ATTACHMENT_J-C.2_HISTORICAL_DATA.pdf

PDF 214 KB Posted

Attached to
FY19 JOB ORDER CONTRACT (JOC) NAVFAC WASHINGTON
Solicitation number
N4008019R2006
Issued by

About this file

This document provides historical data on past construction and facilities maintenance contracts awarded by the Naval Facilities Engineering Command (NAVFAC) Washington. The data spans from April 2018 through March 2019 and includes over 160 individual contract actions with a total obligated value of $16.9 million. The contracts covered a range of services including building repairs, HVAC replacements, electrical upgrades, roof replacements, and construction projects across numerous Naval bases including Dahlgren, Patuxent River, and Indian Head. The solicitation number N4008019R2006 is also listed, seeking job order contracting services in fiscal year 2019 for NAVFAC Washington facilities.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-C.2 HISTORICAL DATA

TO# Title

Award

Exec (A) Obl. Amt Admin Office

N4008018F4391

B1490 Replace Main Lobby Stairwell Lighting with

LED 04/03/2018 $11,526.18 W: DAHLGREN

N4008018F4398

Building 116 Provide Mold Remediation and HVAC

Replacement E2 04/04/2018 $34,302.70 W: DAHLGREN

N4008018F4423 BLDG 199 storm drainage flooding of WSIL 04/17/2018 $61,170.06 W: DAHLGREN

N4008018F4457

B213 & B1460- CONTRACT A/E TO PERFORM

INFRARED LEAK DETECTION 04/17/2018 $295,104.26 W: DAHLGREN

N4008018F4521 1520 E Wing Provice 115VAC 60Hz 1 phase power for ACB16 - TI16 equipment suite 05/14/2018 $80,997.62 W: DAHLGREN

N4008018F4571

B101 Replace single wall steel UST with double walled AST 06/04/2018 $72,519.28 W: DAHLGREN

N4008018F4637 B1000 REPLACE HVAC EQUIPMENT E2 06/27/2018 $129,393.27 W: DAHLGREN

N4008018F4638 B113 - INSULATE DUCT WORK 07/06/2018 $194,799.66 W: DAHLGREN

N4008018F4647 Repair/Modifications to Non-Compliant Exterior Facility Ladders 06/29/2018 $93,311.20 W: DAHLGREN

N4008018F4649 1452 JWAC Replace Chiller #1 07/06/2018 $231,514.91 W: DAHLGREN

N4008018F4689 1452 Replace #3 air handler on roof 07/17/2018 $279,942.72 W: DAHLGREN

N4008018F4696 LAWS TEST PAD 07/19/2018 $71,379.44 W: DAHLGREN

N4008018F4703 B1705 Install awning over the loading dock 07/19/2018 $16,474.63 W: DAHLGREN

N4008018F4708 AEP: B489 Replace Exterior Envelope 07/19/2018 $153,317.26 W: DAHLGREN

N4008018F4717 Paving/Parking near BLDG's 198, 199, 200 & 213 07/20/2018 $169,020.39 W: DAHLGREN

N4008018F4749 B101 & B182 AFV Charging Stations 07/27/2018 $51,321.54 W: DAHLGREN

N4008018F4755 AEP: 243 Site Development 08/01/2018 $435,180.68 W: DAHLGREN

N4008018F4759 1452 Replace #4 air handler on roof 08/02/2018 $295,790.16 W: DAHLGREN

N4008018F4768 Replace Floor Tile Building 150, Room 105 08/03/2018 $7,151.17 W: DAHLGREN

N4008018F4770

AEP:B221-Replace all vavs/vav hot water coils and pneumatic controls 08/03/2018 $542,243.41 W: DAHLGREN

N4008018F4779

AEP: 1490 Site Development, Fabrication and

Installation of Leased Trailers 08/07/2018 $159,205.30 W: DAHLGREN

N4008018F4792 B236 - REPALCE WOOD SIDING 08/08/2018 $75,963.00 W: DAHLGREN

N4008018F4840

AEP--BLDG 1490 Room 2033/2034 replace CRTAC with cassette type FC's 08/30/2018 $119,063.17 W: DAHLGREN

N4008018F4841 B199 BMS SIL-ADD ADITIONAL COOLING 08/30/2018 $29,687.69 W: DAHLGREN

N4008018F4851

1520 E Wing (Baseline 10) Provice 115VAC 60Hz 1 phase power for equipment suite 08/22/2018 $74,673.59 W: DAHLGREN

N4008018F4878

Bldg. 1193 - Repair/Replace Motors that operate pool roof 08/27/2018 $37,366.76 W: DAHLGREN

N4008018F4880 B1373 LAB CONVERSION 09/05/2018 $289,776.76 W: DAHLGREN

N4008018F4894 B1470 Remove and replace Duct Work 09/10/2018 $91,386.99 W: DAHLGREN

N4008018F4904 B1700 - Upgrade 1st Floor HVAC to Digital Controls 09/10/2018 $347,093.96 W: DAHLGREN

N4008018F4969 AEP:B1490 ADD COOLING TO ROOM 1095 09/12/2018 $72,066.81 W: DAHLGREN

N4008018F5016

1520 Replace 225 Ton Chiller #2 C Wing Mechanical room 09/17/2018 $244,615.76 W: DAHLGREN

N4008018F5024 AEP---- FENCE ON MAIN RANGE 09/18/2018 $410,244.00 W: DAHLGREN

N4008018F5058 B1460 Replace DSC Conf. RM system 09/25/2018 $104,393.37 W: DAHLGREN

N4008018F5067 Pave Parking Lot & Restrip - side of Chapel 09/28/2018 $53,673.54 W: DAHLGREN

N4008018F5111

Bldg 183 Room 023 Water Intrusion to include repairs to gutters, trim, fascia, soffits and flashing 09/26/2018 $96,906.29 W: DAHLGREN

N4008018F5117 B1700 - Upgrade Generators Switchgear & Controls 09/26/2018 $508,039.39 W: DAHLGREN

N4008018F5120 B1610 AHU Repair/Replacement 09/25/2018 $121,995.60 W: DAHLGREN

N4008019F4100

1450B Install rooftop lighting protection cables and rods 12/12/2018 $27,301.18 W: DAHLGREN

N4008019F4137 Install Vehicle Exhaust System Bldg. 411 01/11/2019 $72,195.89 W: DAHLGREN

N4008019F4139 B411 Roll Up Door Replacements 01/11/2019 $28,127.00 W: DAHLGREN

N4008019F4157 Demo Failed UST's 01/17/2019 $233,415.17 W: DAHLGREN

N4008019F4172 Repair Lower Steel Tower Framing at Range Station

#11 01/17/2019 $18,563.13 W: DAHLGREN

N4008019F4173 Replace Gutters Bldg. 212 (CDC) 01/24/2019 $11,075.72 W: DAHLGREN

N4008019F4178 Replace CRAC units Bldg. 1118 01/18/2019 $45,354.15 W: DAHLGREN

N4008019F4225

B1520 Repair heat exchangers on the chill water system located in A, B, and C wing 02/11/2019 $233,193.37 W: DAHLGREN

N4008019F4252 G/ATOR Operational Siting Pad 02/21/2019 $143,228.90 W: DAHLGREN

N4008019F4275 B1580 Replace three chillers 02/22/2019 $568,955.02 W: DAHLGREN

N4008019F4283 Bldg. 1470 Transformer Replacement 02/26/2019 $335,830.00 W: DAHLGREN

N4008019F4331 AEP - B202 REPLACE CHILLER 03/15/2019 $78,777.22 W: DAHLGREN

N4008019F4340 B1490 Repair/Replace Chiller # 1 03/19/2019 $34,149.50 W: DAHLGREN

N4008019F4342 Replace Trane RTU 1 & 2 Bldg. 1452 03/18/2019 $561,298.23 W: DAHLGREN

N4008019F4375

B9465 INSTALL PERMANENT LANDING FOR

SAFE MAINTENANCE OF AIR HANDLER 03/26/2019 $23,364.72 W: DAHLGREN

N4008018F4278 Rebuild #3 Air Compressor Motor and Compressor and Air Dryer 05/09/2018 $252,230.13 W: IND HD CON

N4008018F4743 Repairs to Exterior to Bldg 1581 07/31/2018 $486,829.93 W: IND HD CON

N4008018F4943 Bldg. 864 Replace HVAC 09/26/2018 $89,622.44 W: IND HD CON

N4008018F4949 Replace B.3 Storm water Pumps, FWF 09/26/2018 $32,921.83 W: IND HD CON

N4008018F5010 NSWC - Building 1864 Replace Emergency Generator 09/28/2018 $260,148.31 W: IND HD CON

N4008018F5099

TEMPORARY ADMIN SWING SPACE (UTILITIES,

FOUNDATION & SITEWORK) 09/28/2018 $276,562.76 W: IND HD CON

N4008018F5148 NSWC Building 720 - Paint Exterior and Interior 09/28/2018 $564,712.51 W: IND HD CON

N4008019F4041 Mold and Asbestos Abatement in Bldg 1662 03/22/2019 $159,209.54 W: IND HD CON

N4008019F4074 Bldg. 2144 Provide Enclosure 03/14/2019 $129,555.21 W: IND HD CON

N4008019F4092

Repaint Interior Floors in Bldg 901 and Apply Epoxy

Flooring at Bldg 2084 Room 115 12/11/2018 $150,496.79 W: IND HD CON

N4008018F4021 b406 renovate suite 105 06/27/2018 $41,862.73 W: PAX CON

N4008018F4031

Building 2182- Install Fire Suppression Sprinkler

System 07/12/2018 $551,062.55 W: PAX CON

N4008018F4097 Lasar/CALA Access Rd Washout 09/13/2018 $218,771.77 W: PAX CON

N4008018F4303 PATUXE-301 / HANGAR, MAIN - Room 104W Remove and Replace Asbestos Piping 05/02/2018 $29,013.03 W: PAX CON

N4008018F4305

PATUXE-448 / NAVAIR LOGISTICS AND ADMIN

- CONSTRUCT (3) THREE OFFICES BASEMENT

LEVEL + REPLACE CARPET AND PAINT 5

WINGS WITHIN BUILDING 448 09/12/2018 $223,640.51 W: PAX CON

N4008018F4323 B2189 - Paint Upper Exterior Trim and Molding 09/30/2018 $206,549.62 W: PAX CON

N4008018F4337

B2807 INSTALL CROSSWALK AND

PEDESTRIAN LIGHTS H84 06/04/2018 $27,971.44 W: PAX CON

N4008018F4396 B2168 REPAIRS FROM FLOODING 04/02/2018 $56,569.94 W: PAX CON

N4008018F4413

B2044 HVAC EVAL & Repairs - replace 3.5 ton split system 04/09/2018 $55,677.29 W: PAX CON

N4008018F4424

B-2187 REPLACE VH SSA LAB 400HZ

GENERATOR 04/17/2018 $42,238.77 W: PAX CON

N4008018F4473 B2805- INSTALL WALL FANS IN HANGER BAYS 05/07/2018 $29,505.30 W: PAX CON

N4008018F4492 B2369 Repair Concrete and Landscape 05/22/2018 $34,609.30 W: PAX CON

N4008018F4508 B1370 Install Tamper Resistant Receptacles 05/07/2018 $30,659.17 W: PAX CON

N4008018F4512

B2168 REPLACE CARPET IN CLASSROOMS A

AND B 05/08/2018 $10,406.60 W: PAX CON

N4008018F4513 B3201 REPAIR WATER DAMAGED BUILDING 05/07/2018 $36,374.58 W: PAX CON

N4008018F4554 B1371 and B1372 Magazine Fence and gates. 06/04/2018 $41,674.37 W: PAX CON

N4008018F4558 B1669 Replace Rooftop AC Unit 7.5 TON 05/31/2018 $27,955.95 W: PAX CON

N4008018F4580 B1490 Recaulk Exterior Panel Seams 06/04/2018 $75,065.04 W: PAX CON

N4008018F4600

B162 Abate then Paint Rooms & Renovate Circuits

Weathertight 08/31/2018 $231,733.29 W: PAX CON

N4008018F4682

IPL18, B111A Renovate Building Interior & Install

HVAC 07/17/2018 $16,649.04 W: PAX CON

N4008018F4713

B2030 SIDEWALK/LIGHTNING FOR STAFF &

PARENT PARKING 07/20/2018 $15,062.66 W: PAX CON

N4008018F4722 B438 Install Fiber Optic Duct Bank 08/01/2018 $68,690.52 W: PAX CON

N4008018F4729 Replace Water Main Valves at NAS PAX 09/10/2018 $248,173.99 W: PAX CON

N4008018F4737 B1712 ABATE ABESTOS TILE & MASTIC H84 07/26/2018 $28,653.00 W: PAX CON

N4008018F4785

B103 HVAC REPAIRS/REPLACEMENT IN RADAR

ROOM 08/11/2018 $226,467.95 W: PAX CON

N4008018F4797 B1490 Replace Wood Doors 08/24/2018 $43,860.03 W: PAX CON

N4008018F4814

Repair multiple sink holes around the base. Two sink holes on the air field, one by the tennis courts near the theater and one near B409 in the back drive aisle. 09/28/2018 $113,207.00 W: PAX CON

N4008018F4815 B1488 Replace Electric Panels on Syncrolift Dock 09/28/2018 $18,828.91 W: PAX CON

N4008018F4844 B2198 PAINT EJECTION TOWER H84 09/06/2018 $115,324.74 W: PAX CON

N4008018F4849 B-2182 INSTALL 400 HZ POWER 08/28/2018 $54,485.63 W: PAX CON

N4008018F4867 B301 REMEDIATE ASBESTOS MATERIALS 09/04/2018 $18,653.16 W: PAX CON

N4008018F4942 B8149 REPAIRS 09/28/2018 $32,383.35 W: PAX CON

N4008018F4946 B2109 Evaluate & Repair Carpet Peeling in RM 122 09/13/2018 $27,478.69 W: PAX CON

N4008018F4961 B1370 Convert Room 337 to Sterile Storage 09/30/2018 $17,933.86 W: PAX CON

N4008018F4987 RW14-32 Rubber Removal 09/20/2018 $70,703.00 W: PAX CON

N4008018F5026 B1370 Install new Flooring and Cove Base 09/29/2018 $269,859.84 W: PAX CON

N4008018F5042

B103 PAINT WALLS, RPR FLOORING AND INST

CARPET 09/24/2018 $186,970.56 W: PAX CON

N4008018F5045 B101 Repair hangar bay door apron 09/20/2018 $18,393.88 W: PAX CON

N4008018F5088 B115 - Replace Roadside Overhang Roof 09/26/2018 $33,406.41 W: PAX CON

N4008018F5091

Brace steel channel at B502 lean to. Use six pipe columns - 4-inch diameter x 1/4-inch wall. 09/28/2018 $4,731.06 W: PAX CON

N4008018F5093 B8104 Building Repairs 09/27/2018 $35,035.79 W: PAX CON

N4008018F5094 -- B503 Replace CRAC Unit 09/29/2018 $94,522.21 W: PAX CON

N4008018F5095

B2131 PATUXE-2131 / SUPT SYS ENG BLDG -

REPAIR ROOF 09/30/2018 $6,624.00 W: PAX CON

N4008018F5098 IPL18, B2193/B2197 Upgrade Power E2 09/27/2018 $561,786.63 W: PAX CON

N4008018F5106

B301 - Abate asbestos pipe insulation in Room 105R

& Sanding Room 09/25/2018 $26,740.01 W: PAX CON

N4008018F5135 Convert 2nd Floor bldg. 516 to Open Storage Secret 09/30/2018 $16,012.53 W: PAX CON

N4008018F5139 Bldg 2189 - Replace Carpet 09/29/2018 $83,647.54 W: PAX CON

N4008018F5140 B-2386 exterior painting 09/25/2018 $182,196.60 W: PAX CON

N4008018F5152

B420A PATUXE-420 / ENGINEER & SUP. OPS.

DIR.- REPLACE CRAC UNIT ROOM 106 09/27/2018 $61,522.00 W: PAX CON

N4008018F5155 B103/1368 Repair water intrusion issues 09/30/2018 $103,764.84 W: PAX CON

N4008018F5176

B-504 INSTALL ELECTRIC VEHICLE CHARGING

STATIONS 09/29/2018 $52,664.40 W: PAX CON

N4008018F5177 1609829 -- B420 REPLACE LIEBERT CRAC UNIT 09/30/2018 $78,950.54 W: PAX CON

N4008018F5218 B195 (MK-7) Replace Air Compressor 09/26/2018 $116,561.13 W: PAX CON

N4008018F5231

Convert Rms., 535.5 & 535.6 into Open Storage, Bldg., 2272 09/28/2018 $26,283.67 W: PAX CON

N4008018F5234 B1370 Remove Abandoned Fixtures and Repair Walls 09/29/2018 $173,881.21 W: PAX CON

N4008018F5272 B2168 REPLACE CRAC UNIT ROOM 100 09/30/2018 $61,805.68 W: PAX CON

N4008018F5273

B307 - REPLACE WINDOWS, DOORS AND PAINT

ON REAR 09/30/2018 $41,448.06 W: PAX CON

N4008019F4001 B104 - Repair Roof Leak 10/16/2018 $36,469.53 W: PAX CON

N4008019F4033 Provide ADA Entrance at bldg. 2191 11/09/2018 $45,597.75 W: PAX CON

N4008019F4050 B8081 Replace the Tempstar 3 Ton Split A/C System 11/21/2018 $10,690.19 W: PAX CON

N4008019F4053 MQ-25A Equipment Pad 11/21/2018 $65,143.58 W: PAX CON

N4008019F4054

H-306 Add 2 walls and replace carpet for supervisor office spaces inside hangar 11/28/2018 $26,760.71 W: PAX CON

N4008019F4062 B8300 Renovate Room 201 12/20/2018 $19,770.06 W: PAX CON

N4008019F4066 B458 Repair Roof Damaged Area 11/29/2018 $79,184.00 W: PAX CON

N4008019F4067 B2816 IFC MOB Reconfiguration 12/12/2018 $159,209.92 W: PAX CON

N4008019F4113 B103 Repair Berthing area HVAC issues 01/08/2019 $52,785.00 W: PAX CON

N4008019F4174 B505 REPLACE CEILING TILE H84 01/18/2019 $22,563.90 W: PAX CON

N4008019F4207

IPL19, B515 REPLACE HVAC RMS 105, 106, 108

and 109 H84 01/31/2019 $35,819.69 W: PAX CON

N4008019F4255 B6105 - KITCHEN FACILITY REHAB 02/19/2019 $16,658.74 W: PAX CON

N4008019F4263 Bldg 2805 Install Solid Trench Covers 03/20/2019 $39,468.00 W: PAX CON

N4008019F4306 B8081 Repair Exterior 03/13/2019 $52,587.61 W: PAX CON

N4008019F4315 B611 Replace Water Lateral 03/28/2019 $32,425.79 W: PAX CON

N4008019F4341 B1485 Replace 3 Eyewash Stations 03/18/2019 $43,245.44 W: PAX CON

$16,942,816.45