UTF-C-103 Phasing Plan.pdf
PDF 3 MB Posted
- Solicitation number
- N4008519R9186
About this file
This document outlines the phasing plan and requirements for the Design-Bid-Build of the P409 Underwater Launch Test Facility in Crane, Indiana. The project constructs a new Underwater Launch Test Facility including an Underwater Launch Pit, Operational Support Building, Warehouse Building, Water Treatment Facility, and Mechanical and Electrical Building. Supporting facilities include site preparations, utilities, and environmental mitigation. Phase 1 requires the construction storage pad within seven months of award. Phase 2 provides shared access to the launch pit within twelve months and the OSB low bay within sixteen months. Phase 3 completes the project within eighteen months of award. The Department of the Navy Naval Facilities Engineering Command issued solicitation N4008519R9186 for the project, which will support submerged launch testing and evaluation starting in June 2020 through equipment outfitting in September 2021.
View the file
Other files
Show 40 more
Latest 50 of 115 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TREELINE
TREELINE
TREELINE
HWY 486 - GRAVEL
H
W
Y
G
R
A
V
E
L
H W
Y
G
R A
V E
L
X
CB
CB
C
B
C
B
CB CB
T
T
CB
D
S
S
O
H
W
O
H
W
O H
W
O
H
W
O
H
W
D
D
D
CB
CB
CB
CB
CB
CB
CB
D
D
D
CB
O H
W
O H
W
S
S
S
S S
E
E
E
E
E
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
CB
S
E
E
ES
T
E
O
H
W
O
H
W
P
R R RR
W
P
S
CO
CO
CO
CO
CO
D
CB CB CB
CBCB
CBCB
D
CB
CBCB
D
D
W
T
W
J
P
C
E
C
E
C C
C
E
C
C
C
C
C
D
D
D
D
C
D
E
D
D
S
E
E
E E E
E E
S
W
E
D
D
W
D
E
C
C
C
C
W
W
W
YH
YH
YH
P
P
L
C
C
C
C
CRANE PAD
MECHANICAL AND
ELECTRICAL BUILDING
WATER TREATMENT
WAREHOUSE
STAGING
AREA
WASTE STAGING
AREA
WEATHER TOWER
LOCATION
STORMWATER MANAGEMENT AREA - B
STORMWATER MANAGEMENT AREA - A
ELECTRIC
SUBSTATION
FIRE PUMP
ENCLOSURE
CROSS FLOW PIT
LAUNCH
PIT
TEST
EQUIPMENT
PAD
VFD AREA
3 RELOCATED HIGHWAY 486
+ HIGHWAY 486 (A)
TEST EQUIPMENT
STAGING AREA
OPERATIONS
4F
4E
4B
4C
4A
SUPPORT
BUILDING
BUILDING
4D
N
P H
A S
I N
G
P
L A
N
UTF-C-103
12810566
1"=60'
KM DP JK
F I L E
N
A M
E
C p w w o r k i n g g b n a d a x e s h p d B
L D
G U
T F
C d w g
Y O
U T
M
E
U
T F
C
P
O
T T
E D
T u e s d a y
A p r i l p m
U
S E
R p a t e l d
D E
P A
R T
M E
O
F
T
H
V
Y
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
P-
UN
DE
RW
AT
ER
L
AU
NC
H
TE
ST
F
AC
IL
IT
Y N
C
R A
N E
C R
A N
E
I N
D I A
N A
N40085-19-R-9186
1629197
JACOBS ENGINEERING GROUP INC.
412 MT. KEMBLE AVENUE
MORRISTOWN, NJ 07960
PHONE: (973) 267-0555
R F
P
P
H A
U B
M I S
S I O
N
RDS/PJB
EJA
C I V
I
I T
E
M I D
L A
C
I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
A
2/24/2020
APPROVED BY SHANE A. FRINK
CTF TEST SYSTEM INTEGRATOR
NSWC CRANE VIA EMAIL
DLB
N
60' 120'0
DATES
1. AWARD TO SEPTEMBER 15, 2020
2. SEPTEMBER 16, 2020 TO 10 MONTHS
AFTER DATE OF AWARD
3. 10 MONTHS AFTER DATE OF AWARD
4. 15 MONTHS AFTER DATE OF AWARD
5. 19 MONTHS AFTER DATE OF AWARD
6. 21 MONTHS, 15 DAYS AFTER DATE OF
AWARD
PLAN
CONTRACTOR MUST SHARE ACCESS WITH DUKE
ENERGY FROM HIGHWAY 331 TO HIGHWAY 486 (A).
ROUTE MAY BE MODIFIED BUT MUST BE EQUAL TO
OR BETTER THAN ROUTE SHOWN.
CONTRACTOR MAINTAINS FULL CONTROL OF
PROJECT SITE.
THE FOLLOWING MUST BE 100% COMPLETE
· RELOCATED HIGHWAY 486
· TEST EQUIPMENT STAGING AREA
· INSTALLATION OF FOUNDATIONS, CONCRETE
PADS, TRENCHING, CONDUIT AND OTHER SITE
IMPROVEMENTS WITHIN TEST EQUIPMENT
STAGING AREA.
CONTRACTOR MUST SHARE ACCESS FROM HIGHWAY
331, ALONG EXISTING AND RELOCATED HIGHWAY 486
TO THE TEST EQUIPMENT STAGING AREA. THE TEST
EQUIPMENT STAGING AREA WILL NOT BE
ACCESSIBLE TO THE CONTRACTOR FROM THIS TIME
FORWARD. THE TEST EQUIPMENT DESIGN AND
FABRICATION TEAM WILL UTILIZE THIS AREA FOR
EQUIPMENT STORAGE AND FABRICATION.
THE LAUNCH PIT SHALL BE SUBSTANTIALLY
COMPLETE ON/PRIOR TO 15 MONTHS AFTER THE
DATE OF AWARD. THE TEST EQUIPMENT
DESIGN/FABRICATION TEAM SHALL BE PERMITTED
COORDINATED AND NON-IMPACTFUL ACCESS AS
IDENTIFIED BELOW:
A.) CRANE ACCESS TO ALL SIDES OF THE LAUNCH
PIT AND CROSS FLOW AREA, 15 MONTHS
AFTER AWARD THROUGH BOD.
B.) ACCESS TO THE WEST WALL OF THE LAUNCH
PIT AND SHEAVE AREA FOR TEST EQUIPMENT
INSTALLATION, 15 MONTHS AFTER AWARD
THROUGH BOD.
C.) ACCESS TO THE LAUNCH PIT FLOOR FOR
TEST EQUIPMENT INSTALLATION, 16 MONTHS
AFTER AWARD THROUGH BOD.
D.) ACCESS TO THE CROSS FLOW WINCH AREA
FOR TEST EQUIPMENT INSTALLATION, 17
MONTHS AFTER AWARD THROUGH BOD.
E.) ACCESS TO THE VFD AREA FOR TEST
EQUIPMENT INSTALLATION, 18 MONTHS AFTER
AWARD THROUGH BOD.
F.) ACCESS FROM THE TEST EQUIPMENT PAD TO
THE LAUNCH PIT FOR MOVING AN ENCLOSURE
INTO PLACE OVER THE LAUNCH PIT ON THE
EMBEDDED PLATES, 19 MONTHS AFTER
AWARD THROUGH BOD.
THE OPERATIONS SUPPORT BUILDING SHALL BE
SUBSTANTIALLY COMPLETE ON/PRIOR TO 19 MONTHS
AFTER THE DATE OF AWARD. THE TEST EQUIPMENT
DESIGN/FABRICATION TEAM SHALL BE PERMITTED
COORDINATED AND NON-IMPACTFUL ACCESS TO THE
LOW BAY LAUNCH CONTROL CENTER AND LAUNCH
CONTROL CENTER EQUIPMENT ROOM THROUGH THE
DOUBLE DOORS ON THE NORTH SIDE OF THE LAUNCH
CONTROL CENTER. COMPLETED IMPROVEMENTS IN
THESE AREAS SHALL INCLUDE BUT NOT BE LIMITED
TO ELECTRICAL POWER, INTERIOR FINISHES AND
HEATING AND AIR CONDITIONING SYSTEMS.
THE ENTIRE FACILITY MUST BE SUBSTANTIALLY
COMPLETE AND FULLY ACCESSIBLY TO THE TEST
EQUIPMENT DESIGN AND FABRICATION TEAM.
PHASING PLAN
3,700' TO
HIGHWAY 331
A1
PHASING PLAN
SCALE: 1"=60'
File details come from the government source that posted it. Updated .