Amendment_0005.pdf

PDF 192 KB Posted

Attached to
P3021 DBB OF HANGAR 21 JOINT BASE ANDREWS CAMP SPRINGS, MARYLAND
Solicitation number
N4008018R0003
Issued by

About this file

Amendment_0005.pdf

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR4929810

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILITARY CONSTRUCTION P3021, DESIGN-BID-BUILD OF HANGAR 21, JOINT BASE ANDREWS, CAMP SPRINGS, MARYLAND

The purpose of this amendment is to provide the follow ing:

1. Provide updates to draw ings

2. Responses to RFI questions.

3. Extend Proposal due date/time to June 07, 2018 BY 2:00 PM EST

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 29

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0003

X 9B. DATED (SEE ITEM 11)

04-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-May-2018

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION

SUMMAR

SECTION

The follow

AMEN

MILITARY

CAMP SPR

The purpos

1. Provide

2. Respon

3. Extend

All other te

1391122 V 1391122 V 1391122 V 1391122 V

The follow

CE004

CE005

CE111

be sam

CE112

CE113

CE114

keyno

CE121

CE122

CE123

CE124

CE131

CE133

and Se

CE143

CE152

stream

CE164

a 3-da

CE171

CE201

SF 30 BLOCK

RY OF CHAN

SF 30 - BLO

wing have been

NDMENT 000

Y CONSTRU

RINGS, MAR

se of this amen e updates to dra nses to RFI que

Proposal due d erms and cond

Vol 1A Part 2 S Vol 3 ECF Draw Vol 3 ECF Draw Vol 3_ECF Dra wing are summa

4: Added refere 5: Updated Seq 1: Changed Sed me day stabilize 2: Added rock 3: Renumbered 4: Updated gra te for SES J-0.

1: Added infor 2: Added infor 3: Updated Pip 4: Updated gra 1: Added earth 3: Added low p ediment Basin 3: Added pipe 2: Added botto m.

4: Updated not ay dry period. A 1: Added gradi 1: Added sheet

K 14 CONTIN

NGES

CK 14 CONTI

n added by full

UCTION P302

RYLAND

ndment is to pr awings estions.

date/time to Ju itions remain u

Pro

Site Drawings_ wings_Fire Pro wings_Mechni awings_Archite ary of the chan ence to landsca quence of Cons diment Basin # ed with mattin outlet protectio d TSOS #3 to T ading for TSOS rmation for Tem rmation for Tem pe Slope Drain ading and added h dikes to drain point data for S #3. Updated k slope drain at e om elevations f te for construct Added stabilize ing for TGOS # t for plan and p

NUATION PAG

INUATION PA

text:

21, DESIGN-B

rovide the follo une 07, 2018 B unchanged.

ovide updates

_Civil Amendm otection_Amen ical_Amendme ecture_Amend nges:

ape plans and p struction notes #2 low point. A

g. Renumbered on to pipe outf

TSOS #2.

S #1. Extended mporary Swale mporary Swale sizes.

d information f n to TSOS #2.

Sediment Basin keynotes for ear end of earth di for Pipe Outlet tion of ditch to ed construction #4.

profile of Sedim

GE

AGE

BID-BUILD O

owing:

BY 2:00 PM ES

to the followi ment 5 ndment 5 ent 5 dment 5 project specs fo

Added note to r d TSOS #3 to T fall into Sedime d grading for to e #1.

e #10.

for Temporary n #3. Added co rth dikes.

ke into Sedime Sediment Trap state that it mu n entrance at W ment Basin #1.

OF HANGAR

ST

ing drawings for seeding requ remove that de TSOS #2 and c ent Basin #2.

op of dam for S y Swale #12.

onstruction seq ent Basin #3.

ps. Added silt ust be same da Wisconsin Rd.

R 21, JOINT

uirements. Upd emolition of go corrected keyn

Sediment Basin quencing inform fence to banks ay stabilized an

N4008018R

BASE ANDR

dated location olf cart paths ar note.

n #1. Corrected mation for earth s of ephemeral nd performed w

R0003

REWS,

Map.

re to d h dike within

CE202

CE203

CE501

CE502

CE503

CE505

CE506

CE507

CE508

CE509

CE510

CE511

CE512

Stabili A-101 fully r A-371 A-451

FA101

FA501

M-101 M-602 M-805 M-809

168. Regard requir

Sectio rich ep Maint Sectio for hid proper Sectio weldin Sectio be fiel Other with a Sectio

SSPC

Interm Sectio colum Galvan Sectio interm a zinc

2.2.3 a

2: Added sheet 3: Added sheet 1: Updated Roc 2: Updated Sta 3: Updated Gab 5: Updated Filt 6: Updated Ou 7: Updated Sed 8: Updated Sed 9: Updated Sed 0: Updated Com 1: Updated Sto 2: Updated Tem ization Matting -E: The south recessing the fi -E: Partition ty -E: Elevation D

1-E – Annunci 1-E – Annunci 1-E – Thermos 2-E - Additiona 5-E – Updated 9-E - Alarms a ding the surfa ements, we are on 05 12 00 2.7 poxy) or SSPC enance Coating on 05 12 00 2.7 dden to view s r adherence in on 05 12 00 3.

ng or bolting on 05 12 00 3.5 ld primed, and steel specifica a field touch-up on 09 90 00 3.1

SP6 specifies mediate and Top on 09 90 00 3.1 mns, overhead nized Steel, Fl on 09 97 13.27 mediate coat an rich epoxy (re a polyurethane t for plan and p t for plan and p ck Outlet Prote andard Inlet Pro bion Inlet Prot ter Diaphragm utlet Control Str diment Basin d diment Basin d diment Basin d mbination Inle one/Riprap Out mporary Soil S g – Channel Ap wall of Comm ire panels that a ype B2 (8” mtl D4, note was u ator added exit ator added to F stats changed to al electrical inf Sequence of O dded to sequen ace preparation e requesting ad

7.2 specifies th C Paint 29 (sacr g of Metals).

7.2.1 specifies surfaces where all areas).

5 provides dir

5.1 states that s that shop prim ation sections, p.

3.1 Exterior Pa

s MPI 163 (Li pcoat. Also sta

13.2 Interior P

structural mem

at) and to omit

EXTERIOR C

nd topcoat mate equires blasting topcoat.

profile of Sedim profile of Sedim ection table.

otection table.

ection.

and Temporar ructures detail.

detail.

detail.

detail. Updated et Protection tab tlet Sediment T Stabilization M pplication table

m. 316 has incre are located in C l stud partition) updated to read t vestibule 304 Fire Alarm Ris o temperature s formation adde

Operation run c nce of operatio

Resp n and painting dditional clarifi hat steel is to r rificial zinc du surface prepar e an SP3 finish ection for shop steel exposed t med steel is to b such as stairs aint Tables, Di ight Industrial ates to omit pri aint Tables, D mbers and me t primer at shop

COATING OF

erials…The en g and 24 hour c ment Basin #2.

ment Basin #3.

ry Swale tables

Sediment Bas ble.

Trap ST-II tabl Matting – Chann e, and Tempor eased in size fr Corr. 312.

) was added to d “FULLY-RE er Diagram sensors ed for ductless conditions for E ns, Alarms per ponses to RFIs g of interior, e ication:

receive a shop ust primer) exc rations to SSP h may be appli p primer repai o weather or a be touched-up f and miscellan ivision 5: Exter Coating, Exte mer on shop pr ivision 5: Inter etal deck) to r p primed steel.

STEEL STRU

ntire coating sy coat window), s.

sin Spillway tab e.

nel Application rary Stone Outl rom a 3 5/8” stu o the partition s

CESSED FIRE

split systems, Exhaust Fans r sequence add s exterior, and primer in acco cept as modifie

C SP6 (blast t ied. (Paint man irs damaged by areas without H following erec neous metals o rior Metal and erior, Water B rimed metal.

rior Steel/ Ferr receive an MP

UCTURES, 2.2

ystem is to be a

2.2.2 an epoxy ble.

n table, Perman let Control Stru tud to an 8” stu schedule.

E PANELS”.

exhaust fans, a ded to IO Point generally expo ordance with S ed by SSCP PA to a 1 mil prof nufacturers wil y handling, tra

HVAC for cont ction.

only specify a d New Steel tha Based Semi-Gl rous Surfaces PI 133 (Dryfa

2 Coating Syst applied in the f y polyamide in

N4008018R nent Soil ucture table.

ud to accommo and heaters ts List osed structura

SSPC Paint 20 A 1 (Shop, Fiel file), with exce ll require an S ansportation, cu trol of humidit shop painted s at has been blas loss, Gloss Le

(Including stru all, Water bas tem states all p field. 2.2.1 sp ntermediate coa

R0003 odate al steel

0 (zinc ld, and eptions P6 for utting, ty is to system sted to evel 5) uctural ed for primer, ecifies at, and

N4008018R0003

a) Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES. Does this section refer to steel in an exterior space? Or does this refer to the exterior surface of steel shapes?

Response: Specification 09 97 13.27 applies to exterior steel structures such as the entrance canopy, exterior AGE canopy, POL canopies, etc.

b) Are exterior and exposed interior hangar steel surfaces considered to be separate paint systems? If not, what are the extents of interior exposed steel?

Response: Extent of interior exposed steel is all visible steel members inside the exterior skin/envelope of all facilities, including the steel framing inside the hangar doors.

c) Please provide locations of HVAC interior and non-weather exposed surfaces?

Response: Extent of HVAC interior steel is all visible steel members inside the exterior skin/envelope, including steel framing inside the hangar doors.

d) How many paint systems are anticipated for the structural steel and miscellaneous steel, including stairs?

Response: Answer depends upon the Contractor’s means and methods; refer to specifications.

e) Is it the expectation to sand blast the scope in question (a) above and prime coat with a zinc rich epoxy in the field? This would be quite costly, unproductive, and has some unique safety concerns under updated OSHA silicate requirements.

Response: We understand this question to be about the structural steel painting covered by Specification 09 97 13.27. If so, it will be acceptable to shop coat the exterior steel canopies covered by this specification, provided the completed steel structure is coated with the paint system that fully complies with the quality, appearance and performance required by this specification.

f) Cold formed Z & C shapes are coil coated before manufacturing into a specified shape. Please, specify coating requirements for cold formed structural framing.

Response: Cold formed steel members exposed to view inside the exterior skin/envelope of all facilities, including inside the hangar doors, require 09 90 00 3.13.2 paint just as the rest of the structure. An appropriate, spec required, compatible base/primer paint may be applied before manufacturing into a specified shape.

g) We would expect to see one of the following for the purposes of cost and schedule optimization:

i. A one coat direct-to-metal (DTM) universal primer that would be touched up in the field with additional attention paid to steel not hidden to view

ii. A two or three-coat shop applied system that would be touched up in the field with additional attention paid to steel not hidden to view.

iii. A shop applied system that would have the primer/intermediate coats touched up in the field and then the finish coat applied in the field for a uniform finish.

Response: This complex has several different types of facilities which require steel with different coatings depending upon the desired performance of the coating. For example, we note i. is used for interior steel not exposed to view; and we note iii. is used for interior steel that is exposed to view.

169. We received the amendment #0004 yesterday and appreciate the extension. However, because of the Memorial

Day holiday, this only allows us a (3) working day extension. We still have (77) RFI’s outstanding. Numerous subcontractors are still requesting more time to allow them to prepare their bids. We respectfully request an extension to Thursday, June 7.

Response: See Amendment 0005.

171. ENCLOSURE, DIVISION 07-Are there any blast performance requirements for Sections 07 41 13 METAL ROOF PANELS, 07 42 13 METAL WALL PANELS, 07 42 43 ALUMINUM COMPOSITE WALL PANELS, 07 42 63 FABRICATED WALL PANEL ASSEMBLIES, and 08 60 45 TRANSLUCENT FIBERGLASS

WALL PANELS?

Response: The metal panels specified were confirmed during design to comply with UFC 4-010-01.

172. ARCHITECTURAL, A-002-H AND SIM.-Partition types H1, H2 & L1 have 1 3/8" fiberglass reinforced panels. These panels are shown from floor to underside of the deck. Is it necessary to extend the Bullet resistant rating beyond eight or ten feet above the finish floor?

Response: Confirmed. Construct the bullet resistant enclosure as drawn and specified.

174. The mechanical insulation specification requires insulation to be provided for Aboveground Hot Pipe Lines:

Compressed Air Discharge. This piping is generally insulated for Personnel Protection where surface temperatures of the bare piping located near the compressors may exceed 105 degrees F. There is no clear distinction or Label on the drawings identifying the portion of the Compressed Air system as “Compressed Air Discharge”. The operating temperature for this system appears to be near ambient. There is approximately 4,000 lineal feet of aboveground Air piping on this project, most of which is hung at higher elevations.

Question: Is the intent to limit insulation of Aboveground Compressed Air Discharge piping to only that piping required for Personnel Protection (i.e. located below 8 feet AFF)?

Response: Air compressors provided have integral dryers with approximate SAT of 74°F. This temperature does not present a risk of personnel injury or forming condensation on the exterior surface of the pipe. No insulation is required for compressed air piping.

175. For the underground interceptor tank system (P-703-H), the sump has a requirement for two 35 gpm sump pumps. The recycle system can handle up to 30 gpm. If a high float is activated, it appears both pumps operate simultaneously. 70 gpm could potentially flood the equipment room. Shouldn't the operation be one pump or the other, not both pumps in unison on high float? Please confirm one pump is an inactive redundancy.

Response: Confirmed – one pump is redundant.

176. Specification section 22 00 00 states aboveground, sanitary waste and vent may be schedule 80 ABS plastic pipe and fittings. Schedule 80 is not available for ABS. Please confirm schedule 40 ABS pipe and fittings acceptable.

Response: Schedule 40 ABS is acceptable.

177. Specification Section 22 00 00 states aboveground, interior rainwater conductors may be schedule 80 DWV plastic pipe and fittings. Schedule 80 is not available for DWV. Please confirm schedule 40 DWV pipe and fittings are acceptable.

Response: Schedule 40 ABS is acceptable.

178. Reference specification 11 41 11 and drawing QF-102-H. Please indicate the required height for the walk-in coolers and freezers.

Response: Required height is 9'-6".

179. Reference specification 11 41 11 and drawings QF-102-H, EP-407-H. Please indicate whether the condensers for the walk-in coolers and freezers are 1-phase or 3-phase.

Response: Condensers for the walk-in coolers require 3-phase power.

180. Page 18 of specification 11 06 40.13 references walk-in units W1, W1b, W1c, W2, W2b, W2c. Please clarify which units these refer to. Are they meant to refer to the five walk-in units with item numbers 1,4,7,12,15? If so, please clarify which specifications are to be used. The descriptions in 11 06 40.13 are different than the descriptions in 11 41 11. For example, 11 41 11 asks for strip curtains, while 11 06 40.13 asks for polyester reinforced swinging doors.

Response: Use 11 41 11 specifications.

181. Detail A3 on M-502-H states that condensate drain on the natural gas system can be CPVC or Stainless Steel.

There is no specification for this condensate drain clarifying the pipe type, schedule thickness, joint type, etc.

Please provide us with a Specification Section.

Response: CPVC: Pipe and fittings shall be manufactured as a system, be the product of one manufacturer and be manufactured in the United States. All pipe, fittings, and solvent cement shall be supplied together as a system. Pipe and fittings shall conform to the National Sanitation Foundation Standard (NSF) 14. Special drainage systems for corrosive chemical or acid waste shall be manufactured by CPVC Type IV, Grade I, ASTM Cell Class 23447. All system components shall be certified by NSF International for use in chemical waste drainage systems and bear the mark NSF-cw. All system piping shall be Schedule 40 CPVC produced to the dimensional requirements of ASTM F 2618 and the manufacturer’s specifications. All pipe and fittings shall be CPVC drainage patterns meeting the requirements of ASTM F 2618 and the manufacturer’s specifications, as applicable. Stainless Steel:

Tubing – comply with ASTM A 269, Type 316. Fittings – Comply with ASTM A 815/A 815M, Type 316, Grade WP-S. Provide dielectric fittings when joining any two dissimilar pipe materials.

182. Reference detail C4/A-521-F. Confirm that the steel shape across the 8" cold formed stud separating the 2 different wall panel types is not continuous.

Response: Steel member not needed. Provide continuous stud; frame around any opening as required.

183. Reference Note D on A-002-H. Since the DL top track is detailed as slotted and there will be a screwed connection at each stud, can the horizontal spacer bar be eliminated?

Response: Provide the horizontal spacer bar as noted.

184. WH-1 is noted on the Plumbing Equipment Schedule on P-703-H, but no product data was included. Please clarify the basis of design WH-1 or remove WH-1 from the schedule.

Response: WH-I is a Wall Hydrant, Woodford, Model B65, ¾” size, with single check vacuum breaker, flush mounted wall box with hinged door, ¾” male hose thread, and approved under ASSE Standard 1011.

185. FM403-P states the canopy columns are included in Bid Option 3. Please clarify if any of the piping shown on FM403-P should be included in Bid Option 3 or if all piping shown on FM403-P is included in the base.

Response: All fuel piping depicted on sheet FM403-P shall be included in the base bid.

186. Reference specification section 41 50 00.06. The vertical carousels will have a mixture of single tier carriers requiring approximately 17” of usable height, two-level multiple tier 17” useable height carriers split in half equating to about 8” usable height/tier, three-level multiple tier 17” useable height carriers split into thirds which yield about 5” usable height/tier. Despite the variance in useable height among the tiered carrier configurations, it appears all carriers regardless of the number of tiers per carrier require a minimum of 250lbs minimum per tier.

This 250lbs minimum seems excessive and inconsistent; three-level tier carriers usually handle low profile and lighter weight inventory; two-level tier carriers store medium sized and weight inventory, versus single tier carriers that usually accommodate larger and heavier inventory. For example, there would be a cost savings if the two-level and three-level tier carriers only required a minimum of 200lbs/tier and more savings at 150lbs/tier. Therefore, please clarify the minimum weight capacity needed per tier, and if 200lbs/tier and/or 150lbs/tier would be acceptable for the two-level and three-level tier carriers.

Response: Each tier shall have a capacity of 250 pounds as specified.

187. Drawing S-022-H shows a layout diagram for Tripod Jacks, Axle Jacks, and Vertical Nose Gear. Please confirm this diagram is for structural loading purposes only and we are not to include any jack equipment.

Response: Confirmed.

188. The perennials, Groundcovers, and Grasses located on L-301 are specified at 3-gallon containers. Typically, these plants are specified at a one-gallon size. Please confirm the desire to have 3-gallon sizing on these plants.

Response: One-gallon containers are acceptable in lieu of 3-gallon containers for this material. The total required gallons shall remain the same.

189. The mitigation plant schedule on LD501 shows evergreen trees to have a 1-1/2" caliper size. Evergreen trees are typically not specified via caliper size. Please provide the heights of these trees.

Response: Evergreen trees as shown on Mitigation Plant Schedule shall be min. 6-7’ height.

190. The site tree schedule on L-300 shows the Serviceberry and White Fringe Tree being specified having both a three-stem minimum and a 2-1/2" caliper size. Please indicate if all three stems must be 2-1/2" caliper and provide the desired height of these trees.

Response: For multi-stemmed trees, the caliper shown is equal to one-half of the total calipers of the three largest trunks per the American Standards for Nursery Stock.

191. Specification section 03 30 00 - 3.9.1.7 describes polished concrete at "Use on slabs in Rooms Q12 COMBS Warehouse and V22 Conditioned Warehouse." However, the finish schedule does not indicate polished concrete at the V22 Conditioned Warehouse. Please confirm polished concrete should be provided at Room V22 per the specifications.

Response: Confirmed. Provide polished concrete per the specifications.

192. Specification Section 23 64 26 - 2.14.1 states drain and make-up water piping is specified in Section 22 00 00;

however, this information is missing from Table 1 in Specification Section 22 00 00 as it relates to cold condensate drains or flue vent condensate drains. Please provide an updated table with the specified pipe material, thickness, joint types, etc.

Response: Cold condensate drain shall be copper drainage tube (DWV), ASTM B306, with wrought-copper fittings and solder joints, ASME B16.22. Make-up water piping shall be installed according to Service A shown in Table II upstream of the RPZBP, and the same material as the associated hydronic system downstream of the RPZBP. Boiler flue vent condensate drains shall be stainless steel, as shown on M-604-H. Refer to RFI 181 for required stainless steel piping specification.

193. Table I in Specification Section 22 00 00 - 3.12 calls for Industrial Waste Pipe to be high-silicon cast iron pipe.

The manufacturer of this pipe is no longer in business. We suggest using Schedule 80 PVC pipe for 8" and larger and for pipe 6" and small we suggest polypropylene. Please confirm our suggestions are acceptable for the IW systems in lieu of the specified high-silicon cast iron pipe.

Response: Provide Schedule 80 PVC pipe (ASTM D 1784) and fittings (ASTM D 2467) for all sizes of Industrial Waste unless previously noted otherwise, e.g. wash bay double contain piping, etc.”

194. FM003-P as well as Detail A1 on FM510-P show the new transfer line tapping into the existing 8" CC. This tee creates a potential leak point. The notations on FM003-P show this to be an underground tap. Please confirm the tap should be located in a large pit which may include the New Transfer Isolation Valve Pit. If this tap occurs in a pit, please clarify if a sump pump is needed to pump fuel out in the event of a leak as well as any electrical requirements this pump may have.

Response: The new transfer line tie-in point shall be a buried, welded tee as shown on the drawings and not located in a fuel pit. The welded connections shall be installed and tested in accordance with UFGS 33 52 43.13 Aviation Fuel Piping. The new transfer isolation valve pit shall be installed with a manual pump out connection as shown in details C3/FM510-P and C1/FM510-P.

195. On Drawing EA001 in Volume 1B the Legend contains the symbol for Light Base with Blank Cover. Please clarify whether this symbol applies.

Response: Yes, this symbol applies. An example of one is on Sheet EA102 located in drawing zone 4D between Taxiway 'W5T' and Taxiway 'W'.

196. On Drawing EA001 in Volume 1B the Legend contains the Symbol “P” New Pull Can, however the "P" symbol does not seem to appear on any of the Volume 1B EA drawings. Please clarify whether this symbol applies.

Response: Yes, this symbol applies. An example of one is on Sheet EA305 located in drawing zone 4B with a detail call-out to A3/EA502 pointing to it.

197. On Drawing EA607 in Volume 1B, Detail C2 calls for an L-868 12” Dia. Deep Base. Typically, this application requires an L-867 12” Dia. Deep Base. Please confirm whether the L-868 is correct.

Response: See RFI #84 response.

198. Specification Section 21 30 00 - 1.7.1 states the Fire Protection Specialist can be NICET Level IV, but 01 45

00.00 20 - 1.5.8 states it must be a registered PE. Please confirm a registered PE is required for this Project.

Response: Response: The Registered Fire Protection Engineer (FPE) identified in Section 01 45 00.00 20, paragraph 1.5.8 is a member of the Contractor’s Quality Control (CQC) Team and shall be the same person as the Fire Protection Specialist defined in 21 13 13.00 10. Please refer to the response to RFI

127. In addition to the duties of 01 45 00.00 20, this FPE shall perform the construction phase duties of the QFPE identified in UFC 4-211-01, paragraph 3-6.20.1, and those of the CQC FPE identified in the Preliminary Acceptance Test (PAT) and Final Acceptance Test (FAT) Check List following Spec Section 21 13 20.00 20.

The Fire Protection Specialist identified in Section 21 13 13.00 10 (and Divisions 21, 28 and 33) is defined as an engineer in Paragraph 1.4.1, with additional qualifications. A NICET technician that is not an engineer is not acceptable as the Fire Protection Specialist.

Note: Revise the requirements for Fire Protection Specialist in Section 21 30 00, 21 13 22, 21 05 33 and 33 16 15 to provide the same Fire Protection Specialist with qualifications and duties as identified and submitted in Section 21 13 13.00 10. The Fire Protection Specialist shall approve all submittals and certify the installation meets the requirements of the Contract Documents and referenced criteria for all Division 21 sections, plus 28 31 76, 33 11 00 and 33 16 15. All submittals shall be submitted for review to the Authorities Having Jurisdiction (the AFCEC FPE and the NAVFAC Washington FPE), both electronic and a full size paper copy. All submittal items shall be identified as “G”, such that they are forwarded for review and included on the Submittal Register.

Note: Revise 21 30 00 Paragraph 2.2 FIRE PUMP. Replace “rated net pressure of 204 psi” with “rated net pressure of 210 psi”.

199. S-103-P shows a retaining wall under the canopy which can be interpreted as a vault for the fuel tanks. S-310-P shows sections for under the canopy compared to beyond the canopy. Detail C1 on S-901-P shows a tank vault for the product recovery tank. Please confirm a vault is not required around the two 70,000 fuel tanks.

Response: Detail C1 on S-901-P does not apply to the two 70,000 gallon fuel tanks. Refer to S-310-P for 70,000 gallon tanks.

200. The mechanical drawings in Volume 7D make references to expansion joints as well as Specification Sections 23 52 00 - 2.12.12.1 and 23 64 26 - 2.5.8.1. Please provide an "Expansion Joint Schedule" that includes the required traverse, data to help calculate the system expansions, and any other special requirements.

Response: Refer to existing information listed in the referenced specification sections and shown on sheets M-601-H thru M-611-H.

201. Specification Section 33 08 55 - 2.2 - g states the Contractor shall provide Pig launching and receiving barrels;

however, the section is for the generator and boiler while the Pig Launcher and Receiver is for the Aviation Fuel system. Part 3 of the Section makes references to executing Pig commissioning. Please confirm the Pig launching and receiving barrels are not required to commission the generators and boiler.

Response: Specification as written is correct. Boiler and generator fuel oil systems have been designed to be piggable in accordance with UFC 3-460-01. Contractor shall provide pig launching and receiving barrels.

202. 1.1 of specification 08 60 45 indicates the translucent fiberglass wall panel system must meet requirements of UFC 4-010-01. To meet the requirement, please provide Standoff Distance and Blast Weight or Blast Pressure and Impulse. The Frame Blast Loads indicated in 2.5.l.1 is for glazing and does not apply the translucent wall panels which Components and Cladding. Please provide this information.

Response: See RFIs #82 and #89 responses.

203. Section 08 60 45 - 2.5.j. indicates the exposed aluminum color is in Section 09 06 00. Section 08 60 45 - 2.5.j also indicates a clear anodized finish. Section 09 06 00, paragraph 2.2.1.9.1 calls for color to match "ALPOLIC"

- MTLC CMX Silver. Is a custom (matching MTLC CMC Silver) or standard color Corrosion Resistant Finish with Fluoropolymer Resins meeting the requirements of AAMA 2604 acceptable?

Response: See RFI #88 response.

204. Drawing F-101-Z Sheet Key Notes: #7 indicates an in-line foam inductor, #8 references Foam/Water Dry Pipe Sprinkler Riser, #9 references a 200-gallon vertical double walled atmospheric storage tank. Drawing F-501-Z Sheet Key Notes: #2 references Dry Pipe Valve Assembly with Pressure Switches, #11 references foam proportioner, (which is shown prior to the dry valve). Specification Section 21 13 22.00 20 - 1.2.1 calls for a closed head dry-pipe pre-action system; - 2.5 calls for a Mil Spec foam concentrate; - 2.6.1 calls for a concentrate ratio; and - 2.7.1 calls for an atmospheric storage tank. The information for this HazMat storage facility contradicts itself. Please clarify if a deluge system with a foam inductor and atmospheric storage tank is required in the HazMat storage building or if a dry-pipe system is required in the HazMat storage building or if a pre-action system with ratio flow controller and bladder tank is required in the HazMat storage building. If a foam system is required, please clarify if it is Mil Spec foam or alcohol resistant foam for the HazMat storage facility.

Response: A dry-pipe, foam system is required for the HazMat building. The system will utilize an in-line foam inductor (proportioner) provided in accordance with NFPA 16, and UFC requirements and manufacturers specifications. The system will be provided with 3%, Mil-Spec, AFFF from a 200 gal. (160 gal minimum of foam concentrate) atmospheric foam tank in accordance with UFC 3-600-01 requirements, and as shown on design drawings.

205. At wall section A4/A-306-H it calls for 4" Fabricated wall panels backed up with 12” 16GA metal framing.

However, on detail A1/A-306-H & A2, A3, A5/A-308-H there is 4" Fabricated wall panels but no metal framing mentioned. Please advise as to whether 12” 16GA metal framing should be applied at these locations as well?

Response: Delete the notation to provide the 16 Ga. - 12” CFF on Wall Section A4 / A-306-H and A4 / A- 307-H. The note should read: 4” FABRICATED WALL PANEL (FWP1).

206. At wall Section A4/A-307-H it calls for 12” 16GA Metal Framing on the wall @Grid line Y.7 but no info for the wall @Grid line X.4. Please clarify if the wall along X.4 also needs metal framing.

Response: No 12” 16 GA metal framing is required in either location. The structural steel provide supports for the 4” fabricated wall panels.

207. Please confirm that there is no metal framing needed at the Prefinished Metal Coping per the top of details A3 and A5 on sheet A-308-H.

Response: Approximately 2’-6” or less 6” - 16 GA CFMF studs are required from the steel deck up to the underside of the parapet steel tube HSS6x6x5/16. This framing will occur on Grids 1 & 13 between Grids M and N. The roof side of the parapet framing shall be covered with 16 GA sheet metal and covered with the specified PVC roof membrane including horizontal termination bars up to the parapet cap. Delete the note “PREFIN METAL COPING” and replace with “INTEGRAL ALUMINUM COMPOSITE PANEL PARAPET CAP”. A detail will added.

208. On sheet A-504, detail C1 there is hanger parapet framing that has a blow-up detail directing you to detail D3/A-502-H. This detail calls for 16GA Sheet Metal along both sides of the metal stud framing, but it is not indicated in the C1/A-504-H detail. Please advise as to whether the C1/A504-H detail also needs 16GA Sheet Metal Backing.

Response: Confirmed. The referenced detail D3 / A-502-H SIM OH indicates the 16 GA sheet metal shall be provided at detail C1 / A-504-H.

209. Please confirm that there is no cold formed metal framing needed to support the AWCP1 panel shown on detail C2/A504-H at the hangar door soffit.

Response: Confirmed. The 4” Fabricated Backup Panels (FBP1) are adequately secured to the steel structure above and are the support system for the 1” furring zee channels and the AWCP1 panels

210. Please provide details of the exterior wall returns at the hangar door jambs.

Response: Refer to all of sheet A-417-H and detail C3 / A-511-H.

211. Reference CE note #29. Please provide details of Cable net cover over basin.

Response: See attached (RFI 211 Attachment) for Base product spec for cable net cover over the basin.

212. Detail C5 on S-010-H indicates #5 DBA welded to bent plate at typ. slab edge at second floor Area Q. At contractor’s option, please confirm it would be acceptable to use weldable couplers at this detail. This would alleviate shipping concerns and tripping hazards.

Response: It is acceptable to use weldable couplers.

213. Please advise if CAD files can be made available of the civil grading plans (CG100 to CG119).

Response: No.

214. STRUCTURAL, A116-H AREA Q-Partition types H1, H2, & L1 will weigh 396 lbs/lf. Should there include a thickened slab at these locations?

Response: No, the structural slab was designed for the wall loads.

215. TECHNICAL CONTENT, PAGE 5 OF AMENDMENT 001.- There is a requirement to furnish a “Proposed Modification/Change Order Percentage Rates” form in the price binder. It is atypical for the Offeror to establish a modification change order / percentage rate markup value at time of proposal through inclusion in the price binder, and no forms or directions have been included in the solicitation to clarify what is required to satisfy this Percentile Rate requirement. Please confirm the "Proposed Modification / Change Order Percentage Rates" can be removed from the price binder requirements or provide clarity on what Offerors must include to satisfy this requirement.

Response: Proposed Modification / Change Order Percentage Rates is hereby removed.

217. FF&E, FF&E PACKAGE- Is the Audio-visual equipment shown as Bid option 6 on Q-601-H part of CLIN 9 or part of CLIN 7?

Response: A/V is Bid Option No. 6 (CLIN 0007) as noted in the contract documents (bid/price schedule and Q-601-H). Refer to bid schedule for additional information about this item.

218. FF&E, FF&E PACKAGE-Is warehouse equipment shown as bid Option 4 on Q-601-H part of CLIN 9 or part of CLIN5?

Response: Warehouse/Storage equipment is Bid Option No. 4 (CLIN 0005) as noted in the contract documents (bid/price schedule and Q-601-H). Refer to bid schedule for additional information about this item.

219. FF&E, FF&E PACKAGE-If Warehouse equipment and Audio-Visual Systems are part of CLIN 5 & CLIN 7

- will this be a separate funding for procurement process as stated in specification 01 30 00?

Response: No. Please place the cost of each item in the appropriate category, and the Government will fund it from the correct funding source.

220. FF&E, FF&E PACKAGE-If the Warehouse equipment and Audio-Visual Systems are being procured by the process noted in 01 30 00 (FF&E), how will the pricing be adjusted since these CLINS on the bid form are not listed as an allowance?

Response: N/A – See RFI # 219 response.

221. FF&E/ELECTRICAL, EP114-H-Note A on EP114-H states "systems furniture is included in bid option #8.

Conduit wiring, wall mounted junction boxes and floor boxes are in the base bid. If bid option8 is awarded, the contractor will make all electrical connections between the furniture and j-boxes/floor boxes." Is it safe to assume the electrical connections between the furniture and j-boxes/floor boxes pricing is part of the ff&e allowance CLIN 9? If no - how do we show the cost for this work on the bid form should the Option 8 not be accepted?

Response: Note on Sheet EP114-H is correct as stated; the Base Bid scope is terminated at the boxes. If the FF&E is not awarded then there is not any additional work to be performed, so there should not be a cost incurred for making electrical connections to the FF&E.

222. CIVIL, CE170-Drawing CE170 shows an area 75, but drawing CE175 does not exist. Please advise.

Response: Area CE175 was removed from the CE Series documents. Drawings will be revised to remove CE175 from CE170 and from key maps.

224. CIVIL, CD100-CD119-It was our understanding from the pre-bid meeting that the trees were being removed by a separate contract and not part of the scope of this work. Drawings CD100-CD119 show the removal of trees. Please confirm that trees are being removed by others.

Response: The trees shown on the documents represent the remaining tree stumps from the tree clearing performed by others. Refer to keynote 1 on the CD Series sheets and General Sheet Note D on sheet VF002 and VF003. The contractor is responsible for removing the remaining tree stumps.

225. CIVIL, LD101-Notes 2 and 3 on drawing LD101 call for tree replacement and drawings LD101 through

LD501 describe the scope of the replacement. With reference to the previous question, please confirm that since this contract does not remove the tree this contract also does not replace tree.

Response: All tree replacement shown on the LD Series sheets is included within the contractor’s scope of work.

226. AIR BARRIER, A-0AB1-H-Are common walls between envelopes required to receive poly or batt insulation?

Response: Refer to sheets A-002-H and A-003-H for wall construction requirements.

227. AIR BARRIER, A-0AB1-H-What type of Air Barrier is required at Envelope 10?

Response: An Air Barrier can be an individual material or an assembly of materials. The materials or assemblies comply when all joints are sealed per specification sections 07 05 23 and 07 27 10.00 10. Also, please refer to and comply with ASHRAE 189.1 Normative Appendix B.

228. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Per paragraph 1.4c The overhead electrification system, motors, etc. that are located 50 feet above the hangar floor and never located within 5 feet of the aircraft are not required to be Class I Division 2 rated. Please confirm that only the TPS components at the platform level are required to be Class I Division 2 and that all other components that are in accordance with paragraph 1.4c can be non-rated.

Response: See RFI #133 response.

229. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Per paragraph 2.16.l enclosures for brake electrical components shall be rated for Class I Division 2 locations. Please confirm that since these components will be on the carrier bridge and in accordance with paragraph 1.4c that they are not required to be Class I Division 2 rated.

Response: If a TPS item is not within the specified zone for Class I Division 2, then it does not need to be Class I Division 2.

230. TELESCOPING PLATFORM SYSTEMS (TPS), 145000- Paragraph 2.18.h requires that limit switches are Class I Division 2 rated. Please confirm that all limit switches outside of the area defined by paragraph 1.4c do not need to be rated.

Response: See RFI #125 response.

231. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Paragraph 2.18.i requires that control panels are Class I Division 2 rated. Please confirm that all control panels that fall outside of the area defined by paragraph1.4.c do not need to be rated.

Response: See RFI #126 response.

232. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Under points 1.4.k and 2.17.2, it mentions that the TPS shall include 8 electrical outlets, but in point 2.16, it only mentions four (4) 120V and two (2) 208V. Please clarify.

Response: See RFI #114 response.

233. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Under point 2.9.a, it mentions the max capacity of the TPS shall be 3,000 lbs. AMOVA, the specified basis of design states that a 3,000 lbs capacity platform is not available. Please confirm that the AMOVA 1,650 lbs capacity platform is acceptable.

Response: Refer to response to RFI #143.

234. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Point 2.12 mentions that each TPS shall include 14 fall arrest points, 7 above the platform and 7 below. The design of AMOVA's platform will not permit attachment points underneath of the platform. The AMOVA design provides for seven attachment points to the mast allowing operators to work both on or outside of the platform.

Response: See RFI #137 response.

235. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Please confirm that the European equivalents of the requirements for the structural fasteners and welding listed in 2.15 are acceptable.

Response: See RFI #123 response.

236. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Paragraph 2.9.c states that the Creep lifting/lowering speed is to 24 inches per minute. AMOVA states that for technical reasons in their design that the creep lifting/lowering speed will need to be 36 inches per minute.

Response: See RFI #131 response.

237. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Paragraph 2.9.d states that the main lifting/lowering speed and cross travel speed listed is required for safety/egress requirements from the platform.

Please clarify the meaning of this requirement.

Response: See RFI #145 response.

238. TELESCOPING PLATFORM SYSTEMS (TPS), 145000-Paragraph 2.9.e states that during an emergency stop the platform shall not sway more than +/- six inches laterally. The sway may not be limited to 6" but will still grant the safety of the operators and will be shown by structural calculations.

Response: See RFI #146 response.

239. VAPOR BARRIER, A-521-Z/A3, A4-Is a vapor barrier required at the outside of the concrete footer? Is the visqueen required to be installed on the inside of the footer?

Response: Provide waterproofing per spec 07 13 53 and as shown on drawings. Provide vapor retarder per spec 03 30 00 and as shown on drawings.

240. ESCORTS, GC001-Drawing GC001 note 6.B.3 paragraph 3 states "when working inside the airfield perimeter fence, the contractor shall be responsible for obtaining prior approval from airfield management and use base provided escorts". The same drawing paragraph 6.B.6 states "flight line escorting - all work within the flight line shall be completed during taxiway whiskeys closure. flight line escorts shall provide airfield escorting of construction vehicles to and from the construction site." Please clarify if the contractor is to provide and pay for escorts, if the owner is to provide and pay for escorts or if the owner will provide escorts and the contractor shall pay for this service?

Response: The contractor shall follow 01 17 00 Contractor Self-Escort Requirements which requires the contractor to provide qualified and trained escorts; therefore, the contractor will be paying for the escort.

241. FINISHES, A-601-H-Room Finish Note #2 references details D2 and C1 on A423-H for information pertaining to the typical wall tile scope for restroom walls not drawn. D2 and C1 do not exist on A423- H. Please verify the remaining walls not elevated are also to receive the ceramic tile wainscot.

Response: Room Finish Note #2 on A-601-H will be revised to reference C1/A-424-H which is the tile wainscot.

242. FINISHES, A-427-H-Some of the elevations show a 6’0” wainscot with a cut tile course on the top row. Others show a 6’4” elevation with a full tile size tile on the top row. Please clarify the wainscot height required.

Response: Wainscot height is 6’-4”.

243. FINISHES, A-420-H-In the multiple person restrooms/locker rooms, most walls that are not sink walls are shown to receive a tile wainscot. A few elevations show full height tile instead. (ex. A-420-H, A-421-H, A-424- H) Please confirm these few walls are non-typical and do receive wall tile full height. If so, at what height is the wall tile on the adjoining walls in these same room?

Response: In restrooms, wall tile at sink wall is full height. All other walls in the restroom are to have a tile wainscot to 6’-4” AFF with the exception of H13 TOILET is to have a 6’-0” high wainscot per elevation C3/A-429-H.

244. FINISHES, A-429-H-Restroom H13 is the only restroom shown not receiving the wall tile accent bands.

Please confirm.

245. FINISHES, 93010-Is a Schluter Schiene edging strip to be used at the top of the restroom wall tile wainscot or is the tile edge a suitable finish?

Response: Provide Schluter Schiene or equal transition at wainscot top.

246. SECURITY, GC101-Drawing GC101 note E States Contractor access points shall be manned by contractor at all times per specification 01 40 00 JBA Work Restrictions. Please clarify if this note should refer to specification 01 14 00? If yes - please clarify, will only the main entrance gate require a manned booth when the gate is open? or will the second emergency access point require a manned booth?

Response: The note will be revised to refer to specification 01 14 00.

247. ACCESS/TIMING, GC101-Drawing GC 101 Phase 1 construction notes state "construction safety phasing plan one consists of establishing the construction security fence line and construction free zone along with the entry control point to the construction site and the staging area site work shall begin upon the notice to proceed and be focused on excavation and fill of the hangar pad and perimeter working area and associated surcharge program." Note 27 & 28 indicated no construction may occur within the arc. Please clarify how the contractor upon notice to proceed can install a secure perimeter to begin construction prior to the JADOC satellite relocation, since the fence and entrance gate are within the arc?

Response: The government will provide a waiver for working within the JADOC Satellite Site Arcs.

248. ACCESS/TIMING, GC101-Drawing GC 101 Phase 1 construction notes state "construction safety phasing plan one consists of establishing the construction security fence line and construction free zone along with the entry control point to the construction site and the staging area site work shall begin upon the notice to proceed and be focused on excavation and fill of the hangar pad and perimeter working area and associated surcharge program." The hatching legend states "staging/batch plant area (staging and batch plant area must remain outside of PTRD arc and IBO arc unless waiver is acquired)". since the batch plant and staging is drawn within the arc - is it safe to assume the contractor will be provided the waiver?

Response: The government will provide a waiver for working within the JADOC Satellite Site Arcs.

249. ACCESS/TIMING, GC101-Note 26 on drawing GC101 states "JADOC satellite site and infrastructure to remain until JADOC satellite site has been relocated by others. Coordinate with contracting officer prior to demolishing JADOC satellite site and supporting infrastructure” Please confirm that the JADOC satellite site will be relocated prior to the contractor notice to proceed? if this is not confirmed, please clarify how the contractor may start work without installing the fence that falls within the arcs to secure the site?

Response: JADOC Satellite Site is noted to be completed by October 16, 2019 in specification section 01 14 00.

250. CYBER SECURITY, CNSS 1253- Reference CNS1253 Security Controls Assessment Procedures. Please confirm that the information included in document relates to the standards for systems design by the A/E and do not constitute additional security scope to be installed by the contractor.

Response: Confirmed. CNSS 1253 Security Controls Assessment Procedures is the master file from which the Designer Contractor Responsibility eMASS document is derived. CNSS 1235 Security Controls Assessment Procedures are associated with the level C-I-A determination for the ICS based on Mission Critical, Mission Essential or Mission Support. Refer to response to RFI #251.

251. CYBER SECURITY, ATTACHMNET 16-Reference Attachment 16: Designer Contractor Responsibility EMASS Document. The document references the assignment of responsibility to the designer/contractor.

However, the color coding systems on the CIA tabs reference designer in blue and yellow and there appears to be no color designation for the contractor.