Propane Tank Information as shown on V-101.pdf

PDF 3 MB Posted

Attached to
N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) Federal contract opportunity
Solicitation number
N4008023R0020
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a propane tank information sheet and details of a related federal contract opportunity for construction services. The propane tank information sheet provides specifications for an above-ground, 10,000 gallon steel propane tank located on a military base. It notes there are no known soil contaminants, and that the government will empty the tank prior to work commencing. The contractor will not be responsible for filling the tank afterwards or repairs not caused by their work. The solicitation seeks multiple-award construction contracts from the Naval Facilities Engineering Command for large projects across its facilities. Offerors should refer to SAM.gov for full solicitation documents, attachments, and amendments under solicitation number N40080-23-R-0020.

View the file

Other files for this federal contract opportunity

Other files attached to N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
N4008023R0020 Amendment 0010.pdf PDF
GI-113_Amend 6.pdf PDF
CS-503_Amend 6 (2).pdf PDF
CU-202_Amend 6 (2).pdf PDF
CU-204_Amend 6 (2).pdf PDF
Additional Site Photos (2).pdf PDF
01 50 00_Amend 6 (2).pdf PDF
GC-005_Amend 6.pdf PDF
21-SF-0064_Mod 2 stamped plans_P-3002_ESC_Stage_0 Amend 5.pdf PDF
CG-122_Amend 5.pdf PDF
Flashing Beacon Specification and Details Amend 5.pdf PDF
Site Visit Seed Project Photos (P-3002 HCL).pdf PDF
01 14 00_Amend 5.pdf PDF
Workers Acknowledgement of Explosives Hazards AMEND 4.pdf PDF
P-3002 HCP Price Schedule_BLANK 4-5-23 AMEND 4.pdf PDF
CG-102A_AMEND 4.pdf PDF
CS-102_REV_AMEND 4.pdf PDF
GI-115_AMEND 4.pdf PDF
CT-501 AMEND 4.pdf PDF
Additional Information on Batch Plant Site AMEND 4.pdf PDF
33 10 00 Water Piping Structures and Appurtenances_AMEND 4.pdf PDF
Attachment G - SBSP.pdf PDF
N4008023R0020 Amendment 0004.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_2 of 3 AMEND 4.pdf PDF
SSK-PreBid-Detonation Bunker Sand Layer Clarification AMEND 4 (1).pdf PDF
GI-114_AMEND 4.pdf PDF
E-103_AMEND 4.pdf PDF
CG-202_REV_AMEND 4.pdf PDF
CG-201_AMEND 4.pdf PDF
03___Boring Logs (1) AMEND 4.pdf PDF
01___Boring Location Diagram AMEND 4.pdf PDF
Attachment F - SBPCD.pdf PDF
02___Cross Sections AA and BB AMEND 4.pdf PDF
GI-102_REV.pdf PDF
Attachment P-3002 Price Proposal Form 3-22-23.pdf PDF
GI-501_REV.pdf PDF
N4008023R0020 Amendment 0003.pdf PDF
P3002_31 11 00_AMENDMENT 001.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
Attachment H - Base Access Form 4973-16FEB2023.xlsx XLSX spreadsheet
P-3002 IFC PLANS_REV_signed_Part 7 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 4 of 7.pdf PDF
2022.09.26 P-3002 IFC PLANS_N4008023R0020 INSTRUCTIONS.docx DOCX document
Attachment C - CONSTRUCTION DESIGN EXPERIENCE PROJECT DATA SHEET.docx DOCX document
N40080-23-R-0020 LARGE PROJECTS MACC.pdf PDF
Attachment A- PIEE Vendor Access Instructions.pdf PDF
P-3002 HCP Price Schedule_BLANK 3-1-23.pdf PDF
Attachment D - PPQ.docx DOCX document
Attachment G - SBSP.docx DOCX document
Show all 50

N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Propane Tank Information

• The tank is a steel tank that is above ground.

• Capacity: 10,00 Gallons

• There are no known contaminates in the soil.

• The fuel tank will been emptied by the Government prior to the Contractor commencing work on the tank. The 316th CES (or the 316 LRS) to work with propane supplier.

• At end of the fuel tank work the Contractor will not be responsible for filling the tank. The 316th CES (or the 316 LRS) to work with propane supplier.

• The Contractor should document the existing state of the fuel tank and will not be responsible for repairs for damages not caused by the Contractor’s work.

See attached specifications drawings of the propane tank for additional information.

"Ò

"Ò

"C

"C "C

"C

U

U

U

U U

!P !P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P !P

!P

!P

"a

"a

"a

"a

"a

"a

"a

³̀

!V

!V

!j

Width 7.0 Ft

Length 38.6.Ft

X012

X008

X014

0 50 100 150 200 250 Feet

FOR OFFICIAL USE ONLY

DEPARTMENT OF THE AIR FORCE

Air Force District of Washington

UTILITY MAP

JOINT BASE ANDREWS NAVAL FACILITY

WASHINGTON

MAP NO. G-TAB

q

MAGNETIC DECLINATION

10° 46' 00" WEST

DATE PRINTED:

11 Apr 23

1 inch = 155 feetSCALE

"K Fuel Valve

Ü Fuel Hydrant Pit

Õ Fuel Junction Box

½ Fuel Manhole

¿ Fuel Valve Pit æ Fuel Vent Pit

Ý Fuel Hydrant

%ß Fuel Meter

!s Wastewater Cleanout Fitter

"r Wastewater Valve

"i Wastewater Grease Trap

!j Wastewater Manhole

"n Wastewater Oil/Water Separator

!! Wastewater Pump

"Ã Wastewater Pump Ejector Station

"¬ Fuel Tank

! Storm Sewer Culvert

"Ö Central Heating/Cooling Pump

Á Water Junction Box

!V Water Manhole

³̀ Water Valve Pit

"a Water Valve

!P Well

!T Water Connection Point

"S Fire Hydrant

"ê Water Fitting Cap

P Water Fitting Tee

%W Water Meter

Airfield_Lighting Types « Airfield Approach Light Ç Airfield Arresting Gear

§ Airfield Centerline Light

¨ Airfield Distance Marker

U Airfield Guidance Sign

° Airfield Papi Light

« Airfield Pre-Threshold Light

É Airfield Runway Light

!² Airfield Strobe Beacon

® Airfield Threshold Light

¼ Airfield Windsock

# Storm Sewer Flow Control

!! Storm Sewer Discharge

!R Storm Sewer Catch Basin

"B Storm Sewer Curb Inlet

"C Storm Sewer Drop Inlet

FG Storm Sewer Roof Drain

D Storm Sewer Surface Linear

!E Storm Sewer Junction

Electrical_Junction Types Ì Electrical Handhole

 Electrical Junction Box

!Í Electrical Manhole

+ Electrical Pull Box

! Street Light

Ç Electrical Circuit Breaker

"Ò Pad Mounted Transformer Bank

¨ Pole Mounted Transformer Bank

Main_Water_Line

Road Centerline

Natural Gas Main

Abandoned Fuel

Main Fuel

Fuel Farm

Main Wastewater

Non-gated Storm Sewer Culvert

Chilled Water - Main

Comm_Line

Culvert Centerline

Storm Sewer

Electrical_Primary_Overhead

Electrical_Secondary_Overhead

Electrical_Primary_Underground

Electrical_Secondary_Underground

File details come from the government source that posted it. Updated .