Section J 0200000-01 thru 06.pdf
PDF 130 KB Posted
- Attached to
- Regional Hazardous Waste Services
- Solicitation number
- N4008024R2225
About this file
This document is a collection of attachments related to a federal contract opportunity for Regional Hazardous Waste Services. The attachments include definitions, wage determinations, directives and references, required forms, and details on government-furnished property, materials, and services.
The key details are: The contract is for recurring and non-recurring, performance-based hazardous waste management services at various Navy sites in the Washington, DC metropolitan area. The solicitation number is N4008024R2225 and proposals are due by July 8, 2024. The contract will be awarded by the Department of the Navy, Naval Facilities Engineering Command. The contract will use a variety of wage determinations and require compliance with numerous directives and references. The government will provide certain facilities and materials to support the work. No government-furnished equipment is included.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J 0200000-01 thru 06
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-0200000-01 DEFINITIONS AND ACRONYMS
J-0200000-02 WAGE DETERMINATIONS
J-0200000-03 DIRECTIVES, INSTRUCTIONS, AND REFERENCES
J-0200000-04 FORMS
J-0200000-05 GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
J-0200000-06 EXHIBIT LINE ITEM NUMBERS
ATTACHMENT J-0200000-01
DEFINITIONS AND ACRONYMS
Definition Description
Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Business Management
System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Component Inventory
Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space
(such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer
(KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s
Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor
Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the
Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation
And Maintenance And
Support Information
(eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and nonexpendable.
Facility A building or structure designed and created to serve a particular function.
Fixed Burden Rate
(FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offerors Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or
Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Government Furnished
Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Infrastructure Condition
Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Load Handling
Equipment
A term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used WITH RIGGING to raise, lower and/or horizontally move a load.
Maintenance And
Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC
MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Performance
Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance
Assessment
Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert
(SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin
Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management
Program
A Government program established for the purpose of reviewing and approving the
Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance
(QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as
"Means".
Real Property Inventory
Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.
An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Unit Priced Labor
(UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the
Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity;
costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
ATTACHMENT J-0200000-01
DEFINITIONS AND ACRONYMS
Acronym Title
ACO Administrative Contracting Officer
BW Biweekly
CDR Contract Discrepancy Report
CIA Controlled Industrial Area
CIMU Component Inventory Management Unit
CMMS Computerized Maintenance Management System
COR Contracting Officer Representative
COR Condition of Readiness
DBH Diameter at Breast Height
DCR Direct Condition Rating
DLA-DS Defense Logistics Agency – Disposition Services
DoD Department of Defense
DoN Department of Navy
DRMO Defense Reutilization Management Office
EPA Environmental Protection Agency
EPCRA Emergency Planning and Community Right-to-Know Act
FAR Federal Acquisition Regulation
FFP Firm Fixed Price
FIFRA Federal Insecticide, Fungicide, and Rodenticide Act
FSC Facility Support Contract
FSCM Facility Support Contract Manager
GIS Geospatial Information System
GFE Government-furnished Equipment
GFF Government-furnished Facilities
GFM Government-furnished Materials
HCA Head Contracting Agency
ICAP Infrastructure Condition Assessment Program
ICP Integrated Contingency Plan
IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store
IPM Integrated Pest Management
IPMIS Integrated Pest Management Information System
IPMP Integrated Pest Management Plan
KO Contracting Officer
LAN Local Area Network
M Monthly
MAP Maintenance Action Plan
MDI Mission Dependency Index
MEP Mechanical, Electrical and Plumbing
MPAS Monthly Performance Assessment Summary
MRI Mission Readiness Index
MSDS Material Safety Data Sheets
NAVFAC Naval Facilities Engineering Command
NMCI Navy Marine Corps Intranet
NOSC Navy-On-Scene Coordinator
PAP Performance Assessment Plan
PAR Performance Assessment Representative
PAW Performance Assessment Worksheet
PEO Program Executive Officer
PM Project Manager
PM Planned Maintenance or Preventative Maintenance
POL Petroleum, Oil and Lubricant
PRCSP Permit Required Confined Space Program
PWS Performance Work Statement
PWO Public Works Officer
Q Quarterly
QC Quality Control
RPIE Real Property Inventory Equipment
RSL Remaining Service Life
SC Security Clearances
SM Semimonthly
SPAR Senior Performance Assessment Representative
TE Technical Exhibit
VIQ Variation in Quantity
WBS Work Breakdown Structure
See attached PDF’s for the Wage Determinations listed below:
WD 2015-4265
WD2015-4269
WD2015-4279
WD2015-4281
WD2015-4329
WD 1996-0223
ATTACHMENT J-0200000-03
DIRECTIVES, INSTRUCTIONS AND REFERENCES
Reference Title
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
P.L. 91-596 Occupational Safety and Health Act
UFGS 01 35 26 Unified Facilities Guide Specifications
OPNAVINST 5090.1 Navy Environmental & Natural Resources Program
NAVSEA T0300-AZ-PRO-010 Navy Environmental Compliance Sampling and Field Testing Procedures Manual
NASPAXRIVINST 5090.5A Regulated Waste Management Plan Implementation Order
ATTACHMENT J-0200000-02
WAGE DETERMINATIONS
NASPAXRIVINST 5090.2A NASPRC Facility Response Plan & Spill Prevention, Control, and Countermeasure
Plan
BUMEDINST 6280.1 Management of Infectious Waste
DOD Publication 4715.5-G Overseas Environmental Baseline Guidance Document
EPA 833-B-92-001 NPDES Storm Water Sampling Guidance 29 CFR 1910 Occupational Safety and Health Standards
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
NDW CHRIMP Naval District Washington Consolidated Hazardous Material Reutilization & Inventory
Management Program
ATTACHMENT J-0200000-04
FORMS
SECNAV 5512/1 Background Check and Access Form See Attached PDF
DD 1172-2 Application for Identification Card/DEERS Enrollment See Attached PDF
DD 254 Department of Defense Contract Security Classification Specification See Attached PDF
TASS Registration Request (TRR) See Attached PDF
OPNAV 5239/14 - System Authorization Access Request Navy (SAAR-N) See Attached PDF
Uniform Hazardous Waste Manifest Template See Attached PDF
Past Performance Questionnaire See Attached PDF
Form I-9 – Employment Eligibility Verification See Attached PDF
ATTACHMENT J-0200000-05
GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
Government Furnished Facilities (GFF)
SITE LOCATION
Washington Navy Yard (WNY) Bldg. 21 - Storage locker east of bldg.
Pentagon RDF 1K698E - Remote Delivery Facility NSA Bethesda
Walter Reed National Military Medical Center
(WRNMMC)
Bldg. 256 Bldg. 55
Carderock Bldgs. 1, 147 and 148 - Storage lockers United States Naval Observatory (USNO) Waste storage locker east of Bldg. 76
USMC Barracks 8th & I East Barracks, basement level NMIC “Expansion Area” Ground floor of Wing E Arlington Service Center (ASC) Storage locker behind Bldg. 22 NAS PAX River Bldg. 504
Bldg. 619
Bldg. 653 (Can Kruncher)
Trailer 3155
NRC Solomon’s Island Bldg. 454 – HAZMAT Building
Webster Field Bldg. 8149 - Storage locker NSF Dahlgren Bldg. 1425 NSF Indian Head Stump Neck Annex Bldgs. 455 Bldg. 2156
Olney Federal Support Center Former NIKE backup generator building now used for storage.
Located to the south of the bunker and SW of the truck entrance.
Annapolis Waste storage containers located in the Perry Center. Waste storage area adjacent to HAZMAT warehouse at North Severn
**There will be no Government Furnished Equipment under this contract. **
See Attached Excel Spreadsheet
ATTACHMENT J-0200000-06
EXHIBIT LINE ITEM NUMBERS
ATTACHMENT J-0200000-05
GOVERNMENT-FURNISHED EQUIPMENT (GFE)