026_V.pdf PDF
1629197spcVol1_Divs 00-06.pdf PDF
1629197dwgVol1_Sheet136-149_C.pdf PDF
1629197dwgVol2_Sheet150-167_G.pdf PDF
ULTF_Geotechnical Design Report Rev 2_Volume 1.pdf PDF
1629197dwgVol2_Sheet331-337_E.pdf PDF
1629197dwgVol1_Sheet051_062_C site exist and demo.pdf PDF
1629197dwgVol1_Sheet108-121_C.pdf PDF
1629197dwgVol2_Sheet168-188_S.pdf PDF
1629197dwgVol1_Sheet122-135_C.pdf PDF
1629197dwgVol1_Sheet081-091_C.pdf PDF
1629197dwgVol4_Sheet495-574_G.pdf PDF
1629197dwgVol1_Sheet001-014_G.pdf PDF
1629197spcVol3_Div 25.pdf PDF
1629197dwgVol1_Sheet047-050_B.pdf PDF
1629197spcVol2_Divs 07-23.pdf PDF
1629197dwgVol2_Sheet237-255_E.pdf PDF
Amendment 0007.pdf PDF
1629197dwgVol5_Sheet627-688_D.pdf PDF
Show 40 more

Latest 50 of 115 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TREELINE

TREELINE

TREELINE

HWY 486 - GRAVEL

H

W

Y

G

R

A

V

E

L

H W

Y

G

R A

V E

L

X

CB

CB

C

B

C

B

CB CB

T

T

CB

D

S

S

O

H

W

O

H

W

O H

W

O

H

W

O

H

W

D

D

D

CB

CB

CB

CB

CB

CB

CB

D

D

D

CB

O H

W

O H

W

S

S

S

S S

E

E

E

E

E

S

W

W

W

W

W

W

W

W

W

W

W

W

W

W

CB

S

E

E

ES

T

E

O

H

W

O

H

W

P

R R RR

W

P

S

CO

CO

CO

CO

CO

D

CB CB CB

CBCB

CBCB

D

CB

CBCB

D

D

W

T

W

J

P

C

E

C

E

C C

C

E

C

C

C

C

C

D

D

D

D

C

D

E

D

D

S

E

E

E E E

E E

S

W

E

D

D

W

D

E

C

C

C

C

W

W

W

YH

YH

YH

P

P

L

C

C

C

C

CRANE PAD

MECHANICAL AND

ELECTRICAL BUILDING

WATER TREATMENT

WAREHOUSE

STAGING

AREA

WASTE STAGING

AREA

WEATHER TOWER

LOCATION

STORMWATER MANAGEMENT AREA - B

STORMWATER MANAGEMENT AREA - A

ELECTRIC

SUBSTATION

FIRE PUMP

ENCLOSURE

CROSS FLOW PIT

LAUNCH

PIT

TEST

EQUIPMENT

PAD

VFD AREA

3 RELOCATED HIGHWAY 486

+ HIGHWAY 486 (A)

TEST EQUIPMENT

STAGING AREA

OPERATIONS

4F

4E

4B

4C

4A

SUPPORT

BUILDING

BUILDING

4D

N

P H

A S

I N

G

P

L A

N

UTF-C-103

12810566

1"=60'

KM DP JK

F I L E

N

A M

E

C p w w o r k i n g g b n a d a x e s h p d B

L D

G U

T F

C d w g

Y O

U T

M

E

U

T F

C

P

O

T T

E D

T u e s d a y

A p r i l p m

U

S E

R p a t e l d

D E

P A

R T

M E

O

F

T

H

V

Y

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

DES DRW CHK

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

P-

UN

DE

RW

AT

ER

L

AU

NC

H

TE

ST

F

AC

IL

IT

Y N

C

R A

N E

C R

A N

E

I N

D I A

N A

N40085-19-R-9186

1629197

JACOBS ENGINEERING GROUP INC.

412 MT. KEMBLE AVENUE

MORRISTOWN, NJ 07960

PHONE: (973) 267-0555

R F

P

P

H A

U B

M I S

S I O

N

RDS/PJB

EJA

C I V

I

I T

E

M I D

L A

C

I

C

O R

E N

A V

A L

S

T A

T I O

N

N

O R

F O

L K

V

A

2/24/2020

APPROVED BY SHANE A. FRINK

CTF TEST SYSTEM INTEGRATOR

NSWC CRANE VIA EMAIL

DLB

N

60' 120'0

DATES

1. AWARD TO SEPTEMBER 15, 2020

2. SEPTEMBER 16, 2020 TO 10 MONTHS

AFTER DATE OF AWARD

3. 10 MONTHS AFTER DATE OF AWARD

4. 15 MONTHS AFTER DATE OF AWARD

5. 19 MONTHS AFTER DATE OF AWARD

6. 21 MONTHS, 15 DAYS AFTER DATE OF

AWARD

PLAN

CONTRACTOR MUST SHARE ACCESS WITH DUKE

ENERGY FROM HIGHWAY 331 TO HIGHWAY 486 (A).

ROUTE MAY BE MODIFIED BUT MUST BE EQUAL TO

OR BETTER THAN ROUTE SHOWN.

CONTRACTOR MAINTAINS FULL CONTROL OF

PROJECT SITE.

THE FOLLOWING MUST BE 100% COMPLETE

· RELOCATED HIGHWAY 486

· TEST EQUIPMENT STAGING AREA

· INSTALLATION OF FOUNDATIONS, CONCRETE

PADS, TRENCHING, CONDUIT AND OTHER SITE

IMPROVEMENTS WITHIN TEST EQUIPMENT

STAGING AREA.

CONTRACTOR MUST SHARE ACCESS FROM HIGHWAY

331, ALONG EXISTING AND RELOCATED HIGHWAY 486

TO THE TEST EQUIPMENT STAGING AREA. THE TEST

EQUIPMENT STAGING AREA WILL NOT BE

ACCESSIBLE TO THE CONTRACTOR FROM THIS TIME

FORWARD. THE TEST EQUIPMENT DESIGN AND

FABRICATION TEAM WILL UTILIZE THIS AREA FOR

EQUIPMENT STORAGE AND FABRICATION.

THE LAUNCH PIT SHALL BE SUBSTANTIALLY

COMPLETE ON/PRIOR TO 15 MONTHS AFTER THE

DATE OF AWARD. THE TEST EQUIPMENT

DESIGN/FABRICATION TEAM SHALL BE PERMITTED

COORDINATED AND NON-IMPACTFUL ACCESS AS

IDENTIFIED BELOW:

A.) CRANE ACCESS TO ALL SIDES OF THE LAUNCH

PIT AND CROSS FLOW AREA, 15 MONTHS

AFTER AWARD THROUGH BOD.

B.) ACCESS TO THE WEST WALL OF THE LAUNCH

PIT AND SHEAVE AREA FOR TEST EQUIPMENT

INSTALLATION, 15 MONTHS AFTER AWARD

THROUGH BOD.

C.) ACCESS TO THE LAUNCH PIT FLOOR FOR

TEST EQUIPMENT INSTALLATION, 16 MONTHS

AFTER AWARD THROUGH BOD.

D.) ACCESS TO THE CROSS FLOW WINCH AREA

FOR TEST EQUIPMENT INSTALLATION, 17

MONTHS AFTER AWARD THROUGH BOD.

E.) ACCESS TO THE VFD AREA FOR TEST

EQUIPMENT INSTALLATION, 18 MONTHS AFTER

AWARD THROUGH BOD.

F.) ACCESS FROM THE TEST EQUIPMENT PAD TO

THE LAUNCH PIT FOR MOVING AN ENCLOSURE

INTO PLACE OVER THE LAUNCH PIT ON THE

EMBEDDED PLATES, 19 MONTHS AFTER

AWARD THROUGH BOD.

THE OPERATIONS SUPPORT BUILDING SHALL BE

SUBSTANTIALLY COMPLETE ON/PRIOR TO 19 MONTHS

AFTER THE DATE OF AWARD. THE TEST EQUIPMENT

DESIGN/FABRICATION TEAM SHALL BE PERMITTED

COORDINATED AND NON-IMPACTFUL ACCESS TO THE

LOW BAY LAUNCH CONTROL CENTER AND LAUNCH

CONTROL CENTER EQUIPMENT ROOM THROUGH THE

DOUBLE DOORS ON THE NORTH SIDE OF THE LAUNCH

CONTROL CENTER. COMPLETED IMPROVEMENTS IN

THESE AREAS SHALL INCLUDE BUT NOT BE LIMITED

TO ELECTRICAL POWER, INTERIOR FINISHES AND

HEATING AND AIR CONDITIONING SYSTEMS.

THE ENTIRE FACILITY MUST BE SUBSTANTIALLY

COMPLETE AND FULLY ACCESSIBLY TO THE TEST

EQUIPMENT DESIGN AND FABRICATION TEAM.

PHASING PLAN

3,700' TO

HIGHWAY 331

A1

PHASING PLAN

SCALE: 1"=60'

File details come from the government source that posted it. Updated .