Amendment_0007.pdf

PDF 347 KB Posted

Attached to
P3021 DBB OF HANGAR 21 JOINT BASE ANDREWS CAMP SPRINGS, MARYLAND
Solicitation number
N4008018R0003
Issued by

About this file

Amendment_0007.pdf

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR4929810

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILITARY CONSTRUCTION P3021, DESIGN-BID-BUILD OF HANGAR 21, JOINT BASE ANDREWS, CAMP SPRINGS, MARYLAND

The purpose of this amendment is to provide the follow ing:

1.Provide responses to RFIs 2.Provide Price Schedule-Revision 3 3.Update to Wage Determinations

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 33

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0003

X 9B. DATED (SEE ITEM 11)

04-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-May-2018

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION

SUMMAR

SECTION

The follow

AMEN

MILITARY

CAMP SPR

The purpos

1. Provid

2. Provid

3. Updat

All other te

46. Electri as new condu should Impac

Respo the m

(PM12

to onl Pump been encou

78. The am will lik

111. Refere drawin

Respo the im produ propr Freed inform

SF 30 BLOCK

RY OF CHAN

SF 30 - BLO

wing have been

NDMENT 000

Y CONSTRU

RINGS, MAR

se of this amen de responses to de Price Schedu te to Wage Det erms and cond ical site plans w ductbanks in uctors / ductba d be addressed cted Soils?

onse: Electrica manholes along

23) along Virg ly contain wat ping water fro added to th untered.

mount of $123 kely increase th onse: Yes, $12 ence 14 50 00 ngs for the TPS onse: The sub mportance of uct details to rietary inform dom of Inform mation, the ow

K 14 CONTIN

NGES

CK 14 CONTI

n added by full

UCTION P302

RYLAND

ndment is to pr o RFIs ule-Revision 3 terminations itions remain u indicate new c n certain areas anks. Please cl

d. Could an al al manholes w g the feeder ginia Avenue ter. No officia m manholes t e price sched

3,450 per day he perceived ri

23,450 per cale

0 Paragraph 1 S due to intelle mittals indica f maintaining allow proper mation. While t mation Act (FO wner of that in

NUATION PAG

INUATION PA

text:

21, DESIGN-B

rovide the follo unchanged.

Provid conductors to b . Existing ma larify how con llowance with were filled wit routes were p did contain a al testing or s to complete wo dule in case for liquidated isk of this proj endar day is c

.3: Would it ectual property ated in the spe g intellectual r technical re there is no abs OIA) request, nformation wo

GE

AGE

BID-BUILD O

owing:

de Responses t be installed wit anholes will lik ntaminated wa unit pricing b th water durin pumped out t “sewage” odo ampling of th ork shall be p contaminate damages seem ect and could i correct.

be possible t ecifications wi property rig eview. NAVFA solute guaran if this situati ould be given

OF HANGAR

to RFIs thin spare cond kely need to b ater, if encount be provided si ng field inves to observe th or, but the rem he water withi performed by d water whi ms excessive.

increase the co to limit shop ill be required ghts, shop dr AC does not ntee that mate ion occurs, pr the opportuni

R 21, JOINT

duits in existin be emptied of ntered in duct imilar to Optio tigations. A l he existing du maining manh in the manho the contractor ich requires

Is this amount ontractors’ pric drawings to l

d. While NAV rawings must anticipate th rials will not b rior to any rel ity to provide

N4008018R

BASE ANDR

ng ductbanks, a water to insta banks or elsew on #9 for Petr large percent ucts. One ma holes were obs oles was perfo

r. A bid optio special dispo t correct? If s cing.

ayout and ass

VFAC unders provide suff he public rele be released un lease of propr e evidence as t

R0003

REWS,

as well ll new where, roleum age of anhole served ormed.

on has osal is so, this sembly stands ficient ase of nder a rietary to why

N4008018R0003 that information should not be releasable per DHS FOIA Exemptions, reference https://www.dhs.gov/foia-exemptions.

216. FF&E, FF&E PACKAGE-The Comprehensive Interior Design FF&E Package Electronic Bid Solicitation set of documents drawing Q-601-H Indicates Warehouse Equipment Schedule - Bid Option 4; Audio Visual Equipment Schedule - Bid Option 6; FF&E Equipment Schedule - Bid Option 8 and FF&E O&M Schedule - Bid Option 8. Drawing Q-100-H note B states refer to specification section 01 30 00 for contractor’s scope of work regarding FF&E. Specification 01 30 00 paragraph 1.13.2 states "The government will provide separate funding for procurement and installation of the FF&E package. Construction funds will not be used. Upon receipt of required funding, the prime contractor shall be authorized by the contracting officer, as a planned modification to the construction contract, to procure and install all final FF&E using federal government price schedules. CLIN 9 (Option 8) appears to be the only CLIN for the FF&E. Please confirm all work noted on the comprehensive interior design FF&E package is part of CLIN 9 (option 8) even though other CLIN's are mentioned on Q-601-H?

Response: No, assumption is incorrect. The Bid/Price Schedule, Drawings and Specs identify which items are covered under which CLIN. It is important to place the costs of each item in the correct category so that independent funding sources may cover the costs of various item categories.

223. CONTRACTUAL, PAGE 41 OF 58 OF SOLICITATION -At $123,450/day the liquidated damages are a significant risk factor on this project. In addition to its being a major underwriting issue for the Offerors, many subcontractors and small businesses are expressing concern, and may not bid the project with potential exposure to damages at this level. This value is much higher than we typically see on projects of similar mission critical importance. The high value could also potentially become a factor in the relationship between all parties to the contract and distract from the mission of completing on time. Please consider reducing this amount to 10% of the current value.

Response: See RFI # 78 response.

258. CIVIL, CU126- Plan sheet CU 126, note 76 calls for a short jack and bore under an existing pump station driveway, however profile on sheet CU204 does not show the boring. Is the boring necessary or can the driveway be open cut and repaired?

Response: Open cutting is acceptable.

300. Please advise if excess top soil can be exchanged with onsite fill within a designated area. This could prevent importing additional fill material for surcharge requirements.

Response: Top soil material can be spoiled within the borrow pit areas located on sheets CE171 and CE172 or in non-structural locations within the project limits of disturbance. Material shall be compacted in accordance with the specifications.

358. Article 1.5e in Section 31 23 00 indicates " Borrow material, suitable backfill and bedding material in the quantities required is not available on Government property. CLIN 0013 - Option #12 Additional Off-Base Fill Material provides for unit pricing to haul additional fill material from outside of the Joint Base Andrews installation in lieu of using excess fill material from the Taxiway Whiskey Project. Please clarify the following:

a. Please clarify the excess fill material from Taxiway Whiskey Project reference in CLIN 0013 is the material in the borrow areas referenced by Note 22 on Drawings GC100.

Response: The borrow areas on Note 22 on Drawing GC100 do not relate to the CLIN 0013- Option #12. Option #12 states “Haul additional fill material from outside of the Joint Base

Andrews installation in lieu of using excess fill material from the Taxiway Whiskey Project.” The fill material in the base bid would come from the adjacent Taxiway Whiskey Project, and the option is to acquire this material from an off installation borrow pit not provided by the government.

b. Please verify that it is the Government's intent to pay for additional fill required beyond that available from the onsite borrow areas identified by Note 22 on Drawing GC100 which must be brought in from outside of Joint Base Andrews utilizing the Unit Pricing identified in CLIN 0013 in addition to the Lump Sum price in CLIN 0001.

Response: The intent is for the Government to pay the difference in cost for the hauling in material off of JBA installation property fill per the quantity provided in the bid option if the quantity of material is not provided from the concurrent Taxiway Whiskey project by others.

c. Attachment 30 of the RFP provided information on JADOC Borrow Pits labeled Stockpiles 1, 2, and 3.

Only two borrow areas are identified on drawing GC100. Please clarify if Stockpile 3 identified on the Attachment 30 is available for use on the Hanger 21 Project.

Response: Stockpile 1 and 3 from the JADOC borrow pits are indicated on sheet CE171, and are for use on this project. Stockpile 2 from the JADOC borrow pits attachment is not available for use and is not illustrated on the Hangar 21 documents as a borrow pit. Contractor would be responsible for complying with the permitted JADOC borrow pit documents for stockpile 1 and 3.

365. Per COMAR all new UST sites in Maryland shall have double walled piping, including Federal property.

Currently, Stainless Steel single walled welded pipe is indicated in the specifications for this Project (and restated in RFI #101). This doesn't meet the double walled piping requirement. Even with the directional boring casing, it doesn't meet the double walled requirements. We believe 40 CFR 280.252 allows for single walled piping for field constructed tanks over 50,000 gallons; however, these are pre-manufactured aviation fuel tanks.

Please specify Maryland (COMAR) approved piping for this project. This site shall also require sumps throughout the piping and fall back to the tank or a sump monitored with sump sensors. Based on the composite and size of the piping we suggest Perma- Pipe or equal. This manufacture can provide double walled stainless-steel piping coated with fiberglass on the secondary. This option is pre-engineered piping and we request more time to provide accurate pipe pricing.

Response: Refer to response to RFI #101.

375. EARTHWORK, 312300.0020-What is the quantity of fil material available from the on base borrow site?

Response: Contractor shall use the construction documents to determine the available fill from the borrow sites indicated on CE171 and CE172. The contractor shall reference the JADOC Borrow pit documents included as an attachment in the solicitation to determine the available fill from borrow pits 1 & 3. Contractor shall assume receiving a quantity of fill material from the adjacent Taxiway Whiskey Phase 2 project per bid option #12.

381. Bid Option #14 – Removal of Existing Fuel Pipe states to remove existing fuel pipe across extents of site.

a. Exactly what determines the extents of the site? Dwg. CD100 indicates the existing fuel line to extend

North beyond the limits of what is shown on Dwg. CD104 and extend East beyond what is shown on Dwg. CD114. It is unknown how far the fuel line extends to the East. Since the abandoned lines are to be filled with lean concrete, it is necessary to determine the extent of the piping to be abandoned in order to provide a legitimate bid for this item.

Response: The fuel lines outside of the limits of work should not be considered as part of the scope of work for this project. The fuel line shall be capped at the edge of the limits of work as part of bid option 14.

b. The CD series drawings indicate portions of the existing fuel line crosshatched. Per the sheet legend on

Dwg. CD101, the hatched line appears to indicate that this portion of the pipe is to be removed. The remainder of the un-crosshatched pipe would be abandoned. Please confirm the requirement for the crosshatched piping.

Response: The lines indicated with a crosshatch are to be removed per Bid Option 14.

c. Is the existing fuel line currently active & in use?

Response: The fuel line was abandoned in a previous project. See attachment of base records indicating the line has been abandoned and slurry filled.

d. Has this line been drained previously or is it anticipated to be full of fuel?

Response: The previous fuel line abandonment project scope of work included draining fuel from the pipe as part of the abandonment. Contractor shall use caution when removing the pipe in case residual fuel is remaining. Any fuel left in the line would be treated as an unforeseen condition.

e. Can the collected remaining fuel in the existing line be returned to the site fuel farm & filtered thru the existing filters & returned to the storage tanks?

Response: The abandoned fuel line should not contain fuel due to previous abandonment project. See response to item “d” above.

f. Are locations of shutoff valves & low point drains for this line known?

Response: Locations of shutoff valves and low points are not known for this abandoned fuel line. See attachment showing base records of the abandoned fuel line that was slurry filled.

g. What is the diameter of the pipe?

Response: See attachment of base records. Records indicated 2-4”. RFI 381 Attachment- Base Utility Records.

384. Specification 33 52 43.13 Section 2.1.4 refers to protective coating for Buried Steel Piping. This section does not distinguish between carbon steel or stainless-steel pipe. Please confirm if the underground stainless-steel fuel piping requires protective coating per this spec. If the SS pipe is required to be coated, please advise which specification applies to the repair of shop applied coating and coating of fittings and transverse weld joints.

Response: Refer to responses to RFI’s 376, 377, 378.

385. Bid Option 14 asks the Contractor to remove existing jet fuel and piping from the site. CD100 shows a JP line going plan NW of CD105, West along the top of CD101, and North of CD101.

a. Since this line is shown outside of CD101 through CD117, please confirm we are not responsible for draining and filling this abandoned line with concrete, because this is outside the limits of the defined Project area. If we are responsible, please define a North most point of the JP line to be abandoned.

Response: Refer to response to RFI #381.

b. Please clarify the diameter of the existing JP line to help us determine how much concrete is needed to fill the abandoned line and how much fuel needs to be removed.

c. Please confirm our assumption that the existing JP line to be removed/abandoned is completely full with jet fuel.

d. Please confirm if the collected remaining fuel in the existing line can be returned to the site fuel farm, filtered through the existing filters and returned to the storage tanks.

e. Please clarify where existing shutoff valves and low point drains are for this existing line.

386. Bid Option 14 asks the Contractor to remove existing jet fuel and piping from the site. CD100 shows a JP line going plan East of CD114.

a. Since this line is shown outside of CD101 through CD117, please confirm we are not responsible for draining and filling this abandoned line with concrete because this is outside the limits of the defined Project area. If we are responsible, please define an East most point of the JP line to be abandoned.

Response: Refer to response to RFI #381.

b. Please clarify the diameter of the existing JP line to help us determine how much concrete is needed to fill the abandoned line and how much fuel needs to be removed.

Response: Refer to response to RFI #381.

c. Please confirm our assumption that the existing JP line to be removed/abandoned is completely full with jet fuel.

Response: Refer to response to RFI #381.

d. Please confirm if the collected remaining fuel in the existing line be returned to the site fuel farm, filtered through the existing filters and returned to the storage tanks.

Response: Refer to response to RFI #381.

e. Please clarify where existing shutoff valves and low point drains are for this existing line.

387. Specification Section 213000-2.7.1 states “Controllers and transfer switches shall have a short circuit rating of 200,000 amps, r.m.s. symmetrical at 480 volts a.c. as indicated.” The industry standard is 100,000, and most installations do not come close to utilizing 100,000 amps. In addition, there appears to be only (1) UL/FM controller manufacturer that is even capable of meeting the 200,000 requirements. Please review and state which rating is required.

Response: It is acceptable to reduce the short circuit rating to 100,000 amps.

388. CIVIL, AMENDMENT 5-Response to RFI #281 states “See RFI #258 response” There is no RFI #258. (See page 16 of 29 of Amendment 5). Please provide a response to RFI #281.

Response: Response will be provided under RFI 258.

389. SURCHARGE, 31 23 00.00 20 PG 12-Specification 31 23 00.00 20 Excavation and Fill, Paragraph 3.4.1.2 states "In addition, the contractor shall surcharge the hangar slab with five feet of satisfactory material as outlined in Section 3.4.1.1 for a minimum of two-months. At the two-month time frame the test pile program shall begin in accordance with Specification 31.63.16." Is the hangar required to meet the 90% consolidation noted in 3.4.1.1?

Response: For the two-month surcharge located at the Hangar 21 pad, the 90% consolidation requirement noted in 3.4.1.1 does not apply. After two-months the pile load testing shall commence independently of the consolidation that has been achieved.

390. SURCHARGE, 31 23 00.00 20 PG 12-Specification 31 23 00.00 20 Excavation and Fill, Paragraph 3.4.1.1 states "The Contractors geotechnical engineer shall monitor the surcharge area until 90% consolidation even if it exceeds the approximate six-month time period at no additional cost to the government. Each month, the contractors geotechnical engineer shall provide a certified report noting the consolidation process and provide an estimated time to reach the 90% consolidation requirement." Please provide the consolidation test data and calculations that were used to calculate the estimated 6 months’ time.

Response: Consolidation Testing information has been included for the consolidation calculations – see attached documents: RFI 390 Consolidation Test Results Boring 2, RFI-390 Consolidation Test Results Boring 55 and RFI-390 Consolidation Test Results Prelim Study.

391. SURCHARGE, 31 23 00.00 20 PG 12-Specification 31 23 00.00 20 Excavation and Fill, Paragraph 3.4.1.2 states "In addition, the contractor shall surcharge the hangar slab with five feet of satisfactory material as outlined in Section 3.4.1.1 for a minimum of two-months. At the two-month time frame the test pile program shall begin in accordance with Specification 31.63.16." Will the contractor be permitted to start production piles as well as pile caps immediately after acceptance of the test piles? if not, - please clarify the restrictions.

Response: Yes, the contractor will be permitted to start production piles and pile caps after acceptance of the test piles. If the test piles indicate extension of the auger cast pile is required, the contractor will receive acceptance of the test piles after Bid option #11 has been awarded.

392. DEWATERING, 31 23 00.00 20 PG 9-Specification 31 23 00.00 20 Excavation and fill, paragraph 3.1.2.2 states "while the excavation is open, the water level shall be maintained continuously, at least 3 feet below the working level”. The north and south detention facilities along with the 70.000-gallon fuel tank foundations are below the water table and within close proximity to the hangar/Airfield support facilities surcharge. Will the contractor be permitted to draw down the water in these areas as required to construct the facilities without disruption to the Surcharge areas either prior to surcharge or after surcharge?

Response: Dewatering of the area located at the proposed location of the 70,000-gallon fuel tanks may occur at any time.

393. DEWATERING, CG505-Drawing CG505 shows an 84" diameter corrugated solid pipe field. Drawing CG209 profile H-0 to H-3 shows the invert of the pipe at 241.76. This elevation is at least 3' below the water table. Is the design shown able to withstand the uplift without pouring a hold down pad?

Response: A perforated pipe system will be added to the documents to control the ground water elevation if it exceeds the elevations determined in the Geotechnical report. See attached documents for the perforated pipe system location.

394. FUELING SYSTEM, 33 52 43.13-Spec 33 52 43.13 Section 2.1.4 refers to protective coating for Buried Steel Piping. This section does not distinguish between carbon steel or stainless-steel pipe. Does the underground stainless-steel fuel piping require protective coating per this spec? If the SS pipe is required to be coated, what spec applies to the repair of shop applied coating and coating of fittings and transverse weld joints?

Response: Refer to responses to RFI’s 376, 377, 378.

395. FUELING SYSTEM, 33 52 43.13-Spec 33 52 43.13 Section 2.4.3 refers to coated pipe supports. The pipe guides and anchors shown on Dwg. FM514-P & FM515-P are indicated to be carbon steel for carbon steel piping and stainless steel for stainless steel piping. Are the carbon steel supports to be epoxy coated or galvanized?

Response: Refer to response to RFI #379.

396. FUELING SYSTEM, BID OPTION#14-Bid Option #14 – Removal of Existing Fuel Pipe states to remove existing fuel pipe across extents of site. Exactly what determines the extents of the site? Dwg. CD100 indicates the existing fuel line to extend North beyond the limits of what is shown on Dwg. CD104 and extend East beyond what is shown on Dwg. CD114. It is unknown how far the fuel line extends to the East. Since the abandoned lines are to be filled with lean concrete, it is necessary to determine the extent of the piping to be abandoned in order to provide a legitimate bid for this item."

397. FUELING SYSTEM, BID OPTION#14-Bid Option #14 – Removal of Existing Fuel Pipe states to remove existing fuel pipe across extents of site. The CD series drawings indicate portions of the existing fuel line crosshatched. Per the sheet legend on Dwg. CD101, the hatched line appears to indicate that this portion of the pipe is to be removed. The remainder of the un-crosshatched pipe would be abandoned. Please confirm the requirement for the crosshatched piping."

398. FUELING SYSTEM, BID OPTION#14-Bid Option #14 – Removal of Existing Fuel Pipe states to remove existing fuel pipe across extents of site.

a. Is the existing fuel line currently active & in use?

b. Has this line been drained previously or is it anticipated to be full of fuel?

c. Can the collected remaining fuel in the existing line be returned to the site fuel farm & filtered thru the existing filters & returned to the storage tanks?

d. Are locations of shutoff valves & low point drains for this line known?"

399. FUELING SYSTEM, FM510-P-Detail ‘A1’ on Dwg. FM510-P shows the tie-in of the new 8” transfer fuel line to the existing fuel line. Will the existing fuel line be able to be shut down & drained in order to cut in the new tee or will some other method of hot tapping be required at the tie-in?

Response: Refer to response to RFI #382.

400. FUELING SYSTEM, S-305-P-Are the fabricated pipe supports shown on Dwg.’s S-305-P > S-308-P to be fabricated following Spec 05 12 00-Structural Steel or Spec 05 50 13-Miscellaneous Steel Fabrications?

Response: Refer to response to RFI #383.

401. CIVIL, CU104-CU104 Key Note 93 show force main from X12 as a 2.5” PVC pipe but specs are only provided for a PVC Pressure pipe from 4” to 12” and is called out as PVC AWWA C900. This type of pipe is not made in 2.5”, can you specify what type of pipe this Force main should be?

Response:

a. Grade 1 PVC compound material as defined in ASTM D-1784 and shall be SDR21,

b. Pressure class 200 in accordance with ASTM D 2241 or SDR-17 with a pressure rating of 250 psi, in accordance with ASTM D-2241.

c. Fittings shall be solvent weld Schedule 80 PVC.

d. The pipe shall be plainly marked with the manufacturer’s name, size, material (PVC) type and grade or compound, NSF seal, pressure rating and reference to appropriate product standards.

417. CIVIL - SITE UTILITIES, CU107-Keynote number 89 calls out the "Point of Demarcation for Terrapin

Utility". Does Terrapin Utility install the sanitary sewer up to that point? Does Terrapin Utility make the connection to the building? Please define what scope of work is being performed by Terrapin Utility.

Response: The point of demarcation for Terrapin is the point where Terrapin ownership ends and where Joint Base Andrews (JBA) ownership begins from the point of the demarcation to the building. See sheet C-002 for General Terrapin Utility Services (TUS) Note 5.

418. Reference EY113-H and EY601-H. Please clarify whether the paging speakers in Rooms N28, N29 and N35 are to be part of the Kitchen/Scullery sub-system.

Response: Speakers in N28, N29 and N35 are not to be part of the kitchen/scullery subsystem.

421. Reference EY603-H. Please clarify the requirements for the Rackmounted PoE switches shown as part of the Clock System Block Diagram. They are not included in the specification.

Response: POE Switches must come from Department of Defense Information Network Approved Product List (DODIN APL) https://www.disa.mil/network-services/ucco. Switches shall be compatible with clock system specification.

422. Specification 33 52 43.13 Section 2.4.3 refers to coated pipe supports. The pipe guides and anchors shown on drawings FM514-P & FM515-P are indicated to be carbon steel for carbon steel piping and stainless steel for stainless steel piping. Please advise if the carbon steel supports are to be epoxy coated or galvanized.

Response: Refer to response to RFI #379.

423. Detail A1 on drawing FM510-P shows the tie-in of the new 8” transfer fuel line to the existing fuel line. Please advise if the existing fuel line can be shut down & drained to cut in the new tee or will some other method of hot tapping be required at the tie-in.

Response: Refer to response to RFI 382.

424. Please advise if the fabricated pipe supports shown on drawings S-305-P through S-308-P are to be fabricated following specification 05 12 00-Structural Steel or specification 05 50 13-Miscellaneous Steel Fabrications.

Response: Refer to response to RFI 383.

425. RFI #200 states expansion joints can be determined from specification sections 23 52 00 - 2.12.12.1 and 23 64 26 - 2.5.8.1 as well as M-601-H through M-611-H. According to ATS, there is not enough information provided to calculate the expansion to figure the expansion joints' required traverse.

Response: Provide expansion joints that will accommodate a maximum of 4” of traverse.

426. The louver schedule on M-705-H has inconsistencies with what is shown on the architectural elevations. The schedule indicates there are two 1'-6" x 1'-6" louvers, however, only one was found on the elevations on A-206-

H. Also, the schedule says there are four 2'-6" x 2'-0" louvers and two 3'-0" x 2'-6" louvers, however, there are five 2'-6" x 2'-0" louvers and only one 3'-0" x 2'-6" louver shown on the elevations. Please clarify the correct counts and sizes for these louvers, and indicate the correct location on the architectural elevations.

Response: There are no 18”x18” louvers located on the South elevations of the hangar facility, hence none are shown on Sheet A-206-H. The louver sizes and quantities shown in the louver schedule on Sheet M-705-H are correct. Refer to M-3XX-H mechanical section sheets and MHXXX-H HVAC floor plans for louver locations.

427. Detail A1 and A3 on drawing ETH601-H have match lines between Room S13 and T32 that don't match in quantity and media description. Please clarify.

Response: ON SHEET ET601-H/A1 ADD (2) 200 PAIR OSP COPPER, (2) 96 STRAND OSP SMF AND

(1) 24 STRAND OSP SMF TO N36 COMM ROOM ROUTE THROUGH TMH8. REFER TO SHEET

ET105-H FOR FURTHER ROUTING TMH8 TO N36.

ON SHEET ET601-H/A3 ADD AN ADDITIONAL 96 STRAND OSP SMF, AN ADDITIONAL 200 PAIR

OSP COPPER AND ADDITIONAL 24 STRAND OSP SMF TO ET601-H/A1 FROM ET601H-A3.

428. Detail A3 on drawing ET601-H shows a match line (upper right) to detail A1 on drawing ET602-H. When this is followed through ET603-H and ET605-H the cabling refers to a match line at detail A1/ET-601H. This indicates a loop and conflicts with the match line between Room S13 and T32. Please clarify. Is there an overall inside plant cabling drawing showing cabling between telecom rooms?

Response: Refer to response to RFI #427.

429. The detail for typical “REEL” Connection on drawing ET501H indicates government furnished and government installed (GFGI). Please clarify whether the telecom contractor is to provide any cabling and equipment associated with this outlet.

Response: The outlet is where contractor responsibility ends.

430. Please clarify whether there are any telecom requirements associated with sheet note #3 on drawing ET1A1.H.

Response: No telecom requirement.

431. Please clarify the telecom cabling requirements for (EMCS) WAOs on drawing ET1A1.H and where they cabled to.

Response: Refer to Sheets ET110-H and EY603-H. All associated EMCS communications are a standalone isolated system to originate at the control cabinet to final drop location. Coordinate with HVAC/BACnet provider

432. Please clarify what type of cable is required for the antenna connections on drawing ET1A1.H, note #5.

Response: Refer to Sheet ET502-H/A3. Fire room 9 Cable compatible with Monaco Systems. GPS Clock High Gain Antenna Belden 8219 or equivalent and Single mode Fiber. DTV see ET502/A1

433. DWG.ET601-H, DETAIL A1 indicates two (2) 200 PAIR CU backbone, two (2) 96 strand SM backbone and one (1) 24 strand SM backbone cables to the match line connecting Detail A1 with Detail A3. However, match line for Detail A3 only shows one (1) 200 PAIR CU backbone and one (1) 96 strand SM backbone cable. Please clarify by providing termination location of the other 200 pair CU backbone and the 24 & 96 strand SM backbone cables.

Response: Refer to response to RFI #427.

434. Reference drawing ET101-H, Sheet Note 1. Please provide the number of drops required for monitoring this space as the telecom contractor cannot determine what type and quantity of monitoring is required.

Response: Coordinate with equipment vendor.

435. Please clarify whether Option 8 indicated in General Note A on drawing ET101-H includes just a Cat 6A patch cord from the terminated cables in the floor or wall box (part of Base Bid) to the system furniture user location or whether it includes a patch cord from the floor/wall boxes to a faceplate with jacks mounted in the system furniture desks.

Response: Refer to response to RFI #327.

436. Room U37 on drawing ET106-H indicates two NIPR WAOs in the room, however drawing ET107-H indicates no NIPR WAOs. Please clarify which drawing is correct as the match line cuts that room in half.

Response: Refer to Sheet ET402-H ENLARGED SECURE AREA

437. Dispatch Room U38 on drawing ET106-H indicates ten WH WAOs in the systems furniture along match line, however ET107-H indicates no WH WAOs. Please clarify which drawing is correct as the match line cuts that room in half.

Response: Refer to response to RFI #436.

438. Please clarify what the Telecommunications cabling requirements are for the “AV-F” WAOs on drawing E- 001-H.

Response: OM5 Multi mode.

439. Please clarify that the Telecommunications cabling requirements are for the “EMCS” WAOs on drawing E-001- H.

Response: Refer to Sheet EY603-H.

440. Reference specification 271000 & Drawing ET501-H. Please advise what color the NIPR Jack should be.

Response: NIPR jacks shall be Blue in color. Voice Jacks shall be White in color.

441. Reference specification 271000 & Drawing ET501-H. Please advise what color should be provided for the SIPR LC Keyed connectors.

Response: TIA/EIA 568-D.3 specifies jacket color lime green. Use a beige connector with white boot Labelling will designate Drop usage.

442. Reference specification 271000 & Drawing ET501-H. Please advise what color should be provided for the WH LC Keyed connectors.

Response: Refer to response to RFI #441.

443. Drawing ET107-H has some of the same WAOs that are shown on ET402-H. Please advise whether we should only be adding the “Secure” WAOs on ET402-H or whether we should compare the two drawings and add all of the WAOs that are not duplicates on ET402-H.

Response: Refer to response to RFI #436.

444. Please advise whether there any additional Telecom cabling requirements for the WAP “LP” locations on

ET402-H.

Response: LP is Low Power.

445. Reference drawing E-001-H & Drawing ET501-H. Please advise whether a Wall Telephone “W” receives a 1 Port with hanger stud faceplate whereas the Telephone receives just a 1 Port faceplate.

Response: Wall Telephone has one port with hanger studs and telephone has 1 port faceplate.

446. Reference specification 27 10 00. Please clarify whether UNICAM keyed field installable fiber connectors may be utilized for the termination of horizontal fiber cables in lieu of spliced cables.

Response: Fusion splicing is required.

447. Reference specification 27 10 00. Please clarify whether UNICAM field installable fiber connectors may be utilized for the termination of backbone fiber cables in lieu of spliced cables.

Response: Fusion splicing is required.

449. Please confirm if Polypropylene pipe (PP) can be used as an alternate to RCP pipe, in accordance with UFGS – 33 40 00 Section 2.1.11.

Response: RCP shall be provided as indicated.

450. “Attachment 14 - Clean Earth AFB Sampling Event Final Report.pdf” and “Attachment 15 - Clean Earth Miscellaneous Tests.pdf” were provided in the RFP. Included in these attachments are sampling results for a 3rd borrow pit located on JBA. Please advise if the contractor is allowed to utilize this borrow pit for fill material on the project site. And if so, please provide existing and finish grade of the material that can be removed.

Response: The only approved borrow pits within Joint Base Andrews are located on sheets CE171 and CE172. The borrow pits associated with MDE permit No. 18-SF-0054 on sheets CE171 and CE172 are included in the electronic attachment titled “P-3001 JADOC Stockpiles” which includes all contour information. There is a third borrow pit located within “P-3001 JADOC Stockpiles” that is not indicated on sheets CE171 and CE172. That stockpile shall not be used for the Hangar 21 project.

452. Please clarify whether cabinets are required for the UP-7-01 and UP-7-02 locations on drawing ET1A1-H. If so, please provide manufacturer, part number and description.

Response: Question is not clearly understood. If it pertains to Telecom Wall Mount Cabinet see ET608- H. Cabinet shall be Nema 4 rated with requirements in specifications.

453. Note 1 this be

454. "Draw assum a.

b.

c.

d.

e.

f.

g.

h.

i.

j.

Respo a.

b.

c.

d.

e.

f.

g.

h.

i.

j.

General De

Superseded

State: Mary

Constructio

17 on drawing e OM4?

onse: OM5 is c wing ET1A1-H mptions are corr

Drawing ET . Drawing ET Drawing ET . Drawing ET Drawing ET

Drawing ET . Drawing ET . Drawing ET

Drawing ET Drawing ET cabled to C onse:

. EMCS dro

Cat6A drop . EMCS dro

Cat6A drop . EMCS dro

Cat6A drop . EMCS dro

Cat6A drop . EMCS dro

Cat6A drop EMCS dro Cat6A drop

. EMCS dro Cat6A drop

. See Sheet n EMCS dro Cat6A drop EMCS dro Secure Are ecision Numbe d General Deci yland on Type: Build

ET1A1-H stat correct.

clearly states w rect for where t

T101-H should T102-H should T103-H should T104-H should T105-H should T106-H should T107-H “Non- T108-H should T109-H should T402-H “Secur

OMM U22.

ops go to EMC ps go to Comm ops go to EMC ps go to Comm ops go to EMC ps go to Comm ops go to EMC ps go to Comm ops go to EMC ps go to Comm ops go to EMC ps go to Comm ops go to EMC ps go to Comm notes ET108-h ops go to EMC ps go to Comm ops go to EM ea Drops to U3 er: MD180058 ision Number:

ding tes that there s where each of the WAOs on t d be cables to C d be cabled to C d be cabled to C d be cabled to C d be cabled to C d be cabled to M Secure” should d be cabled to C d be cabled to C re” should be c

CS control cab m N36.

CS control cab m P31

CS control cab m Q11.

CS control cab m W10.

CS control cab m N36.

CS control cab m T33.

CS control cab m U22.

h CS control cab m W10.

MCS control 32 and Non- S

Update to W

05/25/2018 M

MD20170058

should be 12 st the WAOs sho the drawings s

COMM N36.

COMM P31.

COMM Q11.

COMM W10.

COMM N36.

Main COMM T d be cabled to

COMM U22.

COMM W10.

cabled to Secu binet coordina binet coordina binet coordina binet coordina binet coordina binet coordina binet coordina binet coordina cabinet coord Secure Area d

Wage Determi

MD58

trands of MM ould be cabled should be cable

T33.

COMM U22.

ure COMM U3 ate with HVAC ate with HVAC ate with HVAC ate with HVAC ate with HVAC ate with HVAC ate with HVAC ate with HVAC dinate with H rops to Comm inations

“OM5”. Is OM d to. Please con ed to;

32 and the “No

C and BACne

C and BACne

C and BACne

C and BACne

C and BACne

C and BACne

C and BACne

C and BACne

HVAC and B m U22.

N4008018R

M5 correct or s nfirm if the foll on-Secure” sho et contractor.

et contractor.

et contractor.

et contractor.

et contractor.

et contractor.

et contractor.

et contractor.

BACnet contr

R0003 should lowing ould be

Other

Other

Other

Other

Other

Other

Other

Other ractor.

County: Prince George's County in Maryland.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 02/23/2018 4 03/23/2018 5 04/20/2018 6 05/04/2018 7 05/11/2018 8 05/25/2018

ASBE0024-007 10/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.13 16.22

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

ASBE0024-010 10/01/2017

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 22.81 7.34

BRMD0001-006 04/30/2017

Rates Fringes

TILE SETTER......................$ 27.44 11.44

BRMD0001-011 04/30/2017

Rates Fringes

BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 30.91 10.24

BRMD0001-012 04/30/2017

Rates Fringes

MASON - STONE....................$ 36.91 16.55

BRMD0001-013 04/30/2017

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 28.19 11.44

CARP0177-011 01/01/2018

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 28.46 11.53

CARP0219-001 05/01/2017

Rates Fringes

MILLWRIGHT.......................$ 32.49 11.23

* ELEC0026-021 09/11/2017

Rates Fringes

ELECTRICIAN (Communication and Sound Equipment).............$ 27.80 10.55

ELEC0026-022 11/06/2017

Rates Fringes

ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 45.15 17.15+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.

ELEV0010-001 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 44.12 32.645+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0077-017 05/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR:

Backhoe.....................$ 31.50 9.20+a Bulldozer...................$ 31.50 9.20+a

a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.

IRON0005-011 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

LABO0657-021 06/01/2015

Rates Fringes

LABORER (Common or General)......$ 14.93 7.31 LABORER: Mason Tender - Cement/Concrete..................$ 22.63 7.31 LABORER: Pipelayer..............$ 22.63 7.31

PAIN0051-014 06/01/2017

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 25.74 11.55 Glazing Contracts over $2 million.....................$ 29.87 11.55

PAIN0051-019 06/01/2017

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher/Taper......$ 25.06 9.66 Industrial..................$ 30.90 10.49

PLAS0891-005 07/01/2016

Rates Fringes

PLASTERER........................$ 28.83 6.05

PLAS0891-006 02/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.15 10.58

PLAS0891-008 08/01/2016

Rates Fringes

PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

PLUM0005-010 02/01/2018

Rates Fringes

PLUMBER..........................$ 41.67 17.60+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-011 08/01/2017

Rates Fringes

PIPEFITTER (Including HVAC Pipe and System Installation)....$ 40.69 21.07+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 05/01/2016

Rates Fringes

ROOFER...........................$ 28.75 11.74

SFMD0669-001 04/01/2017

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 34.40 19.24

SHEE0100-015 03/01/2018

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 18.87+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUMD2010-092 08/04/2010

Rates Fringes

LABORER

Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 0.00 Mason Tender - Brick........$ 13.28 2.95 Mason Tender - Stone........$ 14.03 0.00 Mason Tender for Pointing, Caulking and Cleaning.......$ 14.15 0.00 Mortar Mixer................$ 16.61 9.08

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.14

POWER EQUIPMENT OPERATOR:

Asphalt Roller..............$ 21.35 5.38 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 0.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 5.18 Loader......................$ 24.00 5.40 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88

TILE FINISHER....................$ 17.87 7.32

TRUCK DRIVER

Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.