Amendment_0009.pdf

PDF 170 KB Posted

Attached to
P3021 DBB OF HANGAR 21 JOINT BASE ANDREWS CAMP SPRINGS, MARYLAND
Solicitation number
N4008018R0003
Issued by

About this file

Amendment_0009.pdf

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR4929810

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILITARY CONSTRUCTION P3021, DESIGN-BID-BUILD OF HANGAR 21, JOINT BASE ANDREWS, CAMP SPRINGS, MARYLAND

The purpose of this amendment is to provide the follow ing:

1. Response to RFI

2. Revision to FAR Clause 52.216-4-Economic Price Adjustment

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0003

X 9B. DATED (SEE ITEM 11)

04-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Jun-2018

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION

SUMMAR

SECTION

The follow

AMEN

MILITARY

CAMP SPR

The purpos

1. R

2. R

All other te

364. Note ( Clause noted the bid a.

b.

c.

R

SF 30 BLOCK

RY OF CHAN

SF 30 - BLO

wing have been

NDMENT 000

Y CONSTRU

RINGS, MAR

se of this amen

Response to RF Revision to FAR erms and cond

(5) on page 18 e 52.216-4 - E that the Gover d form has not

FAR 52.21

adjustments subcontract clarify if str cold formed other steel a decisions if suppliers un

. FAR 52.21

Please clari

FAR 52.216

under this subcontract significantly

Response: Plea

K 14 CONTIN

NGES

CK 14 CONTI

n added by full

UCTION P302

RYLAND

ndment is to pr

I R Clause 52.21 itions remain u

8 of the Amen Economic Pric rnment intende been revised.

6-4 paragraph s shall be lim tors are waiting ructural steel w d girts / Z - Pu and aluminum f they wish to p ntil the range o 6-4 paragraph fy the supporti 6-4 paragraph clause shall n ting community y more than 10 ase see revised

NUATION PAG

INUATION PA

text:

21, DESIGN-B

rovide the follo

16-4-Economic unchanged.

Res dment 0001 -e Adjustment ed to request ce Please clarify

(a) references mited to unit p g to see if the wide flanges; st urlins; cold for products are i participate in th of this clause is

(a) references ing data requir (c)(4) states " not exceed 10 y regarding re 0%. Please cla

FAR Clause

GE

AGE

BID-BUILD O

owing:

c Price Adjustm ponse to RFI

Phase II - Ins

- Labor and M ertain Unit Pric the following s unit prices sh prices for mate work of their tructural steel H rmed studs; ste included. At th he project as w s clarified.

s supporting d ed.

The aggregate 0 percent of ecent tariffs on arify how these

52.216-4 Econ

OF HANGAR

ment structions to Bi Material applie cing related to hown in the "s erials shown i scope will be

HSS; steel cha eel joists, alum his it is very d well as make pr data required to e of the increas the original u n steel and alum e catastrophic t nomic Price A

R 21, JOINT

idders noted th

ed. At the Pr o this FAR Cla schedule". Pa in the schedul e included in th annels, angles & minum billet, re difficult for sub rocurement arra o explain the c ses in any cont unit price." T minum is that type increases w

Adjustment.

N4008018R

Page

BASE ANDR

he inclusion o rebid meeting ause with the b aragraph (c)(1)

le. Currently his schedule.

& plates; metal ebar, as well as bcontractors to angements wit cause of adjus tract unit price The concern costs could in will be address

R0003

REWS,

f FAR it was id, but

) notes many

Please l deck;

s what o make th their stment.

e made in the ncrease sed.

N4008018R0003

FAR Clause 52.216-4-Economic Price Adjustment

OFFERERS SHALL FILL IN COLUMNS, (1) UNIT COST ASSUMPTION FOR PROPOSAL AND (2)

TOTAL MATERIAL COST ASSUMPTION FOR PROPOSAL IN THIS CLAUSE AND SUBMIT THE

COMPLETED CLAUSE WITH THE PRICE PROPOSAL. PLEASE SEE BELOW FOR DETAIL.

52.216-4 Economic Price Adjustment -- Labor and Material.

The following clause is hereby incorporated into this solicitation and contract. To be able to invoke this clause the contractor must complete the table below and submit it with the proposal. This does not become an element of the price or technical proposal.

Economic Price Adjustment -- Material (Jan 2017)

(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the unit prices for material shown below either increase or decrease. The Contractor shall furnish this notice within one hundred and fifty 150 days of contract award. The notice shall include the Contractor’s proposal for an adjustment in the contract unit prices to be negotiated under paragraph (b) of this clause, and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor’s adjustment proposal.

(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. The Contracting Officer shall modify this contract to include the price adjustment for the following items:

Description:

Estimated Quantity

UOM Unit cost assumption for proposal

Total material cost assumption for proposal

(quantity * unit cost)

Metal panel (total): 271,288 SF $________________ $________________ Horizontal metal wall panels 28,780 SF

4” Insulated Metal Panel System 150,459 SF Aluminum Composite Metal Panel 92,049 SF

Structural steel (total): 5,899 TON $________________ $________________

Hot-rolled steel framing (beams, columns, bracing, trusses, purlins, girts)

4,647

TON

Cold-Formed Steel Purlins 225 TON Cold-formed Steel Girts 155 TON

Misc Steel (Connections, kickers, bent plates, sag rods, etc) 704 TON

Joist, shop fabricated, incl shop primer, bolted cross bridging 118 TON Structural tubing 50 TON

N4008018R0003

Steel reinforcing bar: 4,750 TON $________________ $________________

(c) The Contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.

(d) Any price adjustment under this clause is subject to the following limitations:

(1) Unit prices submitted by the contractor will be adjusted up or down in accordance with the 20-city average cost index based on the Engineering News-Record index changes between the proposal due date and a maximum of one hundred and fifty (150) days after the date of award. There shall be no adjustment for --

(i) Supplies or services for which the production cost is not affected by such changes;

(ii) Changes in rates or unit prices other than those shown in the Schedule; or

(iii) Changes in the quantities of material used from those shown in the Schedule for each item.

(2) No upward adjustment shall apply to supplies or services that are required to be delivered or performed before the effective date of the adjustment, unless the Contractor’s failure to deliver or perform according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause.

(3) There shall be no adjustment for any change in unit prices for material which would not result in a net change of at least 3 (three) percent of the original unit price for the item.

(4) The aggregate of the increases in any contract unit price made under this clause shall not exceed 10 percent of the original unit price. There is no percentage limitation on the amount of decreases that may be made under this clause.

(e) The Contracting Officer may examine the Contractor’s books, records, and other supporting data relevant to the cost of material during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.

(End of Clause)

END OF AMENDMENT 0009

(End of Summary of Changes)

File details come from the government source that posted it.