Revised Price Schedule dated 15 JUNE.docx

DOCX document 20 KB Posted

Attached to
SEAWALL REPAIRS FOR FARRAGUT AND SANTEE BASIN, UNITED STATES NAVAL ACADEMY, ANNAPOLIS, MD
Solicitation number
N4008022R3927
Issued by

About this file

This document is a revised price schedule for a federal contract solicitation seeking proposals to perform seawall repairs at the United States Naval Academy in Annapolis, Maryland. The scope of work includes repairing portions of the seawall at Farragut Field and Santee Basin through constructing a new sheet pile wall outboard of the existing structures, with Farragut Field utilizing a new tieback system and Santee Basin utilizing the existing tieback system. Offerors are required to provide lump sum or unit pricing for seven contract line item numbers covering the base scope of work, four optional bid items, and the removal and disposal of contaminated materials. Pricing is requested for sheet pile installation, deadman pile installation, bulkhead construction, seawall extensions, and contaminated waste removal. The total evaluated price will be the sum of all CLIN prices. Proposals must include pricing for all CLINs to be considered responsive. The solicitation is being conducted by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
RFI 87 Additional data.pdf PDF
N4008022R3927-0007.pdf PDF
N4008022R3927-0006.pdf PDF
Revised Price Schedule dated 16 JUNE 2022.docx DOCX document
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
Farragut Field Seawall Spec 01 14 00.pdf PDF
SR15012234 Bid Schedule_Amend 0003.docx DOCX document
N4008022R3927 Amendment 0003.pdf PDF
Seawall Site Visit Sign-in Sheet.pdf PDF
Farragut Field Seawall - Spec 01 14 00.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0001.pdf PDF
SR15012234 Final Drawings.pdf PDF
ATTACHMENT 1 - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.docx DOCX document
ATTACHMENT 3 - Historical SB Utilization Form.docx DOCX document
ATTACHMENT 2-Safety Data Sheet.docx DOCX document
Price Schedule.docx DOCX document
ATTACHMENT 6 - Past Performance Questionnaire.doc DOC document
Request for Information Form.docx DOCX document
ATTACHMENT 5 Small Business Subcontract Plan Template.doc DOC document
N4008022R3927 Solicitation.pdf PDF
SR15012234 Final Specifications.pdf PDF
ATTACHMENT 4 - SBPCD.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED PRICE SCHEDULE dated 15 JUNE

N40080-22-R-3927

1607973 / SR15012234

SEAWALL REPAIRS FOR FARRAGUT FIELD

AND PART OF SANTEE BASIN

US NAVAL ACADEMY,

ANNAPOLIS, MD

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used with the contract.

Provide the Contract Line Item Number (CLIN) lump sum price for the following Items:

CLIN 0001 – BASE PRICE – Price includes the following:

SUB-CLIN
DESCRIPTION
TOTAL PRICE
0001AA
Price for the entire work to construct Phase 1A of the Farragut Field bulkhead, in accordance with the drawings and specifications, including construction and removal of the temporary road for Phases 1A to 1C, and excluding work described in any other bid item.
$____________
0001AB
Price for the listed work in construction of Phase 1A of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item.

Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.

Item
Unit
Unit Price
Estimated Qty.
Subtotal
Mob/Demob of Sheet Pile Driving Equipment
Each
Mob/Demob of Deadman Pile Driving Equipment
Each

Steel Sheet Piling Finished in place and accepted

SF
$______________
25,000 SF
Concrete Deadman Piles finished in place and accepted
LF

6,500 LF

H-Pile Deadman Piles finished in place and accepted
LF

2,750 LF

TOTAL PRICE FOR CLIN 0001 $_________________

CLIN 0002 – BID OPTION 1 – Price includes the following:

SUB-CLIN
DESCRIPTION
TOTAL PRICE
0001AC
Price for the entire work to construct Phase 1B of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item.
$____________
0001AD
Price for the listed work in construction of Phase 1B of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item.

Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.

Item
Unit
Unit Price
Estimated Qty.
Subtotal

Steel Sheet Piling Finished in place and accepted

SF
$______________
25,000 SF
Concrete Deadman Piles finished in place and accepted
LF

5,000 LF

H-Pile Deadman Piles finished in place and accepted
LF

1,650 LF

TOTAL PRICE FOR CLIN 0002 $_________________

CLIN 0003 – BID OPTION 2 – Price includes the following:

SUB-CLIN
DESCRIPTION
TOTAL PRICE
0001AE
Price for the entire work to construct Phase 1C of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item.
$____________
0001AF
Price for the listed work in construction of Phase 1C of the Farragut Field bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item.

Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.

Item
Unit
Unit Price
Estimated Qty.
Subtotal

Steel Sheet Piling Finished in place and accepted

SF
$______________
25,000 SF
Concrete Deadman Piles finished in place and accepted
LF

3,800 LF

H-Pile Deadman Piles finished in place and accepted
LF

1,600 LF

TOTAL PRICE FOR CLIN 0003 $_________________

CLIN 0004 – BID OPTION 3: BULKHEAD PHASE 2 – Price includes the following:

SUB-CLIN
DESCRIPTION
TOTAL PRICE
0001AG
Price for the entire work to construct Santee Basin bulkhead, in accordance with the drawings and specifications, including adjustment of the temporary road for construction, of this item and excluding work described in any other bid item.
$____________
0001AH
Price for the listed work in construction of Santee Basin bulkhead, in accordance with the drawings and specifications, and excluding work described in any other bid item.

Provide unit prices below for accepted finished work in place. Unit Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.

Item
Unit
Unit Price
Estimated Qty.
Subtotal

Steel Sheet Piling Finished in place and accepted

SF

11,500 SF

S___________

TOTAL PRICE FOR CLIN 0004 $_________________

CLIN 0005 – BID OPTION 4: SEAWALL EXTENSION, PHASE 3 – Price includes the following:

Price for the entire work to construct vertical extension of the seawall from elevation of 8.02’ to 9.07’, in accordance with the drawings and specifications, but excluding work described in any other CLIN. Prices shall include all necessary material, delivery, installation, removal, disposal, insurance, applicable taxes, overhead, and profit.

TOTAL PRICE FOR CLIN 0005 $_________________

CLIN 0006 – OPTION 5: REMOVAL/DISPOSAL OILY WATER – Price includes the following:

Item
Unit
Unit Price
Estimated Qty.
Subtotal
Removal and disposal of oily water and sludge inside manholes.
Gal.

400 gal.

TOTAL PRICE FOR CLIN 0006 $_________________

CLIN 0007 – OPTION 6: REMOVAL CONTAMINATED SOILS – Price includes the following:

Item
Unit
Unit Price
Estimated Qty.

Removal and disposal of Contaminated stockpiled soils

CF

$______________/CF

3,500 CF

TOTAL PRICE FOR CLIN 0007 $_________________

CLIN 0008 – OPTION 7: PROVISION & COMPACTION OF FILL – Price includes the following:

Item
Unit
Unit Price
Estimated Qty.
Provision and compaction of fill in place of removed contaminated soils
CF

$______________/CF

3,500 CF

TOTAL PRICE FOR CLIN 0008 $_________________

TOTAL PRICE FOR ALL CLINS 0001-0008 $_________________

BID NOTES:

1. The Offeror shall provide a price for all items on the Price Schedule. The Government will evaluate offers based on the total evaluated price, which is the sum of CLINS 0001 through 0008.

2. A firm fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.

3. Failure to enter a price for any of the CLINS will result in the proposal being rejected as unacceptable.

4. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.

5. The Government reserves the unilateral right to award CLINs 0002, 0003, 0004, 0005, 0006, 0007, and/or 0008 to the Contractor at the proposed price within 365 calendar days after the contract award. Should the Government choose to exercise any of the options after award, the contract duration will remain the same.

6. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

7. The Offeror’s price is valid for 90 days from the receipt of proposals.

8. Total Contract duration is 730 calendar days after contract award.

9. If CLINs 0002, 0003, 0004, 0005, 0006, 0007, and/or 0008 are exercised after award, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all items.

10. For Sub-CLINS that require unit pricing, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be recognized as the intended bid and the total will be recalculated accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be recognized as the intended unit price.

Name and Address of Firm Submitting Offer:

Name and Title of Person Authorized to Sign Offer (Type or Print):

Print Name and Title

Signature Date

ACKNOWLEDGEMENT OF AMENDMENT(S)____________________________________

File details come from the government source that posted it. Updated .