ACQR4929810

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILITARY CONSTRUCTION P3021, DESIGN-BID-BUILD OF HANGAR 21, JOINT BASE ANDREWS, CAMP SPRINGS, MARYLAND

The purpose of this amendment is to provide the follow ing:

1. Responses to RFI questions.

2. Extend Proposal due date/time to May 30, 2018 BY 2:00 PM EST

3. Update to Wage Determinations

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 27

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0003

X 9B. DATED (SEE ITEM 11)

04-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-May-2018

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION

SUMMAR

SECTION

The follow

AMEN

MILITARY

CAMP SPR

The purpos

1. Respon

2. Extend

3. Update

All other te

10. Detail the enlarge B1 on shee

Response:

will be rev

12. Drawi project hav supports s

16. Items more detai

48"L x 7 polypropy constructe connector

41. A new Please con be carried

SF 30 BLOCK

RY OF CHAN

SF 30 - BLO

wing have been

NDMENT 000

Y CONSTRU

RINGS, MAR

se of this amen nses to RFI que Proposal due d to Wage Deter erms and cond l A2 on sheet A ed detail of the et A-613-E a ho

: An aluminum vised to reflect ing FM514-P d ve seismic requ

: There is no shown on the s

10, 11, and 18 ls such as mod

: Basis of Des 75"H, 5-tier, ylene shelf pl ed of steel w s, (4) premium w 4" gas line nfirm that NAV for this scope o

K 14 CONTIN

NGES

CK 14 CONTI

n added by full

UCTION P302

RYLAND

ndment is to pr estions.

date/time to M rminations itions remain u

A354E shows a e head and sill ollow metal fra m framing sy t an aluminum does not indica uirements. Plea o additional s structural dra

8 in section 11 del number, hei sign is CPMU , withstands ates with Ca with polyprop m swivel caste by Washingto VFAC will be s of work.

NUATION PAG

INUATION PA

text:

21, DESIGN-B

rovide the follo

May 30, 2018 BY unchanged.

Resp a section cut o conditions are ame is indicate ystem will be m framing syst ate seismic is r ase confirm sei seismic bracin awings were d

1 06 40.13 call ight, number o

U214875V5480 temperature mguardT ant pylene exterio rs with total l on Gas is indic soliciting this w

GE

AGE

BID-BUILD O

owing:

Y 2:00 PM ES

ponses to RFIs f exterior alum located on C1 ed at the alumin used, refer to tem.

equired for the ismic is not req ng required f esigned for se l out "CAMBR f shelves for ea

0 - Camshelvi -36°F (-38° timicrobial pr or), (10) trav ocking brake, cated on civil work directly f

OF HANGAR

ST

s minum glass sy 1 and B1 on A-num glass syst o specification e fuel systems;

quired for the P for the fueling eismic support

RO PREMIUM

ach unit, statio ing® Premium °C) to 190°F rotection, (2) verses, molde , donut bumpe drawings CU from Washingt

R 21, JOINT

ystem type EX -613-E howeve tems. Please ad n 08 41 16 sec

; however, man POL fuel system g piping in th t.

M" for the shel onary vs casters m Mobile Sta F (88°C), inc pre-assembl d-in dovetail ers, speckled g

U101, CU103,

ton Gas or prov

N4008018R

BASE ANDR

15 and EX2 an er, on details C dvise.

ction 1.4.10. D ny other parts ms.

he POL. The lving. Please p s.

arter Unit, 21 cludes: (5) v ed post kits s, (2) sets of gray, NSF.

CU107 and C vide an allowa

R0003

REWS,

nd that C1 and

Details of this e pipe provide

1"W x vented (posts f post

CU112.

ance to

N4008018R0003

Response: Contractor is responsible to coordinate with Washington Gas and the price for the scope of work is to be included in the proposal.

54. Amendment 1 page 10 states the following:

“Along with each team’s Phase II Proposal, each offeror will submit this complete list along with a certification for each company signed on company letterhead, by the executive in responsible charge, certifying that all electronic and hard copies of the construction documents were handled in accordance with Executive Order 13556, Controlled Unclassified Information and DODM 5200.01V4, DOD Information Security Program: Controlled Unclassified Information (CUI) and that all electronic and hard copies of the construction documents were properly and completely destroyed.”

As discussed at the pre-bid meeting it is unrealistic for all contractor and subcontractors to destroy the documents and certify such along with the Phase II Proposals as the documents will be in use right up to the time of submittal. Also in the event of a Best and Final event these documents will be required. Please revise the requirement to require certification that the documents will be properly destroyed in the event the contractor or subcontractor is not selected for the project.

Response: The Offeror is to acknowledge in writing that they will destroy construction documents upon contract officer request. For the awarded Offeror, destruction would occur per the construction documents, 5 years after construction completion. For other Offerors, destruction would be upon notice of non-award.

"Along with each team's Phase II Proposal, each offeror will submit this complete list along with a certification for each company signed on company letterhead, by the executive in responsible charge, certifying that all electronic and hard copies of the construction documents were handled in accordance with Executive Order 13556, Controlled Unclassified Information and DODM 5200.01V4, DOD Information Security Program: Controlled Unclassified Information (CUI) and that all electronic and hard copies of the construction documents will be properly and completely destroyed upon subsequent request for such by the Contracting Officer. Within 30 days of such request, each offeror will submit this complete list along with a certification for each company signed on company letterhead, by the executive in responsible charge, certifying that all electronic and hard copies of the construction documents were handled in accordance with Executive Order 13556, Controlled Unclassified Information and DODM 5200.01V4, DOD Information Security Program: Controlled Unclassified Information (CUI) and that all electronic and hard copies of the construction documents were properly and completely destroyed."

58. ENVIRONMENTAL, 017419-Please confirm that the government will be considered the generator of any existing hazardous waste encountered on the site and will sign all manifests.

Response: Confirmed, the government will sign manifests.

61. TECHNICAL CONTENT, FACTOR 5, PAGE 7 OF AMENDMENT 1-The requirements for the submitted CPM schedule under FACTOR 5 – SCHEDULE & EXECUTION APPROACH for the Phase II of the solicitation states: “In the schedule the offeror shall provide no more than 100 items of critical path activities, milestones, durations, and other important activities for these items”. Please confirm that the summary schedule is limited to 100 line items.

Response: Confirmed, no more than 100 items.

63. TECHNICAL CONTENT, AMENDMENT 01 PAGE 10-The document handling requirements state that ""Along with each team's Phase II proposal, each offeror will submit [a list of every company (subcontractor) to which they distribute the construction documents], along with certification for each company signed on company letterhead.... that all electronic and hard copies of the construction documents were handled in accordance with Executive Order 13556... and that all electronic hard copies of the construction documents were properly and completely destroyed.""

Response: see RFI 64’s response.

64. Can NAVFAC please confirm the following:

1. At time of bid, it is not NAVFAC's expectation that all documents are to be certified as destroyed, but instead that the bidding documents were handled in accordance with the provisions identified on pages 10 and 11 of Amendment 001.

Response: See response 54. It is NAVFAC's expectation that the Offerors will provide a letter certification of the intent to comply with the request.

2. It would be acceptable for Offerors to provide executed Non Disclosure and Document Handling Affidavit signed by each subcontractor's executive responsible in charge, certifying that a letter, confirming destruction on company letterhead, will be provided to the Offeror for submission to the Navy once an award has been made.

Response: See response 54. It is NAVFAC's expectation that the Offerors will provide a letter certification of the intent to comply with the request.

3. The NDA referenced in line item 2 above does not need to be on company letterhead.

Response: NDA should be on company letterhead, but can be received electronically.

4. The verification of Document Handling documents outlined are to be included in the Offeror's Phase II Price submission. "

Response: Provide letter certification of the intent to comply with the Document Handling procedures with the Phase II submission.

67. FIRE PROT, 21 13 20-Spec 21 13 20 requires hot-dipped galvanized pipe downstream of the flow control deluge valve for the foam/water solution which will be 3%. Will manufacturer's galvanized pipe with cad plated fasteners be acceptable in lieu of hot-dipped galvanizing for the 3% foam/water solution?

Response: No, the proposed substitution does not meet the UFC or the Contract Documents and is not an acceptable substitution.

82. Do the translucent panels described in specification 086045 need to be reinforced to design to UFC 4-010-01 blast loads or just standard wind loading? The translucent wall units appear to be located about the Hangar which is typically a low occupancy classification that does not require blast load design for translucent panels.

a. Please clarify if any translucent panels need to be reinforced to blast load designed to UFC 4-010- 01 and if so, what is the psi blast load?

Response: Translucent panels are not required to comply with Standard 10 of the stated UFC. Structural framing members supporting the panels have been provided and were checked to perform adequately.

b. If blast loading is required, please clarify if only the frames are to be designed to these loads and the panels are allowed to disengage.

Response: Translucent panels are not required to comply with Standard 10 of the stated UFC. Structural framing members supporting the panels have been provided and were checked to perform adequately.

83. Reference drawings SF217-H thru SF220-H. Multiple types of members are noted as typical for the un-identified members. Please clarify how the un-identified members should be identified with multiple choices available.

Response: Refer to response to RFI #74.

84. Reference drawing EA607. Detail C2 calls for an L-868 12” Diameter Deep Base. Typically, this application requires an L-867 12” Diameter Deep Base. Could you confirm the L-868 is correct?

Response: The base cans are correct as L-868 load bearing base cans.

85. Detail C3 on S-308-P shows the framing for some of the pipe supports for the fuel lines. The chart on S-102-P indicates to see the Fueling Dwgs for the elevations. There doesn't appear to be any clearly marked elevations showing the required height of the supports (FM-402-P). Please clarify heights of supports indicated to see Fueling Dwgs.

Response: The pipe centerline elevations are defined in the pipe support schedule on sheet FM601-P.

Between the pipe centerline elevations and the dimensions outlined in the details on the structural sheets, the supports are fully defined.

86. Reference drawings S-101-F and S-304-F. There are two W10x33 columns indicated on the plan for the Fire Pump House, but there doesn't appear to be any base plate detail for this size column. Please clarify.

Response: See W10X33 base plate detail on sheet S-304-P.

87. Part 2.4.2 in section 08 60 45 states that the translucent fiberglass wall panels are to be 4" thick, have a u-factor of 0.15, and have a light transmission of 17% with crystal/crystal color. Is it acceptable to provide 2-3/4" thick panels with a u-factor of 0.14, and a light transmission of 14% to cut costs?

Response: Provide the 4” thick panels as required in the contract documents. Thickness is based upon multiple design and detailing factors.

88. Part 2.5.J of section 08 60 45 states to refer to section 09 06 00 for translucent fiberglass panel finishes, and to provide a corrosion resistant anodized finish. Is a custom corrosion resistant finish with fluoropolymer resins that matches the MTLC CMX Silver color listed in section 090600, and complies with AAMA 2604 acceptable?

Response: The proposed finish is acceptable as long as the performance of the proposed finish matches the specified corrosion resistant anodized finish.

89. Part 1.1 of section 08 60 45 indicates that the translucent fiberglass wall panels must meet the requirements of UFC 4-010-01. The frame blast loads indicated in 2.5.L are for glazing only. Please provide either the standoff distance and blast weight, or blast pressure and impulse.

Response: Translucent panels are not required to comply with Standard 10 of the stated UFC. Structural framing members supporting the panels have been provided and were checked to perform adequately.

90. Security drawings have been issued for a number of Volumes, however no Div. 28 security specifications were issued. Please clarify whether the GC is responsible for security cabling, equipment, devices, etc. or if only rough-in for security systems will be required. (Intrusion detection, access control, CCTV)

Response: Refer to response to RFI #57.

91. Specification Section 01 14 00 - 1.26.1.1 - 2 references heating and cooling for a temporary guard booth. Please schedule desired HVAC equipment for this booth.

Response: Contractor to provide adequate temporary facilities including HVAC, based upon the facility provided (including its R-values, etc.).

92. Specification Section 01 50 00 - 3.6.1 states HVAC and plumbing are required for the government field office.

Please schedule desired HVAC and plumbing equipment for this office space.

Response: Contractor to provide adequate temporary facilities including HVAC, based upon the facility provided (including its R-values, etc.). HVAC and plumbing should be designed based upon the occupancy indicated by the facility in Specification 01 50 00 – 3.6.1. It should be assumed a dual screen desktop computers will be utilized at each office and workstation, conference room will include a projector with attendees each utilizing a laptop, and the equipment will be utilized (refrigerator, coffee, pot, microwave, etc.).

93. Reference section 31 23 00.00 20 - 3.4.1.2. Please confirm if the Hangar Area requiring Surcharge includes the Admin / Shops area as well.

Response: The surcharge area applies to the Admin/Shop area as well. The CE series of plans within Volume 1A illustrates all surcharge locations. See CE121 and CE122 for limits of surcharge within the Admin/Shop area.

94. The architectural drawings A-004-H, A-114-H and A-117-H have truck wells shown. Details on A-411-H indicate that there should be railings on the north side truck ramp. Please confirm railings are required for both ramps, and provide enlarged details showing the truck ramp, including railings and other details.

Response: Refer to sheet A-515-H for the details regarding the hand and guardrails on the north side of the building at Receiving #N26. Revise sheet keynote #1 on sheet A-515-H to read: 1. ALL EXTERIOR HANDRAILS AND GUARDRAILS TO BE GALVINIZED. Also, refer to specification section 05 52 00 METAL RAILINGS, paragraph 2.2.2. The drawings will be revised accordingly.

For the guardrail at the south truck well serving the overhead coiling door #Q12E, refer to the East Partial Elevation on sheet A3 / A-201-H and the structural ramp section drawing C4 / SB514-H. Use the same vertical and horizontal member spacing as indicated on the elevation drawing A1 / A-515-H, GUARDRAIL ELEVATION (DOCK RAMP) and the section drawing C4 / A-515-H, SECTION. Revise sheet keynote #7 on sheet A-201-H to read: 7. GALVINIZED STEEL GUARDRAIL Also, refer to specification section 05 52 00 METAL RAILINGS, paragraph 2.2.2. The drawings will be revised accordingly.

95. The handrail along the wall for the ramp on the north side of the building (A-114-H; A-411-H) isn't clear on what is required. Is this a floor mounted railing or a wall mounted railing? Please clarify.

Response: In addition to sheets A-114-H and A-411-H refer to sheet A-515-H for the details regarding the hand and guardrails on the north side of the building at the Kitchen Receiving area.

96. Sheet note E on A-201-A indicates "install bird control spikes at all open horizontal structure as indicated on the drawings." Drawing A-521-A identifies bird control spikes at the Covered AGE Storage. Please provide a specification or additional product information.

Response: For the Bird Barrier use the Basis of Design was Bird-Flite Wide by Bird Barrier America Inc.

Other products similar to the basis of design by other manufacturers are also acceptable.

97. Reference details B4/A-118-H and A2/A-305-H. A note on the plan view A-118-H calls for waterproofing membrane beneath the floor slabs of rooms Lobby C26, COPR C27, and Lift S14. Section cut detail A2/A-305- H shows waterproofing membrane beneath Mechanical room S15 and Comm. Entry #1 S13. Please confirm waterproofing membrane is required beneath rooms S15 and S13.

Response: Confirmed. Waterproofing is required beneath MECHANICAL #S15 AND COMM ENTRY #1 #S13 as indicated by the lower left sheet note on A2 / A-305-H, BUILDING SECTION – E/W(MASS

BRIEFING).

98. Section 07 41 13 describes metal roof panels, but gives no information as to what buildings roofs are to receive these. The drawings only call out single ply membrane roofing at the roof of the hangar building. Please provide the locations where metal panel roofing is to be installed.

Response: Refer to all of the drawings in Volumes 1A, 1B, 3, 4, 5 and 6. Locations of structural standing seam roofing are called out. It is correct that there is no structural standing seam roofing on the hangar building as shown in Volumes 7A, 7B, 7C, 7D and 7E.

99. Details on FS101-H, FS102-H, and FS501-H show the AFFF grate nozzles in the trenches of the hangar. Detail

B2 on S-003-H does not show the AFFF grate nozzles interfacing with the metal grates. Does the AFFF grate nozzle get installed above or below the metal grate? Does the metal grate have to be modified so the AFFF grate nozzle is flush with the rest of the grate? Please provide a detail showing how AFFF grate nozzles interfaces with the metal grates on the floor of the hangar to ensure the grates maintain their rating to support an aircraft and provide proper coverage to maintain their fire suppression rating.

Response: The AFFF grate nozzles, trench grates (both open and solid variety) all form a continuous, uniform, aircraft rated surface at the top of the trench, flush with the adjacent floor elevation throughout the hangar bays. If one is not familiar with this AFFF grate nozzle product, please refer to this product information: http://www.vikinggroupinc.com/databook/foam/discharge%20devices/011900.pdf.

100. Please confirm Specification Section 33 52 10 - SERVICE PIPING, FUEL SYSTEMS is for the discharge of the 4,000 gallon product recovery tank while Specification Section 33 52 43.13 is for all other aviation fuel piping.

Response: Section 33 52 10 – SERVICE PIPING, FUEL SYSTEMS is applicable to all non-aviation fuel piping, including that related to boiler and generator systems.

101. The directional boring with casing for the underground aviation fuel piping is called to be single wall piping;

however, MD COMAR 26.10.02.03 does not allow for single wall piping underground. Please confirm single wall piping is required despite MD COMAR standards.

Response: The Hangar 21 hydrant fuel system was designed under 40 CFR 280.20 and 40 CFR 280.252.

Existing recent systems installed at JB Andrews, including the cross-base transfer line, were designed under the same criteria. The proposed design will include cathodic protection and a computational pipeline tightness testing/leak detection system in accordance with the 40 CFR 280.252 requirements.

102. General Note I on P-001-H states, "A government employed independent commissioning authority (CxA) will provide total building commissioning for the Project as specified in the Contract Documents." Specification Section 01 91 00.15 - 1.1 confirms this. Specification Section 01 91 00.15 - 1.7 infers that the Contractor is required to provide a commissioning firm. Please confirm the Owner/Government will provide all commissioning and the Contractor will provide TAB first tier.

Response: The Commissioning Authority will be contracted directly with the Owner/Government, independent of the Contractor. However, the Contractor must still participate in the Commissioning Process as specified in Section 01 91 00.15 – TOTAL BUILDING COMMISSIONING and as referenced thereafter throughout the specifications.

103. Reference drawing IG-101-F. Please provide a signage type for the first sign on the schedule corresponding to Room 502.

Response: The signage shall be Sign Type 7 per detail D4.

104. Specification section 03 30 00 - 3.10.1.1 outlines maximum allowable joint spacing, "in slabs on ground...divide slab into areas not in excess of 1,200 square feet." Can this area size be increased?

Response: This size area cannot be increased.

105. Typical slab notes indicate "doweled construction joint, refer to C1/CP502." Dowel notes on CP503 describe "epoxy coated" dowels. Please confirm if the structural concrete requires epoxy coated dowels sim. C1/CP502?"

Response: Epoxy coats are required on all dowels indicated in Volume 1A as noted in the dowel bar installation notes on CP503.

106. Note 43 of CS101 describes a dumpster enclosure area with details provided on Sheet A-101-D in Volume 1B, but the sheet is missing from the volume. Please provide Sheet A-101-D.

Response: Refer to Volume 1B, Sheet 30 of 157.

107. Reference RFP, Evaluation Factor 6. Small Business Utilization states, "The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value." Please confirm lower tier participation is not evaluated with a "step-down" approach.

Response: Only the 1st tier subcontracting is evaluated under the Small Business Factor; 2nd and 3rd tier subcontracts are not evaluated.

108. Reference section 11 06 40.13 and drawing QF103-H. Please clarify equipment item #47. The written specifications call for a tilting skillet, while the model on the drawing equipment list is for a 6-gallon, gas, tilting kettle. Drawing makes it look like a small kettle on a stand.

Response: ITEM # 47 TILTING SKILLET BRAISING PAN, COUNTERTOP, ELECTRIC Dimensions: 38.75(h) x 29.25(w) x 29(d) Quantity: One (1) Manufacturer: Blodgett Steam Model: BTT-16E SIS No.: C*013

1. One (1) Model BTT-16E Braising Pan, electric, 16-gallon capacity, counter-top, manual controls & tilt, with 1 piece coved corner stainless steel round pan

2. One (1) 1 year parts & labor warranty, standard

3. One (1) 480v/60/3-ph, 7.5 kW

4. One (1) Double pantry faucet

5. One (1) Lift-off cover, stainless steel

6. One (1) Etched gallon markings

109. Reference section 11 06 40.13 and drawing QF103-H. Please clarify equipment item #48. The written specifications call for a tilting skillet, but the drawing makes it look like a kettle.

Response: ITEM # 48 TILTING SKILLET BRAISING PAN, COUNTERTOP, GAS Dimensions: 40.75(h) x 29.25(w) x 29.88(d) Quantity: One (1) Manufacturer: Blodgett Steam Model: BTS-16G

SIS No.: C*013

1. One (1) Model BTS-16G Braising Pan, gas, 16-gallon capacity, counter-top, manual controls, with 1 piece coved corner stainless steel pan with polished interior, 30,000 BTU

2. One (1) 1 year parts & labor warranty, standard

3. One (1) 120v/60/1-ph, standard

4. One (1) Double pantry faucet

5. One (1) 2" tangent draw off with strainer

110. CIP section 03 30 02.3.3 states “Provide moist cure only for concrete in the Hangar Facility. ..." Does this include the administration areas N-W or only areas A-M? Please confirm and define the areas that require wet curing as it pertains to the "Hangar Facilities" areas A through W.

Response: Moist curing is required for the concrete in the entire Hangar Facility (Volume 7, all key plan areas A through W).

111. Reference 14 50 00 Paragraph 1.3: Would it be possible to limit shop drawings to layout and assembly drawings for the TPS due to intellectual property?

Response: The submittals indicated in the specifications will be required.

112. Reference 14 50 00 Paragraph 1.4.c: Please clarify if it is acceptable for TPS components at the platform level to be compliant to Class I Division 2 T3 requirements, and all other components designed to be used in a non-rated zone.

Response: Paragraph 1.4.c is correct as stated for where Class I Division 2 is required and where it is not required.

113. Reference 14 50 00 Paragraph 1.4.h: Can bumpers with pressure-sensitive sensors and light sensors at mast corners satisfy the requirement for an "active" collision avoidance system?

Response: No, contact is not permitted per paragraph 1.4.h, “The TPS shall have a collision avoidance system to not permit contact with the aircraft or other objects from any direction. As an additional safety feature, bumpers (safety edges) shall be included around the perimeter of the platform and designed to protect aircraft and other objects from an impact.”

114. Reference 14 50 00 Paragraph 1.4.k: this calls for 8 electrical outlets, while paragraph 2.16.c appears to call for six (four 120V and two 208V). Please clarify.

Response: Six electrical outlets (four 120V and two 208V) per TPS is correct.

115. Reference 14 50 00 Paragraph 1.4.k: this calls for a 1 ton jib crane, while elsewhere (2.11 and dwg S-036-H) it calls for a 500 pound jib crane. Please clarify.

Response: 500 pound Jib Crane on the TPS is correct.

116. Reference 14 50 00 Paragraph 1.4.m and 2.12: please clarify it would be acceptable to have seven fall arrest attachment points per platform mounted above the platform (on the mast carrier) which can serve users both at the platform level and below the platform level.

Response: Refer to response to RFI #137.

117. Reference 14 50 00 Paragraph 1.4.t: please provide information about required costs and time for Foreign Object Debris (FOD) and Dropped Object Prevention (DOP) awareness and prevention training.

Response: Subcontractor to coordinate with their general contractor for details of all of their construction site training programs.

118. Reference 14 50 00 Paragraph 2.5: please clarify if it is acceptable to provide sweeps on crane end-trucks only.

Response: Refer to response to RFI #140.

119. Specification Section 21 13 13.00 10 states UFC 3-600-01 from 2016 with Change 1 is applicable however, Change 2 was released on March 25, 2018. Please confirm Change 2 is now applicable and supersedes Change

1. Please note this revision affects dry systems which now require nitrogen generators where it previously only affected preaction systems.

Response: This document is not applicable.

120. Reference 14 50 00 Paragraph 2.8.a.8: please clarify that it will be acceptable to provide four (4) emergency egress devices on each platform, each device with the capability of lowering two operators at the same time.

Seven harnesses can be provided with each TPS.

Response: Refer to response to RFI #137.

121. Reference 14 50 00 Paragraph 2.9.a: please clarify that platform capacity lower than 3,000 pounds is acceptable, provided it will accommodate seven users with their equipment.

Response: Refer to response to RFI #143.

122. Reference 14 50 00 Paragraph 2.9.e: please clarify that sway of greater than 6" will be permitted as long as evidence can be shown it will still grant the safety of the operators.

Response: Refer to response to RFI #146.

123. Reference 14 50 00 Paragraph 2.15: are European equivalents to ASTM A325 and ASW D1.1/D1.1M requirements acceptable?

Response: It is acceptable to use European equivalents to ASTM A325 and ASW D1.1/D1.1M, provided equivalence is demonstrated in the submittal process, especially at points of interface/connection with the building structure.

124. Reference 14 50 00 Paragraph 2.16.1: please confirm that enclosures for brake electrical components, located on the carrier bridge, can be rated for ordinary location.

Response: Refer to response to RFI #150.

125. Reference 14 50 00 Paragraph 2.18.h: please confirm that only limit switches located on the platform need to be rated Class I Division 2.

Response: Refer to paragraph 1.4.c for where limit switches must comply with Class I Division 2, and where they are not required to comply with Class 1 Division 2; in short, if they are located 50 feet above the hangar floor AND never located within 5 feet of the aircraft, they are not required to be Class I Division 2 rated.

126. Reference 14 50 00 Paragraph 2.18.i: please confirm that only panels located on the platform need to be rated Class I Division 2.

Response: Refer to paragraph 1.4.c for where panels must comply with Class I Division 2, and where they are not required to comply with Class 1 Division 2; in short, if they are located 50 feet above the hangar floor AND never located within 5 feet of the aircraft, they are not required to be Class I Division 2 rated.

127. Specification Section 01 45 00.00 20 - 1.5.8 states the FPE must be an independent third party hired directly by the Prime Contractor. We believe this is Design-Build language in lieu of Bid-Build language. We believe the intent of this Contract is Bid-Build. Please confirm the FPE can be included in the Fire Suppression subcontract, and not be a first-tier subcontract, per the requirements for a Fire Protection Specialist stated in Specification Section 21 13 13.00 10 - 1.4.1 and referred to 21 13 20.00 20 as well as 21 13 22.00 20. If the FPE must be first-tier, please confirm a single QFPE is allowed to perform the work as outlined in Specification Sections 01 45 00.00 20 - 1.5.8, 21 13 13.00 10 - 1.4.1, as well as 28 31 76 - 1.7.1.1.

Response: Change specification 01 45 00.00 20 paragraph 1.5.8 to read “Fire Protection Specialist:

Provide a Fire Protection Specialist with the qualifications stated in 21 13 13 paragraph 1.4.1. Fire Protection Specialist shall perform all duties noted in division 21 specifications.”

128. Reference detail B1/ A-521-H. Please provide an elevation view for the manufactured canopy, as only a section view is available.

Response: An elevation view of the manufactured canopy is provided on elevation drawing A1 / A-202-H, NORTH COMPOSITE ELEVATION and, on elevation view A1 / A-208-H, NORTH ELEVATION.

Revise sheet keynote #2 on sheet A-208-H to read: 2. MANUFACTURED CANOPY. The drawings will be revised accordingly.

129. Detail A4 on S-004-H for “typical slab rebar coupler at column” indicates weldable couplers at each top reinforcement along spanning direction. Please clarify the intent of "slab spanning direction." Does this detail apply to all top reinforcement bars intersecting with steel columns?

Response: This detail applies to WF column webs and WF & HSS column bracing gusset plates that interfere with N-S spanning top reinforcing only.

130. Please confirm the waterflow (gpm and psi) for the pressure washer and the water cannon shown on P-137-H.

Specification Section 22 00 00 - 2.17.6 calls for the water cannon hose to be not less than 200 PSIG and the wand to be rated at 4,000 PSIG. P-614-H calls for the water cannon pump to be 20 GPM @ 100 psi. P-614-H calls for the pressure washer to have flow of 10 GPM @ 3,000 PSI. Specification Section 22 00 00 - 2.17.3.2 calls for 232 PSIG pumps.

Response: Water cannon pump duty point shall be 20 GPM @ 146 PSIG with a pump maximum operating pressure of 232 PSIG @ 194 °F. The water cannon hose and application wand shall be pressure rated at not less than 200 PSIG, in accordance with Section 22 00 00 2.17.6. Pressure washer pump duty point shall be 10 GPM @ 3000 PSIG. The pressure washer hose and application wand shall be pressure rated at not less than 4000 PSIG, in accordance with Section 22 00 00 2.17.6.

131. Reference 14 50 00 Paragraph 2.9.c: part 1 of this paragraph asks for a minimum creep lifting/lowering speed of 24 inches per minute. For motor stability we propose a MINIMUM creep speed of 36 inches per minute.

Please confirm that this is acceptable.

Response: It is acceptable to provide a minimum creep speed of 36 inches per minute.

132. Reference 14 50 00 Paragraph 1.4.L: we are not aware of a control unit that will withstand damage when dropped from the working heights of this platform system. For safe operation, the control units will have to be secured to the harness of the operator while using the platform. Please confirm that this is acceptable.

Response: It is acceptable, if capability is provided to tether the control unit to either the operator or the

TPS.

133. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.c: Will only the TPS components AT PLATFORM LEVEL be compliant to Class I Division 2 T3 requirements while ALL other components will be designed to be used in a non-rated zone?

Response: Refer to paragraph 1.4.c for where items must comply with Class I Division 2, and where they are not required to comply with Class 1 Division 2; in short, if they are located 50 feet above the hangar floor AND never located within 5 feet of the aircraft, they are not required to be Class I Division 2 rated.

134. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.h: Will bumpers installed around the platform which are equipped with pressure sensitive sensors and light sensors at mast corners which will prevent a contact between the aircraft and the TPS steel structure be considered them as "Active" collision avoidance?

Response: Refer to response to RFI #113.

135. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.k: These requirements have to be clarified because there are inconsistencies within the specification. Article 2.16 (c), the amount of power sockets is 6 (4x 120V + 2x 208V) and again 8 pcs in Article 2.17.2. The load capacity of the jib is defined to be 500 lbs in Article 2.11 and on the drawing S-036-H. Please clarify.

Response: Refer to response to RFIs #114 and #115.

136. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.l: In order to avoid the risk of dropping the remote control from the platform level causing injuries to operators located beneath or damage the aircraft or damage to remote control itself, is it acceptable for the operator to secure the remote control to his harness once the same is removed from its support?

Response: Refer to response to RFI #132.

137. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.m: With Four (4) Emergency egress devices installed on the platform. Each device will allow lowering of two (2) operators at the same time. Seven (7) harnesses will be provided with each TPS. Seven (7) fall arrest attachment point will be foreseen on the mast carrier (above the platform). These 7 points will also be usable by the operators when they’re working outside of the platform (i.e. on the wing). As such, can NO attachment points underneath the platform be acceptable?

Response: This is acceptable provided all OSHA and AFOSH standards are met with the fall arrest attachment locations provided by the manufacturer. All surfaces of the aircraft shall be serviced with fall protection from the TPS (include leading edge lifelines where required by the location).

138. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.s: Please describe the required time / costs to enter site. Are there specific trainings required to get the badge? Are these badges only valid for one day or for a longer period?

Response: Coordinate with your General Contractor for their process.

139. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 1.4.t: Please describe the required time and costs for completion of this training.

Response: Refer to response to RFI #117.

140. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.5: Wheels will be fabricated from high strength industrial plastic, and Sweeps will be installed on crane end-trucks only. Is this acceptable?

Response: Wheels may be fabricated from high strength industrial plastic, and sweeps may be installed on crane end-trucks only.

141. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.8.a.3: Reference Item #2 above.

Response: No question for which to respond.

142. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.8.a.8: Is it acceptable to provide Four (4) Emergency egress devices will be installed on the TPS platforms if each device will allow lowering of two (2) operators at the same time? Seven (7) harnesses will be provided with each TPS.

Response: Refer to response to RFI #120.

143. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.9.a: One TPS supplier has a maximum capacity of 1,650 pounds (in lieu of the 3,000 pounds specified) and rated for 7 users with equipment. Will this be acceptable?

Response: If the capacity of 1,650 pounds is the net useable capacity to the 7 users and their work equipment, then this scenario would be acceptable.

144. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.9.c: One TPS supplier will only provide creep lifting/lowering speed of 36 in/min. Will this be acceptable?

Response: Refer to response to RFI #131.

145. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.9.d: Please clarify the meaning of this article which states; The main lifting/lowering speed and cross travel speed listed is required for safety/egress requirements from the platform.

Response: This article is referring the main lifting and main cross travel speeds listed in the above paragraph 2.9.c. Mechanically operating limit switches shall be provided such that the faster speed is cut out first and afterwards the slow speed for safety/egress requirements from the platform.

146. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.9.e: Will it be acceptable if the sway of the platform during an emergency stop may not be limited to 6 inches but can still grant the safety of the operators, with evidence shown by structural calculation?

Response: There is not enough information from which this question may be evaluated. What is the proposed amount of sway and at what speed and proximity to the aircraft would this occur?

147. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.12: Reference Item #10 above.

148. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.14: A catwalk with associated access from the mast carrier will be proposed as an option. In case this option is not purchased, the access to the hoist, drives…. will have to be done with a cherry picker/man-lift from the ground. Please be aware that the installation of the catwalk and access will have an impact on the total weight of the crane. Are roof structures designed to accommodate additional weight?

Response: Yes, the roof structure is designed to accommodate the weight.

149. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.15: Are European equivalents of ASTM A325 structural fasteners and AWS D1.1/D1.1M structural welding acceptable?

Response: Refer to response to RFI #123.

150. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.16.1: Will it be acceptable if enclosures will be located on the carrier bridge and thus outside of the defined Class I Division 2 area and therefore the enclosures be rated for ordinary location?

Response: Refer to paragraph 1.4.c for where items must comply with Class I Division 2, and where they are not required to comply with Class 1 Division 2; in short, if they are located 50 feet above the hangar floor AND never located within 5 feet of the aircraft, they are not required to be Class I Division 2 rated.

151. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.17.2: Please clarify the amount of outlets which is not consistent with the definition under Article 2.16 c. The requirement of Article

2.16 c will been taken.

Response: Refer to response to RFI #135.

152. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.18.a: Reference Item #4 above.

153. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.18.h: Is it acceptable if only the limit switches that will be located on the platform will be rated Class I Division 2?

Response: Refer to response to RFI #125.

154. Reference Specification Section 14 50 00 Telescoping Platform System (TPS), Article 2.18.i: Is it acceptable if only the panels that will be located on the platform will be rated Class I Division 2?

Response: Refer to response to RFI #126.

155. Reference Specification Section 41.22.13 Jib Cranes, Article 2.1.3.b & .d: Motorized Operation – Is a Variable Frequency Drive required or Contactors?

Response: Paragraph 2.1.3.b requires a Variable Frequency Drive (which would provide speed, acceleration, and reversing control with a smoother operation). Paragraph 2.1.3.d which requires a magnetic reversing starter will be removed from the specification.

156. Reference Specification Section 41.22.13 Jib Cranes, Article 2.1.4.1: If Boom is Welded to the Mast how we will get the 200 degree rotation as requested. - Please Confirm.

Response: The basis of design is a rigid “L-shaped” assembly of boom and mast which rotate as a unit.

The hinges are mounted between the support column and the mast so that the mast rotates with the boom.

157. Reference Specification Section 41.22.13 Jib Cranes, Article 2.1.4.2.d: Mast - Should this state that Gusset to be attached to Boom Bottom instead of Mast Bottom?

Response: In the basis of design crane, the boom and mast rotate together, so the motor operation rotation arm can mount to the mast.

158. Reference Specification Section 41.22.23.19 Monorail Hoists, Article 2.7: Please confirm that the Pushbutton Station height of 2 Feet above the floor is correct?

Response: The pushbutton station height should be 42” above the floor.

159. Is it anticipated that the Door Rail Support steel shown on drawings SF-525 & 526 be field welded or field bolted to the W14x30’s that are 7’-0” below the truss bottom chords?

Response: Please refer to section/detail D1 on Sheet SF526-H for typical bolted connection detail at this condition.

160. What is the difference between: Div 27-05-14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM and Div 27-54-00 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS, They appear to be the same thing written differently?

Response: Specification 27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM addresses the requirements for the underground Cable TV Service and System for the COMBS Warehouse area of the Hangar and Specification 27 54 00 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS addresses the requirements for the roof mounted Satellite Antenna Cable TV Service and System for the Hangar.

161. According to the Anchor Rod Notes shown on drawing S-025-H, as compared to the Foundation Plans, all of the anchors appear to only have 8” of embedment, since none of the piers are designated as P0-P1, regardless of the diameter and column size. Please confirm that this is correct.

Response: As per the detail and notes on S-026-H, the embedment depth for pile type P0 thru P1 is 2’-4” and for pile type P2 thru P8 the embedment is an equation defined as “PILE CAP DEPTH” minus 8 inches. So, for example, if the pile type were 4 feet thick/deep, the embedment would be 48”-8”= 40” embedment. There are both P0 and P1 pile types on the plans and P0 thru P8 pile type designations are shown on foundation plan sheets SB101-H thru SB121-H.

162. Drawing SF118-H shows a Section D4/SF547-H which does not appear on the referenced drawing. Please advise.

Response: Please refer to Section C4/SF547-H.

163. Specifications Section 07 42 13 Metal Wall Panels on Page 11, item 2.3.2.3 Exterior Finish Coating shows two exterior finish types / thicknesses. Which of the two is required for this project?

Response: Refer to response to RFI #79.

164. Specifications Section 07 42 63 Fabricated Wall Panel Assemblies does not show any minimum thicknesses (gauge) for the metal skins for the FWP1 or FBP1 panel types. What is the minimum required thicknesses for the interior and exterior skins for each of these two panel types?

Response: Refer to response to RFI #80.

165. Specifications Section 07 42 63 Fabricated Wall Panel Assemblies on Page 12, item 2.2.3 Finish (FWP1) line c.

shows two exterior finish types / thicknesses. Which of the two is required for this project?

Response: Refer to response to RFI #81.

166. The following question has been asked by a manufacturer of cold formed metal framing. Would the Zee’s be able to substitute a 3.5” leg to match the Cee’s in order to keep the same coil width on the majority of the job?

This will help in keeping the costs down and assure availability of materials as a 12”x3” is a standard stocked size.

Respo (3.5” same

167. Please respon

170. TECH

capabi Sched submi

173. TECH

capabi Appro narrati

General De

Superseded

State: Mary

Constructio

County: Pr

BUILDING

including 4

Note: Und contracts s after Janua listed on t determinat wage rate entered int contracts s Additional www.dol.g

Modificati onse: The con leg) for Cee g coil width.

e, specify grade onse: A36 rod nse for finish/

HNICAL CON

ility and unde dule will requir tted on 11 x 17 onse: 100 tota

HNICAL CON

ility and unde oach will requir ive on 8-1/2”x onse: The pag ecision Numbe d General Deci yland on Type: Build rince George's

G CONSTRU

4 stories).

er Executive O subject to the D ary 1, 2015. If this wage det tion, if it is hig will be adjust to by the fede subject only t l information gov/whd/govco on Number 01/05/20 ntract docume girts. It is acc e, type and fini with 3” long t /painting.

NTENT, FACT

erstanding to p re more than 1 7 format in ord al items max a

NTENT, FACT

erstanding to p re more than th 11” in order to ge limit is here er: MD180058 ision Number:

ding

County in Mar

UCTION PROJ

Order (EO) 136 Davis-Bacon A this contract is termination at her) for all hou ted annually.

eral governmen to the Davis-B on contracto ontracts.

Publication Da ents show 12Z ceptable for b ish of ½” Sag r thread at each

TOR 5, PAGE

plan and sche 00 items. Wil der to properly nd can be on

TOR 5, PAGE

plan and sche he 2-page limi o properly demo eby revised to

Update to W

05/11/2018 M

MD20170058

ryland.

JECTS (does

658, an hourly Act for which t s covered by th least $10.35 urs spent perfo Please note th nt that are sub Bacon Related or requirement ate

ZS3.25x105 (3 both Zee’s and rods show on s h end. Refer to

E 7 OF AMEN

edule the com ll the Governm demonstrate th

11 x 17.

E 7 OF AMEN

edule the com tation. Will the onstrate the req

(2) double sid

Wage Determi

MD58

n…

This is the start of the file's text. The full file is on GovTribe.