Appendix B Contractor User Guide for Remedy AIM 20190523D.docx
DOCX document 6 MB Posted
- Attached to
- Multiple Award Construction Contract for Physical Security/ Access Control-Amendment 0006 Federal contract opportunity
- Solicitation number
- N3943020R2201
About this file
This document is an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for Physical Security/Access Control services. The amendment provides revisions to the basic contract PWS including new DED and appendix documents. It also contains draft amendments to the seed task order PWS. The contract is a 100% small business set-aside with a reserve for one women-owned small business. It uses a two-phase design-build selection process to award between three to five MACCs. The NAICS code is 237990 for other heavy and civil engineering construction with a size standard of $39.5 million. The solicitation is issued by the Naval Facilities Engineering Command to provide physical security and access control services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3943020R2201-0006.pdf | ||
| N39430-20-R-2201_0005.pdf | ||
| (Part 6 Index) PSAC-2_Part_6_attachments_24 Jan 2020.pdf | ||
| AVB Operational & Equipment Capabilities 28Mar19.pdf | ||
| Pre-Proposal Conference Slides_Rev1_3Jan20.pdf | ||
| PSAC-2 Seed Task NSA Orl AVB Rpl_Part_3_statement_of_work__project_program_24JAN2020.pdf | ||
| A040 RMF AA FRCB Package V3 20191211.pdf | ||
| PSAC-2 Seed Task NSA Orl AVB Rpl_Part_2_general_requirements_24JAN2020.pdf | ||
| PSAC Site Visit Sign In Sheet -final.pdf | ||
| 20191029 ATFP Ashore AVB Capability Baseline Slide.pdf | ||
| PSAC Seed Site Visit Pictures-Portfolio.pdf | ||
| PSAC-2 Seed Task NSA Orl AVB Rpl_Part_6_attachments_24JAN2020.pdf | ||
| PSAC Amendment 0004- Site Visit Portfolio.pdf | ||
| PSAC-Amendment 0003 Portfolio.pdf | ||
| PSAC Amendment 0002- Portfolio.pdf | ||
| Amendment 0001 Portfolio.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX B
Contractor User Guide for the AT/FP Ashore AIM and Remedy Systems
May 2019
Prepared for:
Naval Facilities Engineering Command (NAVFAC) Anti-Terrorism/Force Protection Ashore (AT/FP Ashore)
APPENDIX B
Foreword
This User Guide constitutes “Appendix B” for Contracts and Task Orders issued under the AT/FP Ashore Program. The guide details Contractor logistics responsibilities and AT/FP Ashore processes with respect to the reporting and handling of assets, configuration management, corrective and preventive maintenance, training, documentation, and deliverables.
In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
TABLE OF CONTENTS
| 1. Introduction | 1 |
| 1.1. The AT/FP Ashore Remedy System | 1 |
| 1.2. The AT/FP Ashore AIM Portal | 1 |
| 1.3. Accessing AT/FP Ashore Web Sites | 1 |
| 2. Contractor Responsibilities: | 2 |
| 2.1 Submitting Task Order Deliverables | 2 |
| 2.2 Asset and Configuration Management | 3 |
| 2.2.1 Submitting Data | 3 |
| 2.2.2 Change Management/Engineering Change Proposals (ECPs) | 3 |
| 2.3 Preventive Maintenance | 3 |
| 2.3.1 Submitting and Maintaining Preventive Maintenance Schedules | 3 |
| 2.3.2 Scheduling & Notification of Maintenance | 4 |
| 2.4 Corrective Maintenance | 5 |
| 2.4.1 Technical Support | 5 |
| 2.4.2 Responding to Incidents | 5 |
| 2.4.3 Updating Incidents | 5 |
| 2.4.4 Resolving Incidents | 10 |
| 3. Data Templates | 10 |
| 4. Questions | 10 |
| 5. Attachments | 10 |
| 5.1 AIM User Guide | 10 |
| 5.2 Remedy Incident Guide | 10 |
| 5.3 Remedy CDRL Submission Guide | 11 |
| Table 1 – Remedy Help Desk Ticket States | 12 |
Appendix B
1. Introduction This guide details Contractor logistics responsibilities and AT/FP Ashore processes with respect to the reporting and handling of assets, configuration management, corrective and preventive maintenance, deliverables, and project status utilizing two AT/FP Ashore Web sites, the AT/FP Ashore Remedy System and AT/FP Information Module (AIM) Portal. Details in using these systems can be found in the imbedded user guides in Section 5. Attachments.
1.1. The AT/FP Ashore Remedy System
The NAVFAC AT/FP Ashore Remedy System is a collection of computer hardware and software implemented by NAVFAC AT/FP Ashore Program Management Office (PMO) that utilizes the BMC Software, Inc. Remedy Enterprise Suite of software to provide Help Desk, Asset Management, Change Management, and Knowledge Management support. Remedy provides the following support for installed AT/FP systems:
· A Help Desk application that logs customer requests (questions, repair issues, training issues, emergencies, etc.);
· An issue resolution and tracking system;
· Automatic triggering of notifications and escalations based upon defined criteria;
· An asset tracking system;
· A preventive maintenance and inspection tracking system;
· An application that can be securely accessed remotely via the Web; and Operational Availability (Ao) tracking based upon service call life cycles.
1.2. The AT/FP Ashore AIM Portal
The AT/FP Ashore AIM System is a web based digital dashboard that provides a customized solution for AT/FP Ashore personnel that consolidates areas of cost, schedule, performance, contracts, risks, deviations, sustainment, and actions. AIM provides single-click access to analytical and collaborative tools and brings an integrated view of AT/FP‟s knowledge sources to an individual's desktop, enabling better decision making by providing immediate access to key information.
AT/FP Information Module provides a dedicated website page for each AT/FP Ashore project, as well as higher-level views for the PMO and other teams and working groups. The AIM portal is constructed in a hierarchical fashion allowing for the concatenation of data at higher levels to provide automated high-level views of Program health.
1.3. Accessing AT/FP Ashore Web Sites
Contractors shall access the AT/FP Ashore Remedy System and the AIM Portal via the Internet through secure web sites to document and complete both execution and sustainment activities related to Contract Data Requirements List (CDRL) submissions, project status, inventory tracking, technical support and equipment maintenance history (preventive maintenance, corrective maintenance, and 24-hour emergency response).
Contractors must have the ActivClient software installed on their computers for AIM and/or Remedy account requests and active accounts. ActivClient is a commercial off-the-shelf software application and is used for user authentication for these systems including the self-registration site. The ActivClient software is updated regularly and occasional patches are released; a current version/patch level is required.
The Contractor shall obtain a Public Key Infrastructure-enabled CAC with a Personal Identification Number (PIN) and a computer with the appropriate card reader and associated software/drivers to access the AT/FP Ashore websites.
Both Remedy and AIM employ “Single Sign On (SSO)” technology for user authentication and authorization and permits approved Common Access Card (CAC) holders’ access to the database.
Access to Remedy and AIM is gained by going to the following web site and submitting a request: https://sso.navatfp.sd.spawar.navy.mil/_layouts/AIMSelfRegistration/SelfRegistration.aspx
Once the request is approved, Remedy can be accessed at: https://ars.navatfp.sd.spawar.navy.mil
AIM can be accessed at:
https://aim.navatfp.sd.spawar.navy.mil
Contractors shall notify the AIM/Remedy team at aim-remedy@altusts.com when personnel leave their company and/or the AT/FP Ashore program to ensure accounts are disabled in a timely manner. Notifications should be sent in advance (preferred) stating the effective date; or at a maximum within one business day of the employee’s departure.
2. Contractor Responsibilities:
The Contractor will be responsible for the following:
· Submitting all task order deliverables including, but not limited to, asset and configuration information through the AT/FP Ashore Remedy System;
· Submitting any requested changes, in writing, to the Public Works Department/Facilities Engineering Acquisition Division/Administrative Contracting Officer (PWD/FEAD/ACO) via the standard contract process; and responding to all tasking (corrective and preventive maintenance requests) and updating the associated service calls appropriately through the AT/FP Ashore Remedy System.
· Maintaining project-related data in the AT/FP Ashore AIM Portal.
2.1 Submitting Task Order Deliverables
At a minimum, all task order CDRLs shall be submitted to the ACO and also electronically via the AT/FP Ashore Remedy System utilizing the CDRL Data Submission Form accessible in the AT/FP Ashore Remedy System Applications Console. The content and extent of task order deliverables is project specific to each individual contract/task order. A list of applicable deliverables is available in Appendix D - Data Requirements Checklist and Deliverable Expectation Document (DED) Package within each individual contract/task order.
2.2 Asset and Configuration Management
The AT/FP Ashore Remedy System will be utilized to track AT/FP assets and configuration management data. Contractors shall make submissions of asset data as specified in the Appendix D - Data Requirements Checklist and DED Package.
All submissions of data to the AT/FP Ashore Remedy System automatically generate a reference number of the transaction for tracking and reporting purposes.
Contractors will be notified electronically via email of either submission approval or requests for additional information. Approvals or requests for additional information will also be accessible through the AT/FP Ashore Remedy System/AIM Portal.
2.2.1 Submitting Data
Contractors shall submit all data relating to the configuration and management of assets electronically through the AT/FP Ashore Remedy System. Each asset record must be associated with an AT/FP Ashore project name following a pre-defined project naming convention of Principal Category, Family of Systems, Region, Base and Unique I.D. project names are provided in the individual task orders. Data fields and template spreadsheets are provided as Government Furnished Information and requirements are detailed in the CDRL requirements and associated DED, as applicable. Contractors shall make submissions of asset data as specified in the Appendix D - Data Requirements Checklist and DED Package.
Contractors will be notified electronically via email of either submission approval or requests for additional information.
2.2.2 Change Management/Engineering Change Proposals (ECPs)
Any requested changes to form, fit, function, cost, schedule, performance, system interfaces, system architecture, documentation, etc. shall be submitted via email to the NAVFAC ATFP Ashore Sustainment Director.
2.3 Preventive Maintenance
Contractors shall perform preventive maintenance as a regular part of their sustainment activities of AT/FP equipment. Detailed maintenance performance requirements will be specified in individual task orders.
2.3.1 Submitting and Maintaining Preventive Maintenance Schedules The Program Schedule for Sustainment Contracts shall be used to plan and track preventive maintenance activities for the duration of the contract. The Program Schedule includes the Preventive Maintenance Schedule milestones described in DED A002 Program Schedule and Progress Report and shall cover all sustained projects included in the contract. Each Project listed within the Preventive Maintenance Schedule includes tasks that describe the associated preventive maintenance activities and individual scheduled events, duration of each event, and the planned start and end date of each event. Each task indicates the periodicity of the event. The Preventive Maintenance Schedule shall be prepared using Microsoft Project Professional version 2013 or newer. The Microsoft Project file must include the following columns, at a minimum:
· Task Name (Title of Major Milestone, Project Name, Preventive Maintenance Task, etc.)
· Start (Planned Start Date)
· Finish (Planned Finish/End Date)
· Duration (Automatically Calculated by MS Project)
· Unique Remedy ID (The Associated Project Number when the Task Name Contains a Project Name)
· Type of PM (Hardware or Software)
The initial submission of the Program Schedule shall be submitted as a CDRL into the AT/FP Ashore Remedy System. Upon approval by the Government, the Contractor’s initial Program Schedule submission will become the approved baseline schedule in accordance with this Contract PWS. Once approved, the Sustainment Contractor shall synchronize the approved Preventive Maintenance Schedule with the AT/FP Information Module (AIM) via Microsoft Project Professional version 2013 or newer. The Contractor shall thereafter, on a monthly basis, update the Preventive Maintenance Schedule on the AT/FP Information Module (AIM) Portal to reflect the Contractor’s progress as it pertains to the Contract; however, this update does not change the approved baseline schedule that the Contractor is required to be in compliance with in accordance with this Contract PWS. The approved baseline schedule can only be changed through a formal Contract modification issued by the Contracting Officer.
In accordance with the Contract PWS, the contractor shall notify the Navy 311 Help Desk at least 30 days in advance of a preventive maintenance task in order to have a service call created and assigned back to the contractor. Note: as of 27 May 2016, AIM will trigger the AT/FP Ashore Remedy System to automatically create preventive maintenance incidents daily for any task that falls within the 30-day advance period. This service call shall be used by the Contractor to document work performed during the maintenance activity in the AT/FP Ashore Remedy System. The Contractor shall update the Work Log and resolve the service call per the PWS.
2.3.2 Scheduling & Notification of Maintenance
In accordance with the individual task order, the Contractor will conduct various maintenance planning functions.
Changes to the approved preventative maintenance schedule shall be submitted, in writing, to the PWD/FEAD/ACO via the standard contract process.
Notification to the Government of planned maintenance events will be submitted in accordance with timeframes specified within individual task orders. Notification must include the following information:
· Date/Time Duration of Maintenance/Repair
· Systems Impacted
· Nature of Work to be Performed
· POC Information
· Estimated Time to Completion
· Alternative Dates
· Concurrence/Non-Concurrence
2.4 Corrective Maintenance
As specified in the individual task order, the Contractor will provide response in the form of technical support to place a piece of equipment or system back in service after a failure or breakdown has occurred.
Contractors will most often be assigned corrective maintenance issues via the creation and assignment of a service call by the AT/FP Ashore Help Desk as a result of an end-user reporting an outage or support inquiry.
If the AT/FP Ashore Help Desk is unable to resolve the user’s problem on first call, the incident will be assigned to the appropriate Contractor based on the identified equipment/system in question. The Contractor will then be notified electronically via email of the incident assignment.
2.4.1 Technical Support
Contractors shall provide 24/7 technical support via their established account within the AT/FP Ashore Remedy System.
Within the AT/FP Ashore Remedy System, an incident is synonymous with a technical support request, a service call, or a service request. See individual task orders for details in responding to service requests.
The AT/FP Ashore Remedy System will maintain a history of all incidents. Within each incident, Contractors shall create work log entries documenting each action taken to resolve the issues; history information will be captured in the AT/FP Ashore Remedy System for historical, statistical and reporting purposes.
2.4.2 Responding to Incidents
Upon incident assignment, Contractors shall acknowledge receipt of the service call by contacting the requesting end-user and changing the status of the incident in the AT/FP Ashore Remedy System from Assigned to Work in Progress, Pending, or Resolved, as appropriate. See Table 1, Remedy Help Desk Ticket States, for an explanation of the various states of incidents and associated timers.
The work log in the AT/FP Ashore Remedy System must indicate that the Contractor has contacted or attempted to contact the customer and the work performed or plans for resolution. Contractors will respond to incidents within the timeframe specified in the individual task order.
2.4.3 Updating Incidents
The Contractor shall update assigned service requests in the AT/FP Ashore Remedy System on a daily basis to show progress and current status of the service request. At a minimum, updates to the work log shall include the following information as applicable to the type of incident/type of work log update:
· Date/Time Duration of Maintenance/Repair
· Systems Impacted
· Nature of Work to be Performed
· POC Information
· Anytime Action is Taken to Include:
· Parts Ordered
· Site Visits
· Parts Installed
· Testing
· Requester Contact (phone, e-mail, etc.)
· Shipping Tracking Numbers and Estimated Delivery Dates
· Material Delivery Coordination with N6/FECTLs/Operator, etc.
· Estimated Repair Date
· Required Coordination (i.e. Tower Crews, Space Access, etc.)
· Equipment Changed/Replaced
· Asset Information (location, serial number, part number, etc.) as required by CDRL A033 Completed Asset Data Template
· Related Company-Specific Trouble Call Number
Optional information included might consist of recommendations for changes in maintenance procedures, periodicity, or equipment substitutions. This information will be captured in the AT/FP Ashore Remedy System for historical, statistical, and reporting purposes.
Incident Data Accuracy Requirements For every assigned incident, verify the associated Project on the ATFP tab for accuracy. If incorrect, change the Project information and create a Work Log entry.
Update the Summary and Description if it is not complete or is inaccurate once more information is known.
Properly utilize the Operational and Product Categorization fields on the Classification and Resolution tabs.
Relate effected assets and software using the Relationships tab.
If requesting reassignment, provide detailed information as to why; do not simply state that this issue or asset or project is not covered under the contract. Provide details as to why the incident should be reassigned and to whom/group/organization.
Information provided in Work Log entries and the Resolution field should be complete enough that the incident is easily auditable and understood by all parties. Resolution information will be gathered and will become searchable to assist others in resolving similar incidents. Incidents should be documented thoroughly so that anyone familiar with the system or not, by reading the applicable fields (Problem Description, Work Logs, and Resolution) could understand the root cause, investigation processes, impact to system, customer, and program, time delays, path to resolution and applicable financial costs.
Change the Impact and Urgency to modify the Priority as applicable.
The Contractor shall refer to and follow the processes/procedures listed in the Ticket Handling Guide below for tickets falling into the categories listed:
| Incident Cause/Incident Result |
| Incident Handling Guidance |
| Alternate Incident Handling Guidance |
| Alarm generated due to an operator not being logged on and the position not being occupied. |
| Once confirmation is received that the operator is not logged in and the position is not occupied, indicate so in the Work Log, update, and resolve the incident. |
| AT&T link or circuit flapping (PS-Net issue). |
| Once confirmation is received that the issue is a PS-Net issue, and the outage may cause an AT/FP system to not function properly beyond the Service Provider's required resolution time, contact PS-Net NOC (877-398-9476 or 202.433.9402) to determine a PS-Net ticket has been opened. Indicated the PS-Net ticket number in the Work Log, and waiver the ticket. Do not resolve the incident. Upon PS-Net ticket resolution, ensure full restoration of that effected AT/FP system, indicate so in the Work Log, update and resolve the incident. |
| Once confirmation is received that the issue is a PS-Net issue, but it is determined that the outage will not cause an AT/FP system to not function properly beyond the Service Provider's required resolution time, indicate assessment in the Work Log, and resolve the ticket. |
| Customer requests cancellation of incident. |
| Indicate so in the Work Log, update the incident, choose the Resolution Categorization Tier 1, Tier 2, and Tier 3 of "Cancellation, Non ATFP Issue, Cancelled", and resolve the incident. Ensure to capture the contact information for the person requesting the cancellation in the ticket. The incident will be removed from metrics and metric/trend reports. |
| DISA circuit issue. |
| Once confirmation is received that the issue is a DISA Circuit issue, and the outage may cause an AT/FP system to not function properly beyond the Service Provider's required resolution time, contact PS-Net NOC (877-398-9476 or 202.433.9402) to determine a PS-Net ticket has been opened. Indicated the PS-Net ticket number in the Work Log, and waiver the ticket. Do not resolve the incident. Upon PS-Net ticket resolution, ensure full restoration of that effected AT/FP system, indicate so in the Work Log, update and resolve the incident. |
| Duplicate incident. |
| Indicate so in the Work Log, relate this incident to the duplicate incident(s) in the Relationship tab of the incident, update the incident, choose the Resolution Categorization Tier 1, Tier 2, and Tier 3 of "Cancellation, Duplicate, Incident", and resolve the incident. |
| Infrastructure issue, third party damage, or third party vendor (not related to the service provider) required to resolve issue that is affecting an AT/FP system. |
| Submit a waiver against the incident indicating so. The incident will be reassigned appropriately. The incident may be reassigned back once the issue has been resolved by the third-party vendor. If so, verify that the system is functioning as it should, update and resolve the incident. |
| Invalid incident created by Navy311. |
| Submit a waiver against the incident requesting reassignment. ATFP Support will research the request and will either reject or approve and reassign the incident. |
| Needs to be assigned to another AT/FP Service Provider. |
| Use the Incident reassignment feature in Remedy to reassign the incident to the Navy311 Help Desk (within the incident, click on Functions in the far left column, click on Auto Assign, update the Work Log with as much information as possible to help Navy 311 understand the reason for reassignment, and which AT/FP Ashore Service Provider should receive the incident, and Save the incident). Generate an email to Navy 311 and copy the Government Contracting Officer Representative and copy the NAVFAC AT/FP Ashore Help Desk Manager referencing the incident number, reason for reassignment, and ask them to reassign to the correct Service Provider. |
| Outside interference / illegal carriers. |
| Submit a waiver against the incident indicating so. Once confirmation is received that the issue has been resolved, indicate so in the Work Log, update and resolve the incident. If the outage may cause an AT/FP system to not function properly beyond the Service Provider's required resolution time, do not resolve the incident. Instead, submit a waiver against the incident, and manage the incident through resolution of the outage. Then ensure full restoration of the effected AT/FP system, indicate so in the Work Log, update and resolve the incident. |
| Planned power outage. |
| Submit a waiver against the incident. Once the power has been restored, verify that the system is functioning as it should, update and resolve the incident. |
| Unplanned power outage. |
| Submit a waiver against the incident indicating so. Once confirmation is received that the issue has been resolved, indicate so in the Work Log, update and resolve the incident. If the outage may cause an AT/FP system to not function properly beyond the Service Provider's required resolution time, do not resolve the incident. Instead, submit a waiver against the incident, and manage the incident through resolution of the outage. Then ensure full restoration of the effected AT/FP system, indicate so in the Work Log, update and resolve the incident. |
| Problem corrected itself. User cancelled. |
| Indicate so in the Work Log, update the incident, choose the Resolution Categorization Tier 1, Tier 2, and Tier 3 of "Cancellation, Non ATFP Issue, Cancelled", and resolve the incident. Ensure to capture the contact information for the person requesting the cancellation in the ticket. The incident will be removed from metrics and metric/trend reports. |
| PSNet issue/outage. |
| Once confirmation is received that the issue is a PS-Net issue, and the outage may cause an AT/FP system to not function properly beyond the Service Provider's required resolution time, contact PS-Net NOC (877-398-9476 or 202.433.9402) to determine a PS-Net ticket has been opened. Indicated the PS-Net ticket number in the Work Log, and waiver the ticket. Do not resolve the incident. Upon PS-Net ticket resolution, ensure full restoration of that effected AT/FP system, indicate so in the Work Log, update and resolve the incident. |
| Resolved by the customer. |
| Indicate so in the Work Log, update the incident, choose the Resolution Categorization Tier 1, Tier 2, and Tier 3 of "Cancellation, Non ATFP Issue, Cancelled", and resolve the incident. Ensure to capture the contact information for the person requesting the cancellation in the ticket. The incident will be removed from metrics and metric/trend reports. |
| Scheduled PSNet maintenance. |
| Submit a waiver against the incident. Once the network has been restored, verify that the system is functioning as it should, update and resolve the incident. Be sure to capture POC info for PS-Net. |
| Project/System/Asset not sustained by ATFP. |
| Submit a waiver against the incident in conjunction with request for reassignment to ATFP Support, who will research the request and either reject or approve and reassign the incident. |
2.4.4 Resolving Incidents
A service request is defined as resolved when the equipment/system in question is restored to an operable condition that meets the originally specified performance requirements of the AT/FP Ashore program and the incident within the AT/FP Ashore Remedy System has been updated with a status of Resolved.
Refer to Incident Incident Data Accuracy Requirements in Section 2.4.3 above.
A completed Customer Signoff Sheet shall be uploaded to the Customer Signoff Sheet attachment field of the incident form in Remedy prior to setting the status of the incident to Resolved.
If one or more parts/components were replaced as part of the corrective maintenance action, a completed Repair/Replace form shall be uploaded to the Repair/Replace Form attachment field of the incident form in Remedy prior to setting the status of the incident to Resolved.
The Customer Signoff Sheet and Repair/Replace Forms are Government Furnished Information.
Incidents shall be resolved within the timeframe specified in individual task orders.
3. Data Templates Data templates are provided as Government furnished information. Data templates shall be utilized to import required data into the AT/FP Ashore Remedy System. Please refer to the Contract or Task Order, CDRL/DED A033 Completed Asset Data Template and Task Order Appendix D - Data Requirements Checklist and DED Package of the individual task order.
4. Questions Questions regarding the use of the AT/FP Ashore Remedy System or AIM Portal may be submitted to ATFPSustainmentProgram@navy.mil.
5. Attachments The following attachments are provided for additional reference with regard to the use of the AT/FP Ashore AIM and Remedy Systems.
5.1 AIM User Guide
5.2 Remedy Incident Guide
5.3 Remedy CDRL Submission Guide
Table 1 – Remedy Help Desk Ticket States Remedy Help Desk Ticket States
STATUS
MEANING
AUTOMATICALLY POPULATED FIELDS
TIMERS AND ESCALATIONS
New
New service call that has not been assigned for action.
· Create Date
· Audit Trail
· Ticket escalation if not assigned.
Assigned
Service call has been assigned for action but has not been acknowledged by the assignee.
· Assigned Date
· Acknowledgement time clock starts. Resolution time clock starts.
· Ticket escalation if status is not set to Work In Progress, Pending, or Resolved within Task Order requirements.
Work In Progress
Service call resolution is in progress.
· Audit Trail
· Acknowledgement time clock stops.
· Resolution time clock continues.
· Ticket escalation if not resolved within Task Order limits.
Pending
Service call is in a hold state due to external factors.
· Pending Date
· Resolution time clock continues (minus approved Waiver time).
· Pending time clock starts.
· Ticket escalation if not resolved within Task Order requirements (minus approved Waiver time).
Resolved
Issue stated in the service call has been resolved and item affected has been returned to full service.
· Resolved Date
· All time clocks stop.
· If necessary, service call can be reopened or reassigned for additional work.
Closed
Service call has been closed.
· Closed Date
· After follow-up and validation, the service call is closed. Once closed, it cannot be reopened or modified.
image1.emf
AIM User Guide
27 January 2014 (Revised December 2014)
27 January 2014
AT/FP Ashore
Program Management Portal
AIM User Guide Service Providers ii AT/FP 27 January 2014 (Revised December 2014)
Table of Contents
1 Introduction
2 Logging into the AIM Site
2.1 Access to AIM for New Users
2.1.1 AIM Account Request Form
3 AIM Home Page: The “Enterprise Page”
3.1 Navigational Links
3.2 Reports and Status Area: Enterprise Level
3.2.1 Management Reports
3.2.2 Sustainment Reports
3.2.2.1 Open Ticket Report
3.2.2.2 Sustainment Policy
3.2.3 Project Status
3.2.3.1 Project List
3.2.3.2 CDRL Status
3.3 General Navigation within AIM
3.4 Regional Tabs
3.5 Display the Region’s Installations
3.6 The “Installation Page”
4 Project Schedule Updates and the Monthly Status Report
4.1 Project Schedule Updates
4.1.1 View the Milestones and Access the Project Schedule
4.1.1.1 Project Page
4.1.1.2 View the Project Milestones
4.1.1.3 Access the Schedule
4.2 Working the Schedule Workbook
4.2.1 Adjust Columns with the Slide Bar
4.2.2 Edit information within the Columns
4.2.3 Schedule Header Fields
4.2.3.1 Title Field
5 Contract Data Requirements Line Item Responses and Feedback
5.1 On the CDRL Trail
5.1.1 CDRLs are Uploaded to Remedy by Service Providers, then Pushed by Remedy to AIM
5.1.2 Reviewers Notified of CDRL Submission and Review Requirement iii
5.1.3 Reviewers Comment and Recommend Approval or Rejection
5.1.4 Service Providers MUST Acknowledge and Answer Reviewer Comments
5.1.5 Service Providers Respond to Review Comments
5.2 Follow along a Typical CDRL Review Process, Step-by-Step
5.2.2 CDRL Comments from the Installation Page
5.2 The CDRL Item is submitted for Approval through Remedy
5.2.3 Remedy Launches Reviewer Notifications with Links to the Referenced Review Page
5.2.4 Reviewers Review and Comment on CDRL Items
5.3.1 How to Log in to Review CDRL Status
5.4 How to Respond to CDRL Comments
iv
List of Figures
Figure 1. Digital Certificate Window USG Warning and Consent Banner AT/FP Information Portal Home Page Figure 2. Warning Banner Figure 3. Account Request Form Figure 4. Email Link on Acknowledgement Form Figure 5. Sample Acknowledgement Email Figure 6. Sample Confirmation Email Figure 7. Enterprise Page Figure 9. Open Ticket Download Figure 10. Regional Tabs Figure 11. NDW Regional Home Page Figure 12. CNRNDW Installations Figure 13. The Enterprise Home Page compared to the Regional Home Page Figure 14. List of NDW Installations Figure 15. Naval District Washington Region Page Figure 16. Navigate back to the Home Page Figure 17. Enterprise Page to the Project Page to Access the Project Schedule Figure 18. Project Milestones: Baseline and Actual Dates Figure 19. Installation Schedule Workbook Figure 20. Schedule Workbook Figure 22. “Title” Field Figure 23. “Start Date” Field Figure 24. Click to Open the “Calendar Tool” Figure 25. “Due Date” Field Figure 26. “% Complete” Field Figure 27. Task Status Drop Down Selections Figure 28. Priority Field Ranking Selections Figure 29. Predecessor Field Selections for SOVT Figure 30. Connectors on POAM Figure 33. Notification for CDRL Review Figure 34. CDRL Approval (with Comments) Notification Figure 37. CDRL Deliverables Link Figure 38. Email link to CDRL under review Figure 40. CDRL Evaluation Report file:///C:/Users/gjdevlin/Documents/Documentation%20Schedule/AIM%20User%20Guide%20%20SVC%20providersdraft%2027jan2014%20-%20Revised%20December%202014.docx%23_Toc409078480 file:///C:/Users/gjdevlin/Documents/Documentation%20Schedule/AIM%20User%20Guide%20%20SVC%20providersdraft%2027jan2014%20-%20Revised%20December%202014.docx%23_Toc409078481 file:///C:/Users/gjdevlin/Documents/Documentation%20Schedule/AIM%20User%20Guide%20%20SVC%20providersdraft%2027jan2014%20-%20Revised%20December%202014.docx%23_Toc409078482 file:///C:/Users/gjdevlin/Documents/Documentation%20Schedule/AIM%20User%20Guide%20%20SVC%20providersdraft%2027jan2014%20-%20Revised%20December%202014.docx%23_Toc409078484
1 Introduction
The AT/FP Information Module (AIM) is the online platform for the collection, aggregation, and analysis of data relating at AT/FP Ashore Program and Projects.
AIM is a web-based digital dashboard providing a customized solution for AT/FP Ashore personnel consolidating areas of cost, schedule, performance, contracts, risks, deviations, sustainment, and actions. AIM provides single-click access to analytical and collaborative tools and brings an integrated view of AT/FP’s knowledge sources to an individual's desktop. This immediate access to key information enables better decision making.
AIM provides a dedicated website page for each AT/FP Ashore Project, as well as higher-level views for the BMT, IPTs and working groups. The AIM portal is constructed in a hierarchical fashion allowing for the concatenation of data at higher levels to provide automated high-level views of Program health.
In this User Guide, we will be exploring options available in AIM for Service Providers. We will cover gaining access to AIM, logging into the AIM Site, and details regarding Project Schedule Updates and Contract Data Requirements List (CDRL) processing and reviews, and some general information about other areas contained in AIM.
2 Logging into the AIM Site
To log into the AIM site: type Contractors can view CDRL items which have been uploaded into Remedy and then transferred to AIM by accessing AIM. Use this link (CTRL+click to activate the link) (https://aim.navatfp.sd.spawar.navy.mil) or enter the address into your internet browser.
You will need to use your Common Access Card (CAC)1 to gain access to the website. You should see this window asking for your Certificate. Select your name and click “OK.”
Figure 1. Digital Certificate Window
Next, a window will open and you will enter your CAC Personal Identification Number (PIN). Click “OK” to enter the AIM Website.
1 AIM can only be accessed using a Common Access Card (CAC). Obtain a CAC through your local Government Contact.
https://aim.navatfp.sd.spawar.navy.mil/
You may see the following USG Warning and Consent (Banner) Message. Click “OK, Proceed to Application at the bottom of the message.
USG Warning and Consent Banner
If your permissions are properly set, you should see the AT/FP Information Portal Home Page, shown below.
AT/FP Information Portal Home Page
2.1 Access to AIM for New Users
If you are a new user, you will automatically be redirected to the Self-Registry Site.
Figure 2. Warning Banner
Click on the “OK, Proceed to Application” bar again. You should next see the “Account Request Form.”
We’ll run through some of the peculiarities of this form to help ensure you enter the correct information.
2.1.1 AIM Account Request Form
Figure 3. Account Request Form
New Users must complete the Account Request form to gain access to AIM. The request will be submitted to the Approving Manager who will determine your level of access.
Be sure to complete all the required information, and be sure you are entering correct information, or your request will be denied.
For instance, if you complete your form and select that you want access to both Remedy and AIM, but you are only authorized for access to AIM, your request will be rejected. If you specify the incorrect User Group, your request will be rejected. In both instances, you will need to submit a new request with the correct User Group specified if you wish to gain access to either system.
Rank
Select an appropriate “Rank” from the drop down listing.
If you leave the default (dash) or you select “Other” from the drop down list, no rank will be listed.
First Name, Last Name
Your First and Last Name should be pre-populated by information contained in your Common Access Card (CAC).
Notice it is “grayed out” and cannot be changed.
Email Address
Enter your email address.
This address is where you will be contacted when your AIM request is either approved or rejected, and is what will show up on the “Contact List.” It will also be where the system will send any automatic notifications in the future.
Phone
Enter your phone number. Please include the area code.
Support Region
Select your Support Region. Expand the drop down menu and select your Support Region from the listing provided.
Type of Account
Select your “Type” of Account. There are four types of accounts from which to choose: DoD Government, Non-DoD Government, DoD Contractor, and Non-DoD Contractor.
Select the appropriate type of account you need.
Justification/Reason/Area of Support
Enter a brief justification for your request.
While this fill in box can accept any number of characters, please try to keep your reasons brief and to the point.
Sponsor/POC Information
Please complete the information requested.
You will need to enter your Sponsor, their Email and phone number.
Account Access Selection
Please select which system you wish to access.
Note:
If you select both AIM and Remedy but are only authorized for one system or the other, your request will be rejected. You will need to resubmit your request a second time, seeking access to the appropriate system.
Submit your Request
When you are finished filling the form fields, click “Submit” in the lower left corner of the form. If you have made no errors that need to be corrected, you will see this “Acknowledgement Form.” This form summarizes your submission information.
This form lets you know your request has been successfully submitted. If you have immediate questions, you can use the AT/FP Contact Link (circled) on the form to request assistance.
Email link
Figure 4. Email Link on Acknowledgement Form
Acknowledgement and Confirmation Emails
You should receive an “Acknowledgement Email” which lets you know that your request has been submitted, and letting you know that it should take one or two days to process your request.
There is a link provided if you have further questions.
Confirmation of Approval Email
You should receive an email that notifies you that your account has been approved, and you are cleared to enter Aim.
The email will provide you the AIM link.
Welcome to AIM!!
Figure 5. Sample Acknowledgement Email
Figure 6. Sample Confirmation Email
3 AIM Home Page: The “Enterprise Page”
Your first view of the AIM Website after you log in should be the Enterprise Page, shown below.
Figure 7. Enterprise Page
3.1 Navigational Links
On the left side of your screen, there is a list of “Navigational Links” which take you to specific Team-focused areas of the AIM System, as well as the AT/FP Document Library, containing forms, contracts, task orders, and other AT/FP-related Documents.
3.2 Reports and Status Area: Enterprise Level
The large area in the middle of the screen is the Reports and Status Area.
Depending on the level of your access to the AIM System, you will see graphic links to reports and status update areas related to your responsibilities. Click the associated graphic to access Management Reports, Sustainment Reports, or Project Status information.
Navigational Links
Reports and Status Area
3.2.1 Management Reports
Management Reports provide graphical representations of the status and health of AT/FP Ashore Projects by Capability Area which are planned, in process, and sustained world-wide.
Management Reports include the Quarterly Status Report, Capability Slides, and ROP. The Quarterly Status Report is prepared in advance of the Quarterly Execution Review of the AT/FP Program by the Program Management Office (PMO).
3.2.2 Sustainment Reports
Sustainment Reports provide management with in-depth information regarding assets, response times, different maintenance functions, or any deviations from the project schedule. Sustainment Reports include the Open Ticket Report and Sustainment Policy.
We will discuss each of these reports in the subsections below.
3.2.2.1 Open Ticket Report
The AT/FP Ashore Help Ticket System allows AT/FP to expedite incident resolution by providing ready access to common solutions, known errors, and workarounds in a tightly-integrated knowledge base. The Open Ticket Report is a snapshot in time and details all the problems at the point in time, and what is being done to resolve the issues.
Click the Open Ticket Report Icon. This will be a document covering Help Desk Tickets in an Excel Worksheet, as shown below. You will be prompted to either open or save the file. If you wish to just view the Plan, click “Open.” If you wish to save the file to your computer, click “Save.”
Note This file is fairly large, so it may take a minute or two for your system to open and display it.
Again, to return to the Enterprise Page from this screen, click the “x” in the upper right corner to close the report, and you will be on the Enterprise Page once again.
3.2.2.2 Sustainment Policy
Click the Sustainment Policy Icon.
The Sustainment Policy is a guide that identifies NAVFAC AT/FP Sustainment responsibilities and what areas are the responsibility of CNIC N6, PWO, etc.
The Sustainment Policy is a living document and is revised often.
3.2.3 Project Status
Project Status includes Project List, CDRL Status and APM Report. We will discuss each of these areas in the subsections below.
Figure 9. Open Ticket Download
3.2.3.1 Project List
Click the Project List Icon. You will access a listing of all AT/FP Ashore Projects.
3.2.3.2 CDRL Status
Click the CDRL Status Icon. This area provides an interactive report of CDRL records. The report can be sorted or filtered through the column headings.
3.3 General Navigation within AIM
Note This User Guide will focus on areas you will be involved with as a Service Provider.
While the Remedy System will be the data collection and storage tool, you can think of AIM as your decision, tracking, and review tool. You can use the different links and tabs to access information collected and displayed to provide you information necessary to oversee the programs and projects you are managing. You can also update schedules, post and circulate/revise documents and interact with Customers as your Program and projects progress.
We will start by running through the various tabs at the top of the page.
3.4 Regional Tabs
You will see a row of Regional Tabs across the top of your Home Page. Click one of the Regional Tabs to open that Region’s Home Page (We will use NDW as an example).
Figure 10. Regional Tabs
From the Regional page, you can access a number of reports and documents concerning projects within the selected Region. In the example below, we’ve selected the “NDW Regional Home Page.”
Figure 11. NDW Regional Home Page
3.5 Display the Region’s Installations
Hover your cursor over the Regional Tab to see the list of Installations covered within that Region. Using our NDW example, hovering over the Regional Tab should display the list of seven installations, as shown below.
Figure 12. CNRNDW Installations
You may notice that while it looks very similar to the Enterprise Home Page (the first page you see when you log into the AIM System), your Regional Home Page is slightly different.
You’ll notice there are fewer graphic links in the Reports and Status Area, right off the bat.
Additionally, there are far fewer links in the Navigational Area on the left side of the page.
Figure 13. The Enterprise Home Page compared to the Regional Home Page
Regional Home Page
Enterprise Home Page
Navigational Links
We’ll use Naval District Washington (NDW) as the sample region in AIM. As we can see, this Command includes the following locations (If you hover your cursor on the Region Tab, the drop down list of installations or locations will appear. An example is shown below--the NDW list of installations):
JB Anacostia-Bolling
NAS Pax River
NSA Annapolis
NSA Bethesda
NSA South Potomac
NSA Washington
Reg Deploy
Figure 14. List of NDW Installations
Note:
You may notice that after you have clicked to access a location from the listing, it remains a different color when you return. This is an informal “Bookmark” that will remain until you clear your “cookies.”
Below the Region Home Page graphics, you’ll see a full listing of all Installations within the Region you have selected.
Figure 15. Naval District Washington Region Page
From the listing below the graphic links, select the Installation in which you are interested.
RoadMap! Getting Back Home
Navigation can be a little confusing when you are within the subordinate areas within AIM. We’ll point out how to get back to the main page, also called the “Enterprise Page,” from the deeper inroads as we go along.
For instance, you’re on the Installation Page for the NDW Region, in this example.
To get back to the Home Page (the Enterprise Page), look for the small File Folder icon in the upper left corner, next to the words “Site Actions.” Click once, and you display the file structure of your location…you can click on any of the strings in the listing to go back— click “AT/FP Information Portal” to go back to the Enterprise Page, the AIM Home Page you started with when you first logged on.
Figure 16. Navigate back to the Home Page
3.6 The “Installation Page”
From the Regional Page, you can access any of the Projects underway at the Installations which make up the “Region.”
4 Project Schedule Updates and the Monthly Status Report
As a service provider, you will be making regular monthly updates to the official Schedule (also known as the Plan of Action and Milestones [POAM]) after the initial submission and approval of your CDRL A002, Program Schedule and Status Report.
The Initial Schedule is part of the Contract Data Requirements List (CDRL) of items required by your task order. That Initial Schedule is uploaded through the AT/FP Ashore Remedy System, and goes through a series of reviews before it is approved.
After Approval of your A002, you must enter the approved “Start” and “Finish” dates for the major milestones in AIM.
All CDRL Items are uploaded and stored within Remedy! Remedy will ONLY push .pdf version documents to AIM…so you must upload a .pdf version of your document and the native file type as specified in the associated DED. Requirement.
Again, You MUST upload the original document format (for instance, your MSR is probably developed originally in MSWord, so you may upload the MSWord file to Remedy, and you must ALSO upload a .pdf version of the document.
All documents can be viewed in AIM, but they must be uploaded into Remedy to set off the timers and approval chains required by contract agreements.
“Baseline” Schedules are the original, approved Plan of Action and Milestones (POAMs). At this point, the approved dates are called “Baseline” dates. These are set as they are initially submitted and will not be adjusted within AIM. As you progress through the actual schedule of the project, you will be updating and changing “Actual dates.” Just keep in mind the “Baseline” will always be “set in stone” and will not change as you encounter obstacles and conduct the project taskings.
4.1 Project Schedule Updates
Per your Contract requirements, you are required to enter monthly updates to the schedule. You will be entering and adjusting “Actual” schedule dates, and adding any comments and explanations necessary. So let’s get started. First, we’ll go through the Project Schedule Update.
4.1.1 View the Milestones and Access the Project Schedule
You can access any Project’s approved Schedule by first going directly to that Project’s Page. Starting from the Enterprise Page, select the Program from the Navigational Links on the left side of your screen (we’ll use C4I as an example). Click “C4I,” then select the Project (C4I Alarm Sys, in the example below).
Figure 17. Enterprise Page to the Project Page to Access the Project Schedule
4.1.1.1 Project Page
When you open the Project Page (as you did by clicking the Project Name from the listing), you are looking at a “snapshot” view of the “health” of the selected Project.
In the first quadrant, you will see that a listing of Events/Comments/ and related Actions is building. Events that happen, or risks that could threatened the smooth execution of your project efforts may be entered and explained here.
4.1.1.2 View the Project Milestones
You’ll see the Milestones chart at the bottom right corner of your page. The milestones are the common building blocks of your Project. The Baseline Dates are set by the initial submission and approval of the Official Schedule (the POAM, CDRL # A002).
1. Select the Program
2. Choose the Project
3. View Milestones
Figure 18. Project Milestones: Baseline and Actual Dates
These are loaded from the accepted Program Schedule CDRL (A002) submitted through the Remedy System.
4.1.1.3 Access the Schedule
To access the full Schedule, look to the right side of your screen, and select “Schedule” from the Navigational links. You will open the “Schedule Workbook,” as shown below.
The “Actual” dates are those which reflect the dates these events actually occur. When you update the schedule, the “Actual” dates will reflect your changes. “Baseline” dates will not change, unless they go through the Project Deviation Request process. (add reference to section later)
Figure 19. Installation Schedule Workbook
4.2 Working the Schedule Workbook
Now that you’ve found the Project Schedule, let’s look at some of the features of the Schedule Workbook.
Open the Schedule Workbook
4.2.1 Adjust Columns with the Slide Bar
To view any of the fields fully, you can move the “Slide Bar” to expand the column area of the schedule, as shown in the top image. Move the slide bar by hovering your cursor over it, and clicking and holding while dragging (to the right) to expand the area. The bottom image shows the full selection of columns available.
Figure 20. Schedule Workbook
Each of the columns can be expanded/contracted in the same way. You can expand the column to show the full text entered, or you can contract it to move it out of the way if it is not needed.
4.2.2 Edit information within the Columns
You can go in and make edits to any of the columns—your level of permission within the AIM system will allow you to make these changes. You can enter and update the Start Date, the Due Date, the % Complete, the Task Status, Priority, the Predecessors and Assigned to areas. We’ll run through each of these column areas in the subsections below.
Slide Bar
Expanded View
4.2.3 Schedule Header Fields
As your cursor hovers over any of the column headers, the field will “glow” yellow, letting you know that field is active. You will see a small “down arrow” or “carat” letting you know you can expand the field to explore options for that particular entry.
4.2.3.1 Title Field
The “Title” field is the pre-set title of the…