PPI 109 UTF Drawing.pdf
PDF 1 MB Posted
- Solicitation number
- N4008519R9186
About this file
This solicitation is for the design and construction of an Underwater Launch Test Facility at Crane, Indiana to support submerged launch testing and evaluation of full-scale launch technologies. Key requirements include the construction of an Underwater Launch Pit with slurry wall and soil anchors, an Operational Support Building with high and low bays, a Warehouse Building, a Water Treatment Facility, and a Mechanical and Electrical Building to house support equipment. Supporting facilities such as site preparations, utilities, and environmental mitigation are also required. Construction is to start in June 2020 with equipment outfitting completed by September 2021. The project will be conducted in four phases, with initial storage pad construction within seven months of award and beneficial occupancy within eighteen months. The Naval Facilities Engineering Command is the issuing agency.
View the file
Other files
Show 40 more
Latest 50 of 115 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTILITY
POLE
(UP-S1)
OHW
EXISITNG
CHH1
EXISTNG POLE 2B-8-3
OHW
O H
W
BBFPPI
RACK 102
BUILDING 2
BASEMENT
TER 005
EXISTNG POLE 2B-8-2
EXISITNG
CMH1
3 3
2 2
6 5 5
O H
W
FDC-1
UTF SITE AND OPERATIONS
SUPPORT BUILDING
FIRST FLOOR
COMM ROOM 113
EXISTNG POLE
2B-8-1
FOR CONTINUATION SEE FIBER OPTIC CABLE
EXTENSION PLAN SHEETS UTF-ES-108 THRU UTF-ES-118
AND SHEETS UTF-ES-119 THRU UTF-ES-122 FOR DETAILS
(TYPICAL)
FOR CONTINUATION SEE FIBER OPTIC CABLE
EXTENSION PLAN SHEETS UTF-ES114 THRU UTF-ES121
AND SHEETS UTF-ES-119 THRU UTF-ES-122 FOR DETAILS
(TYPICAL)
33CMH-01 3CHH-02 CHH-01
816-3313
DUKE
ENERGY
UTILITY POLE
OHW
OHW
OHW
OHW
OHW
816-3312
DUKE ENERGY
UTILITY POLE
816-3311
DUKE ENERGY
UTILITY POLE
816-3310
DUKE ENERGY
UTILITY POLE
816-3309
DUKE ENERGY
UTILITY POLE
816-3308
DUKE ENERGY
UTILITY POLE
816-3307
DUKE ENERGY
UTILITY POLE
816-3306
DUKE ENERGY
UTILITY POLE
816-3305
DUKE ENERGY
UTILITY POLE
816-3304
DUKE ENERGY
UTILITY POLE
816-3303
DUKE ENERGY
UTILITY POLE
816-3302
DUKE ENERGY
UTILITY POLE
816-3301
DUKE ENERGY
UTILITY POLE
O H
W O
H W
O H
W O
H W
O H
W O
H W
EXISTING POLE
3-71
EXISTING POLE
3-72
14CHH-DE
BBFPP1
DUKE ENERGY
SUBSTATION NEAR HIGHWAY 5
SWITCHGEAR ROOM
O H
W
O H
W
EXISTING POLE
3-70 1/2
(1-12) FOC1.1
(13-24) FOC1.1
F O
C
S P
CABINET 5
EXISTING POLE
3-74
EXISTING POLE
3-73
816-3240
DUKE ENERGY
UTILITY POLE
O H
W
OHW OHW
CU
C
U
C
U
F I L
E
N
A M
E
C p w w o r k i n g g b n a j e g m d e l d u c a d
U
T F
E
S d w g
L
A Y
O U
T
N
A M
E
C
T F
E
S
P
L O
T T
E D
T u e s d a y
F e b r u a r y p m
U
S E
R m d e l d u c a
E X
T E
N S
I O
N
S
I N
G L
E
L
I N
E
D
I A
G R
A M
UTF-ES610
12810810
AS NOTED
JH JH JH
D E
P A
R T
M E
N T
O
F
T
H E
V
Y
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
DES DRW CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
P-
UN
DE
RW
AT
ER
L
AU
NC
H
TE
ST
F
AC
IL
IT
Y N
S
C
R A
N E
C R
A N
E
I N
D I A
N A
N40085-19-R-9186
1629197
JACOBS ENGINEERING GROUP INC.
412 MT. KEMBLE AVENUE
MORRISTOWN, NJ 07960
PHONE: (973) 267-0555
F I N
A L
RDS/PJB
EJA
S I T
E
E
L E
C T
R I C
A L
M I D
L A
T
C
I
C
O R
E N
A V
A L
S
T A
T I O
N
N
O R
F O
L K
V
A
A1
UTF - ADSS FIBER OPTIC ONE-LINE DIAGRAM
SCALE: NTS
SHEET KEYNOTES
1. PROVIDE 4RU, FIBER CABINET, (8) 12-FIBER SPLICE TRAYS, (8)12 FIBERS, (6 PORT
DUPLEX) LC ADAPTER PANELS, SMF, BLUE ADAPTERS CERAMIC ALIGNMENT
SLEEVES, LOOSE TUBE BREAKOUT KIT, (2) 50 HEAT SHRINK TUBES, (8)12 FIBER
PIGTAILS, 2M, LC-IPC, OS2. THE FIBER OPTIC CABLE SHALL BE FUSION SPLICED
TO FACTORY-PRODUCED PIGTAILS IN THE FIBER CABINET.
2. PROVIDE 96-STRAND, ADSS SINGLEMODE, OS2, FIBER OPTIC CABLE FROM
BUILDING 2/B005/RK 102/PP1 TO ULTF SITE AND OPERATIONS SUPPORT
BUILDING/COMM ROOM 113 / FDC-1 VIA AERIALLY AND UNDERGROUND
COMMUNICATIONS DUCTBANK.
3. COIL UP 50 FEET OF SLACK INSIDE CMH/CHH.
4. PROVIDE (1) 4-INCH SCHEDULE 40 PVC CONDUIT WITH THREE 1 1/4"-INCH,
ORANGE, SDR 13.5, SMOOTHG OUTER WALL / RIBBED INNER WALL, INNERDUCT
WITH PULL TAPE RATED FOR 2500 LBS WITH FOOTAGE MARKS AND #6 XHHW SIRE
FOR TRACING, FROM EXISTING CHH1 TO UTILITY POLE 2B-8-3.
5. EXISTING COMMUNICATION DUCTBANK SYSTEM.
6. PROVIDE THREE (3-CELL) MESH TYPE INNERDUCT IN AN EXISTING 4-INCH
CONDUIT FROM EXISTING CMH1 AND TO BUILDING 2 ENTRANCE FACILITY IN
BASEMENT TER 005.
7. PROVIDE CONCRETE ENCASED COMMUNICATION DUCT BANK SYSTEM.
8. PROVIDE (2) 4-INCH SCHEDULE 40 PVC CONDUITS. ONE CONDUIT WITH THREE
1 1/4"-INCH, ORANGE, SDR 13.5, SMOOTH OUTER WALL / RIBBED INNER WALL,
INNERDUCT WITH PULL TAPE RATED FOR 25000 LBS WITH FOOTAGE MARKS AND
(1) SPARE 4-INCH SCHEDULE 40 PVC CONDUIT WITH PULL TAPE WITH FOOTAGE
MARKS AND #6 AWG XHHW WIRE FOR TRACING.
9. SPARE 4-INCH SCHEDULE 40 PVC CONDUIT WITH THREE (3-CELL) MESH TYPE
INNERDUCT WITH PULL TAPE AND (1) #6 XHHW WIRE FOR TRACING.
10. PROVIDE (1) 4-INCH SCHEDULE 40 PVC CONDUIT WITH THREE 1 1/4"-INCH,
ORANGE SDR 13.5, SMOOTH OUTER WALL / RIBBED INNER WALL, INNERDUCT
WITH PULL TAPE RATED FOR 2500 LBS AND FOOTAGE MARKS AND #6 AWG XHHW
WIRE FOR TRACING, FROM EXISTING UTILITY POLE 3-74 TO COMMUNICATIONS
HANDHOLE (4-FOOT LONG BY 4-FOOT WIDE BY 4-FOOT DEEP HANDHOLE
PROVIDED BY DUKE ENERGY).
11. (1) 3-INCH SCHEDULE 40 PVC CONDUIT WITH PULL TAPE (PROVIDED BY DUKE
ENERGY).
12. PROVIDE 24-STRAND, ADSS SINGLEMODE, OS2 FIBER OPTIC CABLE FROM AERIAL
SPLICE POINT ON EXISTING UTILITY POLE 3-72, TO UTILITY POLE 3-73, TO UTILITY
POLE 3-74, INTO A 3-INCH CONDUIT TO CHH-DE TO DUKE ENERGY SUBSTATION
NEAR HIGHWAY 5 TO CABINET 5, BBFPP1. FOC #1.1 WILL BE SPLICED AS
FOLLOWS:
13. PROVIDE 2U, FIBER CABINET, (2) 12-FIBER SPLICE TRAYS, (2)12 FIBERS, (6 PORT
DUPLEX) LC ADAPTER PANELS, SMF, BLUE ADAPTERS CERAMIC ALIGNMENT
SLEEVES, LOOSE TUBE BREAKOUT KIT, (1) 50 HEAT SHRINK TUBES, (2)12 FIBER
PIGTAILS, 2M, LC-IPC, OS2. THE FIBER OPTIC CABLE SHALL BE FUSION SPLICED
TO FACTORY-PRODUCED PIGTAILS IN THE FIBER CABINET.
GENERAL SHEET NOTES
1. REFER TO DRAWING UTF-T-001 FOR DRAWING REFERENCES GUIDES, LEGENDS,
SYMBOLS AND ABBREVIATIONS.
1. STRANDS 1-12 (BLUE BUFFER TUBE) WILL BE SPLICED TO THE BLUE BUFFER TUBE
OF THE 96-STRAND, ADSS SMF OPTIC CABLE (OS2) CONTINUING TO BUILDING 2.
2. STRANDS 13-24 (ORANGE BUFFER TUBE) WILL BE SPLICED TO THE BLUE BUFFER
TUBE OF THE 96-STRAND, ADSS SMF OPTIC CABLE (OS2) CONTINUING TO ULTF
SITE, OPERATIONS BUILDING.
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
mdelduca Hansberry Seal.jpg
HeitzJ Telecomm
14. A 4-Foot Long by 4-Foot Wide by 4-Foot Deep Communications Handhole CHH-DE, provided by Duke Energy.
HeitzJ Telecomm
HeitzJ Telecomm
HeitzJ Telecomm
HeitzJ Telecomm
CHH-DE.
kmanger Text Box PPI 109 Edits
File details come from the government source that posted it. Updated .