Amendment 0015.pdf
PDF 85 KB Posted
- Solicitation number
- N4008519R9186
About this file
This document includes an amendment to a solicitation and details of the related federal contract opportunity. The amendment modifies the phased construction plan for a project to construct a new Underwater Launch Test Facility to support submerged launch testing and evaluation. Key details include that construction is to start in June 2020 and equipment outfitting is to be completed by September 2021. The facility will include an underwater launch pit, operational support building, warehouse building, water treatment facility, and mechanical and electrical building. Supporting site work will also be conducted. The project has specific phasing requirements, with Phase 1 work to be completed within seven months of award and Phase 4, achieving beneficial occupancy, to be finished within eighteen months of the construction contract award date. The opportunity is solicited by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 115 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DBB P409 ULTF, Crane, IN
SEE BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Oct-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9186
X 9B. DATED (SEE ITEM 11)
11-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Oct-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9186
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
The purpose of this modification is for the following:
1. Provide revised Phase Construction Plan
1. Revised Phased Construction Plan: Changes are in bold italic
Phased Construction Schedule
Within the overall project schedule, commence and complete the work in phases. Complete each phase of the work within the number of calendar days stated in the following schedule:
a. Schedule start day: The day designated as the beginning of a particular phase; the number listed is the number of calendar days from the award of contract.
b. Completion day: The day designated as the end of a given phase and the day the work in that phase must be completed; the number listed is the number of calendar days from the award of the contract.
c. Schedule:
NOTE: Determine the number of days required for each phase.
Phase Description Scheduled Start Date Completion Date Phase Plan Note 3 The following must be 100% complete 10/30/20 08/30/21 ꞏ relocated highway 486 ꞏ test equipment staging area ꞏ installation of foundations, concrete pads, trenching, conduit and other site improvements within test equipment staging area. 10 months after date of award.
Phase Plan Note 4a The launch pit shall be substantially 10/30/20 01/31/22 and 4b complete on/prior to 15 months after the date of award. the test equipment design/fabrication team shall be permitted coordinated and non-impactful access as identified below:
a.) crane access to all sides of the launch pit and cross flow area, 15 months after award through BOD.
b.) access to the west wall of the launch pit and sheave area for test equipment installation, 15 months after award through BOD.
N4008519R9186
Phase Plan Note 4c c.) access to the launch pit floor for test 10/30/20 02/28/22 equipment installation, 16 months after award through BOD.
Phase Plan Note 4d d.) access to the cross flow winch area 10/30/20 03/30/22 for test equipment installation, 17 months after award through BOD.
Phase Plan Note 4e e.) access to the VFD area for test 10/30/20 05/02/22 equipment installation, 18 months after award through BOD.
Phase Plan Note 4f f.) access from the test equipment pad to 10/30/20 05/30/22 the launch pit for moving an enclosure into place over the launch pit on the embedded plates, 19 months after award through BOD.
Phase Plan Note 5 The operations support building shall be 10/30/20 05/30/22 substantially complete on/prior to 19 months after the date of award. the test equipment design/fabrication team shall be permitted coordinated and non-impactful access to the low bay launch control center and launch control center equipment room through the double doors on the north side of the launch control center. completed improvements in these areas shall include but not be limited to electrical power, interior finishes and heating and air conditioning systems.
Phase Plan Note 6 The entire facility must be substantially 10/30/20 08/15/22 complete and fully accessibly to the test equipment design and fabrication team. 21 months, 15 days after date of award.
d. If the work of a particular phase is complete and accepted before the scheduled completion day, immediately begin work on the subsequent phase unless otherwise restricted.
(End of NAVFAC language)
The following have been deleted:
BLOCK 14 CONTINUATION PAGE
(End of Summary of Changes)