This document is a bid schedule for a federal construction contract to repair seawalls at the United States Naval Academy in Annapolis, Maryland. The contract involves repairing portions of the seawall at Farragut Field and Santee Basin over multiple phases. Pricing is requested for base line work and six optional items including additional seawall construction, removal of contaminated materials, and fill provision and compaction. Unit prices are required for various construction elements. The total proposed contract value will be determined by which optional items are awarded in addition to the base work. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seawall Repairs for Farragut Field and Santee Basin SR15012234 US Naval Academy Annapolis, MD
PRICE SCHEDULE
N40080-22-C-XXXX
1607973 / SR15012234
SEAWALL REPAIRS FOR FARRAGUT FIELD
AND PART OF SANTEE BASIN
US NAVAL ACADEMY,
ANNAPOLIS, MD
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used with the contract.
Provide the Contract Line Item Number (CLIN) lump sum price for the following Items:
CLIN 0001 – BASE PRICE – Price includes the following:
| SUB-CLIN |
| DESCRIPTION |
| TOTAL PRICE |
| 0001AA |
| Price for the entire work to construct Phase 1A of the Farragut Field bulkhead, in accordance with the drawings and specifications, including construction and removal of the temporary road for Phases 1A to 1C, and excluding work described in any other bid item. |
| $____________ |
| 0001AB |
| Price for the listed work in construction of Phase 1A of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item. |
Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
| Subtotal |
| Mob/Demob of Sheet Pile Driving Equipment |
| Each |
| Mob/Demob of Deadman Pile Driving Equipment |
| Each |
Steel Sheet Piling Finished in place and accepted
| SF |
| $______________ |
| 25,000 SF |
| Concrete Deadman Piles finished in place and accepted |
| LF |
6,500 LF
| H-Pile Deadman Piles finished in place and accepted |
| LF |
2,750 LF
TOTAL PRICE FOR CLIN 0001 $_________________
CLIN 0002 – BID OPTION 1 – Price includes the following:
| SUB-CLIN |
| DESCRIPTION |
| TOTAL PRICE |
| 0001AC |
| Price for the entire work to construct Phase 1B of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item. |
| $____________ |
| 0001AD |
| Price for the listed work in construction of Phase 1B of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item. |
Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
| Subtotal |
Steel Sheet Piling Finished in place and accepted
| SF |
| $______________ |
| 25,000 SF |
| Concrete Deadman Piles finished in place and accepted |
| LF |
5,000 LF
| H-Pile Deadman Piles finished in place and accepted |
| LF |
1,650 LF
TOTAL PRICE FOR CLIN 0002 $_________________
CLIN 0003 – BID OPTION 2 – Price includes the following:
| SUB-CLIN |
| DESCRIPTION |
| TOTAL PRICE |
| 0001AE |
| Price for the entire work to construct Phase 1C of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item. |
| $____________ |
| 0001AF |
| Price for the listed work in construction of Phase 1C of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item. |
Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
| Subtotal |
Steel Sheet Piling Finished in place and accepted
| SF |
| $______________ |
| 25,000 SF |
| Concrete Deadman Piles finished in place and accepted |
| LF |
3,800 LF
| H-Pile Deadman Piles finished in place and accepted |
| LF |
1,600 LF
TOTAL PRICE FOR CLIN 0003 $_________________
CLIN 0004 – BID OPTION 3: BULKHEAD PHASE 2 – Price includes the following:
| SUB-CLIN |
| DESCRIPTION |
| TOTAL PRICE |
| 0001AG |
| Price for the entire work to construct Santee Basin bulkhead, in accordance with the drawings and specifications, including adjustment of the temporary road for construction, of this item and excluding work described in any other bid item. |
| $____________ |
| 0001AH |
| Price for the listed work in construction of Santee Basin bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item. |
Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
| Subtotal |
Steel Sheet Piling Finished in place and accepted
SF
11,500 SF
S___________
TOTAL PRICE FOR CLIN 0004 $_________________
CLIN 0005 – BID OPTION 4: SEAWALL EXTENSION, PHASE 3 – Price includes the following:
Price for the entire work to construct vertical extension of the seawall from elevation of 8.02’ to 9.07’, in accordance with the drawings and specifications, but excluding work described in any other CLIN. Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.
TOTAL PRICE FOR CLIN 0005 $_________________
CLIN 0006 – OPTION 5: REMOVAL/DISPOSAL OILY WATER – Price includes the following:
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
| Subtotal |
| Removal and disposal of oily water and sludge inside manholes. |
| Gal. |
400 gal.
TOTAL PRICE FOR CLIN 0006 $_________________
CLIN 0007 – OPTION 6: REMOVAL CONTAMINATED SOILS – Price includes the following:
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
Removal and disposal of Contaminated stockpiled soils
CF
$______________/CF
3,500 CF
TOTAL PRICE FOR CLIN 0007 $_________________
CLIN 0008 – OPTION 7: PROVISION & COMPACTION OF FILL – Price includes the following:
| Item |
| Unit |
| Unit Price |
| Estimated Qty. |
| Provision and compaction of fill in place of removed contaminated soils |
| CF |
$______________/CF
3,500 CF
TOTAL PRICE FOR CLIN 0008 $_________________