GI-111_Amend 6.pdf

PDF 2 MB Posted

Attached to
N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) Federal contract opportunity
Solicitation number
N4008023R0020
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a construction phasing plan for relocating a hazardous cargo pad and EOD proficiency ranges at a naval facility. The plan details Phase 1 activities including coordinating work zone limits due to explosive safety quantity distance arcs, installing temporary fencing and entrances, clearing and grubbing the site, and conducting pre-consolidation work including installing wick drains, settlement plates, and monitoring equipment. Phase 1 will be split into Stage 1A and 1B with the first stage installing a double box culvert and the second re-routing a temporary section of the south perimeter road while demolishing the existing road. The related federal contract opportunity is a multiple award construction contract with an indefinite delivery/indefinite quantity provision being solicited by the Naval Facilities Engineering Command. Offerors should refer to SAM.gov for full solicitation documents, attachments, and any amendments.

View the file

Other files for this federal contract opportunity

Other files attached to N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
N4008023R0020 Amendment 0009.pdf PDF
N4008023R0020 Amendment 0007.pdf PDF
N4008023R0020 Amendment 0006.pdf PDF
E-500_Amend 6.pdf PDF
E-501_Amend 6.pdf PDF
Concrete Vault and Water Main additional Site photos (2).pdf PDF
CG-121_Amend 6 (2).pdf PDF
CU-505_Amend 6 (2).pdf PDF
CS-102_Amend 6 (2).pdf PDF
31 23 00.00 20_Amend 6 (2).pdf PDF
01 17 00_Amend 6 (2).pdf PDF
01 14 00_Amend 5.pdf PDF
CG-503_Amend 5.pdf PDF
CG-111_Amend 5.pdf PDF
CG-123_Amend 5.pdf PDF
CT-104_Amend 5.pdf PDF
ATTACHMENT H - P-3002 HCP PRICE SCHEDULE-BLANK 041323.pdf PDF
Workers Acknowledgement of Explosives Hazards AMEND 4.pdf PDF
Attachment G - SBSP.pdf PDF
N4008023R0020 Amendment 0004.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_2 of 3 AMEND 4.pdf PDF
SSK-PreBid-Detonation Bunker Sand Layer Clarification AMEND 4 (1).pdf PDF
GI-114_AMEND 4.pdf PDF
E-103_AMEND 4.pdf PDF
CG-202_REV_AMEND 4.pdf PDF
CG-201_AMEND 4.pdf PDF
03___Boring Logs (1) AMEND 4.pdf PDF
01___Boring Location Diagram AMEND 4.pdf PDF
Attachment F - SBPCD.pdf PDF
02___Cross Sections AA and BB AMEND 4.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_3 of 3 AMEND 4.pdf PDF
S-600_Rev AMEND 4.pdf PDF
Site Visit Details.pdf PDF
Wage D Heavy Prince Georges 3-24-23 AMEND 4.pdf PDF
CP-103_AMEND 4.pdf PDF
Attachment F - SBPCD.docx DOCX document
GI-501_REV.pdf PDF
N4008023R0020 Amendment 0003.pdf PDF
P3002_31 11 00_AMENDMENT 001.pdf PDF
N4008023R0020 Amendment 0002.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 7 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 4 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 2 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 1 of 7.pdf PDF
Attachment G - SBSP.docx DOCX document
2022.09.26 P-3002 IFC Specifications_signed_N40080-23-R-0020.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment B - PPI Log.xlsx XLSX spreadsheet
Attachment E - Historical Utilization of SB.docx DOCX document
Show all 50

N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SG

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E P A R T M E N T

O F

T H E

N A V Y

N A V A L

F A C I L I T I E S

E N G I N E E R I N G

C O M M A N D

DRAWFORM REVISION: 06 APRIL 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

W A

S H

IN

G

TO

N

J O I N T

B A S E

A N D R E W S

N A V A L

A I R

F A C I L I T Y

C A M P

S P R I N G S

M D

S Y M

D E S C R I P T I O N

D A T E

A P P R

P -3

R E

LO

C

A

TE

H A

ZA

R

D O

U S

C A

R G

O P

A D

A N

D E

O D

P R

O

FI

C

IE

N C

Y R

A N

G E

W A S H I N G T O N

N A V Y

Y A R D

W A S H I N G T O N

D C

N40080-22-R-8580

1396650

PROFESS IONAL ENG

I N

EE

R

ST

AT

E OF MARYLANDE

I

L IP

C

H

CR

R K

U

No . 28557

M A

AT

M

ON

S F

C O

N S

TR

U

C

TI

O N

P H

A S

IN

G

P

LA

N

P H

A S

E

GI-111

N

LEGEND

SG

GENERAL NOTES:

PHASE 1 ACTIVITIES

x x

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 241.36

AutoCAD SHX Text 241.36

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 244.11

AutoCAD SHX Text 244.11

AutoCAD SHX Text

WL

AutoCAD SHX Text 259.7

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

GENERATORS

AutoCAD SHX Text

STM/SEW

AutoCAD SHX Text

TOPO THIS

AutoCAD SHX Text

OBSCURE AREA

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SCE

AutoCAD SHX Text

SCE

AutoCAD SHX Text

MB

AutoCAD SHX Text

EXISTING AIRFIELD FENCE

AutoCAD SHX Text CONSTRUCT TEMPORARY PERIMETER ROAD PER PHASE 1B E&S CONTROL PLAN (ALIGNMENT APPROVAL REQUIRED BY BASE COMMANDER)

AutoCAD SHX Text

TEMPORARY CONSTRUCTION ACCESS GATE

AutoCAD SHX Text

STABILIZED CONSTRUCTION ENTRANCE

AutoCAD SHX Text

REMOVE EXISTING AIRFIELD FENCE AFTER CONSTRUCTION OF NEW TEMPORARY FENCE

AutoCAD SHX Text

ACCESS DRIVE TO REMAIN OPEN

AutoCAD SHX Text

SEE NOTE 8

AutoCAD SHX Text

EXISTING AIRFIELD GATE (TO REMAIN OPEN)

AutoCAD SHX Text

PHASE 1 EARTHWORK, GRADING, AND SITE PREP

AutoCAD SHX Text

MSA FENCE

AutoCAD SHX Text

EXISTING BASE PERIMETER FENCE

AutoCAD SHX Text

CONSTRUCT ORANGE SAFETY FENCE ON NORTH SIDE OF THE ROAD

AutoCAD SHX Text

EXISTING MSA GATE

AutoCAD SHX Text

PHASE 1 EARTHWORK, GRADING, AND SITE PREP PER E&S CONTROL PLAN

AutoCAD SHX Text

CONSTRUCTION ACCESS ROAD

AutoCAD SHX Text

ORANGE SAFETY FENCE ON NORTH SIDE OF THE ROAD

AutoCAD SHX Text

TEMPORARY AIRFIELD GATE CONTROLLED BY GOVERNMENT

AutoCAD SHX Text

CONSTRUCT TEMPORARY AIRFIELD CONSTRUCTION FENCE. SEE NOTE 4.

AutoCAD SHX Text

CONSTRUCT TEMPORARY AIRFIELD CONSTRUCTION FENCE. SEE NOTE 4.

AutoCAD SHX Text

NO CONSTRUCTION VEHICLE TRAFFIC ON T/W E

AutoCAD SHX Text T/W E

AutoCAD SHX Text T/W E

AutoCAD SHX Text T/W A2

AutoCAD SHX Text

PAD 91

AutoCAD SHX Text

RELOCATE EXISTING FUEL TANK, FENCE, AND EQUIPMENT

AutoCAD SHX Text

SCE

AutoCAD SHX Text

CONSTRUCT EOD RANGE

AutoCAD SHX Text PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 53990 , EXPIRATION DATE: 02-24-2023.

AutoCAD SHX Text 09/26/2022

AutoCAD SHX Text

AutoCAD SHX Text 0 ISSUE FOR CONSTRUCTION 09/26/2022ISSUE FOR CONSTRUCTION 09/26/2022 09/26/202209/26/2022

AutoCAD SHX Text

1 AMENDMENT 0005 04/15/2023AMENDMENT 0005 04/15/2023 04/15/202304/15/2023

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 13140284

AutoCAD SHX Text

AutoCAD SHX Text 240'

AutoCAD SHX Text 0'

AutoCAD SHX Text 1"=120'

AutoCAD SHX Text 120'

AutoCAD SHX Text 480'

AutoCAD SHX Text 360'

AutoCAD SHX Text 600'

AutoCAD SHX Text

1. SEE AIRFIELD COORDINATION NOTES ON GC-005. SEE AIRFIELD COORDINATION NOTES ON GC-005. 2. SHUT DOWN OF ANY AIRFIELD PAVEMENTS SHALL NOT OCCUR UNTIL AFTER MARCH 1ST SHUT DOWN OF ANY AIRFIELD PAVEMENTS SHALL NOT OCCUR UNTIL AFTER MARCH 1ST AND SHALL BE REOPENED BY NOV 15TH. KEEP EQUIPMENT AND EMPLOYEES WITHIN THE WORK AREA BOUNDARIES AT ALL TIMES TO PREVENT FOREIGN OBJECT DEBRIS PRODUCTION AND COMPLY WITH AIRFIELD CONTROLLED AREA SECURITY REQUIREMENTS. NO AIRFIELD PAVEMENT WORK BETWEEN NOV 15TH AND MARCH 1ST. 3. CONTRACTOR PERSONNEL ARE STRICTLY PROHIBITED FROM CROSSING OUTSIDE THE CONTRACTOR PERSONNEL ARE STRICTLY PROHIBITED FROM CROSSING OUTSIDE THE WORK AREA BOUNDARIES AS DEFINED ON THIS PLAN. CROSSING THE BOUNDARY WITHOUT PERMISSION OF THE CONTRACTING OFFICER AND AIRFIELD MANAGEMENT IS CAUSE FOR IMMEDIATE AND PERMANENT DISMISSAL FROM THE SITE. 4. COORDINATE LOCATIONS OF ALL AIRFIELD FENCES AND BARRICADES WITH CONTRACTING COORDINATE LOCATIONS OF ALL AIRFIELD FENCES AND BARRICADES WITH CONTRACTING OFFICER, AIRFIELD MANAGEMENT, AND BASE SECURITY. FINAL LOCATION TO BE APPROVED BY BASE COMMANDER. CONTRACTOR STAFF TO ATTEND AIRFIELD DRIVING COURSE TRAINING BY BASE CE OFFICE PRIOR TO ACCESSING AREA TO INSTALL FENCE. CONTRACTOR TO SELF ESCORT WORKERS FOR FENCE INSTALLATION. CONTRACTOR TO PROVIDE ICOM RADIOS TO MAINTAIN COMMUNICATIONS WITH ATCT AND SECURITY FORCES DURING FENCE INSTALLATION. 5. CONTRACTOR SHALL MAINTAIN ALL TEMPORARY LIGHTING, LIGHTED BARRICADES, AND CONTRACTOR SHALL MAINTAIN ALL TEMPORARY LIGHTING, LIGHTED BARRICADES, AND ALL SIGNAGE THROUGHOUT THE DURATION OF THE CONTRACT, INCLUDING THE SHUT DOWN OF CONSTRUCTION DUE TO WEATHER. 6. PROJECT REQUIRES CLOSURE OF THE TAXIWAY AND MUST BE COORDINATED WITH THE PROJECT REQUIRES CLOSURE OF THE TAXIWAY AND MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND AIRFIELD MANAGEMENT. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER AND AIRFIELD OPERATIONS A MINIMUM OF 21 DAYS PRIOR TO REQUESTED CLOSURES OF ANY SECTIONS OF THE AIRFIELD. 7. ALL WORK ON THE PROJECT SHALL BE COMPLETED WITHIN THE CONTRACT TIME ALL WORK ON THE PROJECT SHALL BE COMPLETED WITHIN THE CONTRACT TIME ALLOTTED, WITH ALL AIRFIELD PAVEMENTS OPEN AND OPERATIONAL, ALL HAUL ROADS REPAIRED/REMOVED, AND ALL STAGING AND LAYDOWN AREAS REPAIRED TO CONDITIONS PRIOR TO THE START OF CONSTRUCTION. SEE CONTRACT SPECIFICATIONS FOR LIQUIDATED DAMAGES. 8. PROVIDE A BONDED SECURITY GUARD AT THE CONSTRUCTION ACCESS GATES. NO PROVIDE A BONDED SECURITY GUARD AT THE CONSTRUCTION ACCESS GATES. NO UNAUTHORIZED PERSONNEL ARE PERMITTED BEYOND THESE POINTS. GATE AND FENCE OPENINGS MUST BE MANNED BY THE SECURITY GUARD OR CLOSED AND LOCKED AT ALL TIMES. COORDINATE WITH THE CONTRACTING OFFICER, AIRFIELD MANAGEMENT AND SECURITY FORCES. 9. PROVIDE A SINGLE CONTAINED TRUCK WASHOUT POINT IN THE WORK AREA AND IN PROVIDE A SINGLE CONTAINED TRUCK WASHOUT POINT IN THE WORK AREA AND IN THE BATCH PLANT AREA. 10. CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE EXPLOSIVE SAFETY QUANTITY CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE EXPLOSIVE SAFETY QUANTITY DISTANCE ARCS (QD ARCS) FOR THE EXISTING MUNITIONS STORAGE AREA (MSA). CONTRACTOR TO COORDINATE WITH GOVERNMENT AND CONTRACTING OFFICER AND REFER TO THE PROJECT SPECIFICATIONS FOR THE ACKNOWLEDGEMENT OF EXPLOSIVES HAZARDS WAIVER. SEE LOCATION ON SHEET GI-102. 11. CONTRACTOR MUST CHECK IN AND OUT WITH AIRFIELD MANAGEMENT OPERATIONS DAILY CONTRACTOR MUST CHECK IN AND OUT WITH AIRFIELD MANAGEMENT OPERATIONS DAILY DURING THE DURATION OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE INSTALLATION OF THE TEMPORARY AIRFIELD SECURITY FENCE.

AutoCAD SHX Text TEMPORARY CONSTRUCTION FENCE ORANGE SAFETY FENCE SECURITY GUARD (SEE NOTE 8) TEMPORARY CONSTRUCTION ENTRANCE WICK DRAIN/PRE-CONSOLIDATION PHASE 1A AREA WICK DRAIN/PRE-CONSOLIDATION PHASE 1B AREA SETTLEMENT PLATE VIBRATING WIRE PIEZOMETER INCLINOMETER

AutoCAD SHX Text COORDINATE LIMITS ON WORK ZONE DUE TO EXISTING QD ARCS. INSTALL TEMPORARY FENCES AND CONSTRUCTION ENTRANCES. SEE NOTE 4. CLEAR AND GRUB SITE PER EROSION AND SEDIMENT CONTROL PLANS. INSTALL PHASE 1A WICK DRAINS, SETTLEMENT PLATES, VIBRATING WIRE PIEZOMETERS, AND INCLINOMETERS. CONDUCT PRECONSOLIDATION OF DESIGNATED AREAS, REFER TO EROSION AND SEDIMENT CONTROL PLAN STAGE 1A FOR DETAILED SEQUENCE OF CONSTRUCTION. INSTALL DOUBLE BOX CULVERT (P-1) CONSTRUCT TEMPORARY S. PERIMETER ROAD RE-ROUTE, REFER TO EROSION AND SEDIMENT CONTROL PLAN STAGE 1B FOR DETAILED SEQUENCE OF CONSTRUCTION. MOVE TRAFFIC TO TEMPORARY ROAD. DEMO EXISTING ROAD. INSTALL PHASE 1B WICK DRAINS, SETTLEMENT PLATES, VIBRATING WIRE PIEZOMETERS, AND INCLINOMETERS. CONDUCT PRECONSOLIDATION OF DESIGNATED AREAS, REFER TO EROSION AND SEDIMENT CONTROL PLAN STAGE 1B FOR DETAILED SEQUENCE OF CONSTRUCTION.

AutoCAD SHX Text C1

AutoCAD SHX Text

GI-501

AutoCAD SHX Text C4

AutoCAD SHX Text

GI-502

AutoCAD SHX Text A4

AutoCAD SHX Text

GI-501

AutoCAD SHX Text

File details come from the government source that posted it. Updated .