32 92 19_Amend 6 (2).pdf
PDF 39 KB Posted
- Attached to
- N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) Federal contract opportunity
- Solicitation number
- N4008023R0020
About this file
This document is a technical specification for seeding work on a federal construction project. It specifies requirements for seed mixtures, topsoil composition, soil amendments, fertilizers, mulches and other products. It also provides instructions for seeding preparation and application methods, mulching, erosion control installation, watering and project closeout. Relevant work includes furnishing and placing 4 inches of off-site topsoil meeting specified composition thresholds, incorporating soil amendments and fertilizers, hydroseeding specified seed mixtures at required rates, straw or hay mulching anchored with a mechanical land packer or tackifier, and erosion control measures. The project involves relocating a hazardous cargo pad and explosive ordnance disposal range for Joint Base Andrews in Camp Springs, Maryland.
View the file
Other files for this federal contract opportunity
Show all 50
N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-3002 Relocated HCP & EOD Proficiency Range eProjects # 1396650 Joint Base Andrews, Camp Springs, MD IFC, September 26, 2022
SECTION 32 92 19
SEEDING
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C602 (2013a) Agricultural Liming Materials
ASTM D4972 (2013) pH of Soils
U.S. DEPARTMENT OF AGRICULTURE (USDA)
AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act
DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0
1.2 DEFINITIONS
1.2.1 Stand of Turf
95 percent ground cover of the established species.
1.3 RELATED REQUIREMENTS
Section 31 23 00.00 20 EXCAVATION AND FILL and Section 32 92 19 SEEDING applies to this section for pesticide use and plant establishment requirements, with additions and modifications herein.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Wood Cellulose Fiber Mulch
Fertilizer
Include physical characteristics, and recommendations.
SD-06 Test Reports
SECTION 32 92 19 Page 1
Topsoil Composition Tests (reports and recommendations).
SD-07 Certificates
State Certification and Approval for Seed
SD-08 Manufacturer's Instructions
Erosion Control Materials
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.1.1 Seed Protection
Protect from drying out and from contamination during delivery, on-site storage, and handling.
1.5.1.2 Fertilizer Gypsum Sulfur Iron and Lime Delivery
Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer gypsum sulphur iron and lime may be furnished in bulk with certificate indicating the above information.
1.5.2 Storage
1.5.2.1 Seed, Fertilizer Gypsum Sulfur Iron and Lime Storage
Store in cool, dry locations away from contaminants.
1.5.2.2 Topsoil
Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non-selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil.
1.5.2.3 Handling
Do not drop or dump materials from vehicles.
1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS
1.6.1 Restrictions
Do not plant when the ground is frozen, snow covered, muddy, or when air temperature exceeds 90 degrees Fahrenheit.
1.7 TIME LIMITATIONS
1.7.1 Seed
Apply seed within twenty four hours after seed bed preparation.
SECTION 32 92 19 Page 2
PART 2 PRODUCTS
2.1 SEED
2.1.1 Classification
Provide State-approved seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes will be acceptable when field mix is performed on site in the presence of the Contracting Officer.
2.1.2 Planting Dates
Planting Season Planting Dates
Season 1 March 15 - May 15
Season 2 August 15 - October 15
Temporary Seeding May 15 - August 15
2.1.3 Seed Purity
Botanical Name
Common Name
Minimum Percent Pure Seed
Minimum Percent Germination and Hard Seed
Maximum Percent Weed Seed
Poa pratensis
Kentucky Bluegrass
90 80 0.5
Festuca rubra var.
rubra
Creeping Red Fescue
95 80 0.5
Festuca rubra ssp.
commutata
Chewings Fescue
95 80 0.5
Poa trivialis
Rough Bluegrass
90 80 0.5
2.1.4 Seed Mixture by Weight
Refer to Drawings.
SECTION 32 92 19 Page 3
2.2 TOPSOIL
2.2.1 On-Site Topsoil
Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph COMPOSITION.
When available topsoil must be existing surface soil stripped and stockpiled on-site in accordance with Section 31 23 00.00 20 EXCAVATION
AND FILL.
2.2.2 Off-Site Topsoil
Conform to requirements specified in paragraph COMPOSITION. Additional topsoil must be furnished by the Contractor.
2.2.3 Composition
Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42 . Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH must be tested in accordance with ASTM D4972. Topsoil must be free of sticks, stones, roots, and other debris and objectionable materials. Other components must conform to the following limits:
Silt 35 percent
Clay 20-40 percent
Sand 20-50 percent pH 5.5 to 7.0
Soluble Salts 900 ppm maximum
2.3 SOIL CONDITIONERS
Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein.
2.3.1 Lime
Commercial grade hydrate limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C602 of not less than 80 percent.
2.3.2 Aluminum Sulfate
Commercial grade.
2.3.3 Sulfur
100 percent elemental.
2.3.4 Iron
100 percent elemental.
SECTION 32 92 19 Page 4
2.3.5 Sand
Clean and free of materials harmful to plants.
2.3.6 Perlite
Horticultural grade.
2.3.7 Composted Derivatives
Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties:
2.3.7.1 Particle Size
Minimum percent by weight passing:
No. 4 mesh screen 95 No. 8 mesh screen 80
2.3.7.2 Nitrogen Content
Minimum percent based on dry weight:
Fir Sawdust 0.7 Fir or Pine Bark 1.0
2.3.8 Gypsum
Coarsely ground gypsum comprised of calcium sulfate dihydrate 80 percent, calcium 18 percent, sulfur 14 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen.
2.3.9 Calcined Clay
Calcined clay must be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent must pass a No. 8 sieve; a minimum 99 percent must be retained on a No. 60 sieve; and material passing a No. 100 sieve must not exceed 2 percent. Bulk density: A maximum 40 pounds per cubic foot.
2.4 FERTILIZER
2.4.1 Granular Fertilizer
Organic, granular controlled release fertilizer of proportions necessary to eliminate any deficiencies of topsoil.
2.5 MULCH
Mulch must be free from noxious weeds, mold, and other deleterious materials.
2.5.1 Straw
Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw must contain no fertile seed.
SECTION 32 92 19 Page 5
2.5.2 Hay
Air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Hay must be sterile, containing no fertile seed.
2.5.3 Wood Cellulose Fiber Mulch
Use recovered materials of either paper-based (100 percent post-consumer content) or wood-based (100 percent total recovered content) hydraulic mulch. Processed to contain no growth or germination-inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2. Use with hydraulic application of grass seed and fertilizer.
2.6 WATER
Source of water must be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life.
2.7 EROSION CONTROL MATERIALS
Erosion control material must conform to the following:
2.7.1 Erosion Control Blanket
70 percent agricultural straw/30 percent coconut fiber matrix stitched with a degradable nettings, designed to degrade within 18 months.
2.7.2 Erosion Control Fabric
Fabric must be knitted construction of polypropylene yarn with uniform mesh openings 3/4 to 1 inch square with strips of biodegradable paper.
Filler paper strips must have a minimum life of 6 months.
2.7.3 Erosion Control Net
Net must be heavy, twisted jute mesh, weighing approximately 1.22 pounds per linear yard and 4 feet wide with mesh openings of approximately one inch square.
2.7.4 Hydrophilic Colloids
Hydrophilic colloids must be physiologically harmless to plant and animal life without phytotoxic agents. Colloids must be naturally occurring, silicate powder based, and must form a water insoluble membrane after curing. Colloids must resist mold growth.
2.7.5 Erosion Control Material Anchors
Erosion control anchors must be as recommended by the manufacturer.
SECTION 32 92 19 Page 6
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 EXTENT OF WORK
Provide soil preparation prior to planting (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations.
3.1.1.1 Topsoil
Provide 4 inches of off-site topsoil to meet indicated finish grade.
After areas have been brought to indicated finish grade, incorporate fertilizer pH adjusters soil conditioners into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic.
3.1.1.2 Soil Conditioner Application Rates
Apply soil conditioners at rates as determined by laboratory soil analysis of the soils at the job site.
3.1.1.3 Fertilizer Application Rates
Apply fertilizer at rates as determined by laboratory soil analysis of the soils at the job site.
3.2 SEEDING
3.2.1 Seed Application Seasons and Conditions
Refer to Drawings.
3.2.2 Seed Application Method
Seeding method must be hydroseeding.
3.2.2.1 Hydroseeding
First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper must be applied as part of the hydroseeding operation.
Fiber must be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed must be mixed to ensure broadcasting at the rate of 3-4 pounds per 1000 square feet.
When hydraulically sprayed on the ground, material must form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch.
3.2.3 Mulching
3.2.3.1 Hay or Straw Mulch
Hay or straw mulch must be spread uniformly at the rate of 2 tons per acre.
SECTION 32 92 19 Page 7
Mulch must be spread by hand, blower-type mulch spreader, or other approved method. Mulching must be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch must not be bunched or clumped. Sunlight must not be completely excluded from penetrating to the ground surface. All areas installed with seed must be mulched on the same day as the seeding. Mulch must be anchored immediately following spreading.
3.2.3.2 Mechanical Anchor
Mechanical anchor must be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.
3.2.3.3 Non-Asphaltic Tackifier
Hydrophilic colloid must be applied at the rate recommended by the manufacturer, using hydraulic equipment suitable for thoroughly mixing with water. A uniform mixture must be applied over the area.
3.2.4 Rolling
Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width.
If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated.
3.2.5 Erosion Control Material
Install in accordance with manufacturer's instructions, where indicated or as directed by the Contracting Officer.
3.2.6 Watering
Start watering areas seeded as required by temperature and wind conditions.
Apply water at a rate sufficient to insure thorough wetting of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out.
3.3 PROTECTION OF TURF AREAS
Immediately after turfing, protect area against traffic and other use.
3.4 RESTORATION
Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete.
-- End of Section --
SECTION 32 92 19 Page 8
| 32 92 19 - SEEDING |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Stand of Turf |
| 1.3 RELATED REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.5.1 Delivery |
| 1.5.1.1 Seed Protection |
| 1.5.1.2 Fertilizer Gypsum Sulfur Iron and Lime Delivery |
| 1.5.2 Storage |
| 1.5.2.1 Seed, Fertilizer Gypsum Sulfur Iron and Lime Storage |
| 1.5.2.2 Topsoil |
| 1.5.2.3 Handling |
| 1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS |
| 1.6.1 Restrictions |
| 1.7 TIME LIMITATIONS |
| 1.7.1 Seed |
| PART 2 PRODUCTS |
| 2.1 SEED |
| 2.1.1 Classification |
| 2.1.2 Planting Dates |
| 2.1.3 Seed Purity |
| 2.1.4 Seed Mixture by Weight |
| 2.2 TOPSOIL |
| 2.2.1 On-Site Topsoil |
| 2.2.2 Off-Site Topsoil |
| 2.2.3 Composition |
| 2.3 SOIL CONDITIONERS |
| 2.3.1 Lime |
| 2.3.2 Aluminum Sulfate |
| 2.3.3 Sulfur |
| 2.3.4 Iron |
| 2.3.5 Sand |
| 2.3.6 Perlite |
| 2.3.7 Composted Derivatives |
| 2.3.7.1 Particle Size |
| 2.3.7.2 Nitrogen Content |
| 2.3.8 Gypsum |
| 2.3.9 Calcined Clay |
| 2.4 FERTILIZER |
| 2.4.1 Granular Fertilizer |
| 2.5 MULCH |
| 2.5.1 Straw |
| 2.5.2 Hay |
| 2.5.3 Wood Cellulose Fiber Mulch |
| 2.6 WATER |
| 2.7 EROSION CONTROL MATERIALS |
| 2.7.1 Erosion Control Blanket |
| 2.7.2 Erosion Control Fabric |
| 2.7.3 Erosion Control Net |
| 2.7.4 Hydrophilic Colloids |
| 2.7.5 Erosion Control Material Anchors |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 EXTENT OF WORK |
| 3.1.1.1 Topsoil |
| 3.1.1.2 Soil Conditioner Application Rates |
| 3.1.1.3 Fertilizer Application Rates |
| 3.2 SEEDING |
| 3.2.1 Seed Application Seasons and Conditions |
| 3.2.2 Seed Application Method |
| 3.2.2.1 Hydroseeding |
| 3.2.3 Mulching |
| 3.2.3.1 Hay or Straw Mulch |
| 3.2.3.2 Mechanical Anchor |
| 3.2.3.3 Non-Asphaltic Tackifier |
| 3.2.4 Rolling |
| 3.2.5 Erosion Control Material |
| 3.2.6 Watering |
| 3.3 PROTECTION OF TURF AREAS |
| 3.4 RESTORATION |
File details come from the government source that posted it. Updated .