N3220521R4225
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
ACRONYM TABLE
| ABIH |
| American Board of Industrial Hygiene |
| ABR |
| Agreement for Boat Repair |
| ABS |
| American Bureau of Shipping |
| ACO |
| Administrative Contracting Officer |
| AGR |
| Additional Government Requirements |
| AIHA |
| American Industrial Hygiene Association |
| CCO |
| Contract Change Order |
| CDRL |
| Contract Data Requirements List |
| CD-ROM |
| Compact Disc Read-Only Memory |
| CFM |
| Contractor Furnished Material |
| CFP |
| Contractor Furnished Property |
| CFR |
| Condition Found Report |
| CFR |
| Code of Federal Regulations |
| CIH |
| Certified Industrial Hygienist |
| CLIN |
| Contract Line Item Number |
CONUS
CPARS
Contiguous United States Contractor Performance Assessment Reporting System
| DBIDS |
| Defense Biometric Identification Systems |
| DFARS |
| Defense Federal Acquisition Regulation Supplement |
| DOD |
| Department of Defense |
| DOD SAFE |
| Department of Defense Secure Access File Exchange |
| DON |
| Department of the Navy |
| ESRS |
| Electronic Subcontract Report System |
| FAPIIS |
| Federal Awardee Performance and Integrity Information System |
| FAR |
| Federal Acquisition Regulation |
| FBLR |
| Fully-Burdened Labor Rate |
| F/CC |
| Fibers Per Cubic Centimeter |
| FPCON |
| Force Protection Condition |
| FTR |
| Federal Travel Regulations |
| G&A |
| General and Administrative |
| GFI-TD |
| Government Furnished Information – Technical Data |
| GFM |
| Government Furnished Material |
| GFP |
| Government Furnished Property |
| GPE |
| Governmentwide Point of Entry |
| ISO |
| International Organization for Standardization |
| JTR |
| Joint Travel Regulations |
| LLTM |
| Long Lead Time Material |
| LPTA |
| Lowest Price Technically Acceptable |
| M&IE |
| Meals and Incidental Expenses |
| MSC |
| Military Sealift Command |
| MSCREP |
| Military Sealift Command Representative |
| MSRA |
| Master Ship Repair Agreement |
| MTA |
| Mid-Term Availability |
| NCACS |
| Navy Commercial Access Control System |
| NDA |
| Non-Disclosure Agreement |
| NSP |
| Not Separately Priced |
| PAT |
| Proficiency in Analytical Testing |
PDF
PII
Portable Document Format Personally Identifiable Information
| PPE |
| Principle Port Engineer |
| RFC |
| Request for Specification Clarification |
| ROH/DD |
| Regular Overhaul/Dry-Docking |
| SECNAV |
| Secretary of the Navy |
| TPSN |
| Time Phased Sequencing Network |
| TWA |
| Time-Weighted Average |
| USCG |
| United States Coast Guard |
| USNS |
| United States Naval Ship |
SCOPE OF WORK
1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS COMFORT (T-AH 20) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.
c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.
f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.
j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:
1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.
2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.
5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.
8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.
10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
· Pier, with services in place, accessible to the CLASS size ship for berthing
· Structural Shop
· Machine Shop
· Pipe Shop
· Electrical/Electronic Shop
· Carpentry Shop
· Rigging Equipment
· Dry-dock – when required for docking of vessel in performance of the specification
11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.
c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.
4. Asbestos removal requirements.
a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.
b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.
c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).
d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.
e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.
f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:
1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.
2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.
3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.
4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.
g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).
h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.
i. The contractor shall insert this instruction in all subcontracts entered into under this contract.
5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.
6. Substitution of key personnel.
a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.
b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.
c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.
7. It is anticipated the ship will arrive at the contractor’s yard on or about March 1, 2022. All work shall be completed in no more than 150 calendar days from the actual start date designated by the Government at the time of contract award.
8. The place of performance for this contract shall be the contractor’s facility. Due to operational commitments, the location shall be on the East or Gulf Coast.
Table 1: List of WIs:
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| SCOPE GENERAL REQUIREMENTS AND DEFINITIONS REV 2021-2-20 |
| NSP |
| 0002 |
| TECHNICAL AND MANUFACTURERS REPRESENTATIVES REV 2021-2-20 |
| NSP |
| 0003 |
| APPROACH BERTH AND MOORING REQUIREMENTS REV 2021-2-20 TAH20 |
| NSP |
| 0004 |
| TESTING AND QUALITY ASSURANCE REV 2021-2-20 |
| NSP |
| 0005 |
| ELECTRICAL SAFETY PROCEDURE REQUIREMENTS, REV 2021-2-20 |
| NSP |
| 0006 |
| HEAVY WEATHER PLAN, REV 2021-2-20 TAH20 |
| NSP |
| 0007 |
| COLD WEATHER PLAN, REV 2021-2-20 TAH20 |
| NSP |
| 0010 |
| FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) Rev 2021-3-11 TAH |
| A |
| 0011 |
| FURNISH GENERAL SERVICES FOR THE SHIP-TAH REV 2021-2-20 |
| A |
| 0012 |
| INFORMATION TECHNOLOGY SERVICES REV 2019-8-03 |
| A |
| 0013 |
| PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 2021-2-20 |
| A |
| 0014 |
| WEIGHT AND MOMENT REPORT REV 2021-2-20 |
| A |
| 0015 |
| ILS GFM REV 2021-2-20 |
| A |
| 0016 |
| FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 2021-2-20 |
| A |
| 0018 |
| DELIVERY AND REDELIVERY OF THE VESSEL REV 2021-2-20 |
| A |
| 0019 |
| SHIPBOARD ACCESS AND SECURITY REV 2021-2-20 |
| A |
| 0020 |
| GAS FREE CERTIFICATES REV 2021-2-20 |
| A |
| 0021 |
| CLEAN AND GAS FREE TANKS, VOIDS AND COFFERDAMS AND SPACE, REV 2021-2-20 TAH |
| A |
| 0022 |
| MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 2021-2-20 |
| A |
| 0023 |
| HAZARDOUS WASTE DISPOSAL AT A CONTRACTORS FACILITY, REV 2021-2-20 |
| A |
| 0024 |
| PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 2021-2-20 |
| NSP |
| 0025 |
| ENHANCED PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 2021-2-20 |
| B |
| 0026 |
| FINAL VESSEL CLEANING REV 21-2-20 |
| B |
| 0030 |
| CONTINUATION OF SERVICES, REV 2021-2-20 |
| B |
| 0031 |
| MTF SPONSOR OFFICE |
| B |
| 0090 |
| DAILY COVID-19 PREVENTION AND CONTROL SERVICES |
| B |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0101 |
| (REV A) PUMP ROOM TANK TOP REPAIRS |
| A |
| 0104 |
| (REV A) SERVICE AREA BILGE WELL REFURBISHMENT |
| A |
| 0105 |
| (REV A) SERVICE AREA 2 STEEL REPAIR (ABS) Rev 6-30-21 |
| A |
| 0107 |
| (REV A) SERVICE AREA 4 STEEL REPAIR |
| A |
| 0108 |
| (REV A) SERVICE AREA 5 STEEL REPAIR Rev 6-30-21 |
| A |
| 0151 |
| TAH_CCSI_ULTRASONIC THICKNESS GAUGINGS (5 YR) |
| A |
| 0154 |
| TAH_CCSI_ABS SPECIAL TANK INSPECTION (1 X 5 yEARS) |
| A |
| 0156 |
| TAH_CCSI_FLIGHT DECK PRESERVATION (1 x 3 Years) |
| A |
| 0162 |
| TAH_CCSI_ WATERTIGHT CLOSURE INSPECTION (1 X 5 Years) |
| A |
| 0163 |
| TAH_CCSI_FLIGHT DECK SAFETY NET INSPECTION & TEST (1 x 3 Years) |
| A |
| 0183 |
| TAH_CSI_TANK VENTS OPEN & INSPECT (1 x 5 Years) |
| A |
| 0197 |
| LEAD PAINT-TESTING AND ABATEMENT |
| B |
| 0198 |
| DIRECTED HULL GAUGING |
| B |
| 0199 |
| MISC STEEL REPAIRS |
| B |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0201 |
| (REV A) SLEP-MAIN CIRC PUMPS AND MOTORS OVERHAUL |
| A |
| 0202 |
| SLEP-BOILER SAFETY VALVE REPLACEMENT (T-ALT 17041) |
| A |
| 0204 |
| SLEP-BOILER TUBE INSPECTIONS |
| A |
| 0206 |
| BOILER STEAM VALVE RENEWAL(VR 21-021) |
| A |
| 0207 |
| BOILER SUPERHEATER HEADER ORIFICE PLATE REPAIR |
| A |
| 0251 |
| (REV A) TAH_CCSI_WOODWARD GOVERNOR SERVICING (20K HR) |
| A |
| 0252 |
| TAH_CCSI_REDUCTION GEAR INSPECTION (5 YR) |
| A |
| 0254 |
| TAH_CCSI_THRUST & LINESHAFT BEARING INSPECTION (1 x 5 Years) |
| A |
| 0281 |
| TAH_CSI_BOILER INSPECTION & HYDRO (1 X 30 MONTHS) |
| A |
| 0282 |
| BOILER MOUNTS OPEN INSPECT AND TEST (30M) |
| A |
| 0284 |
| (REV A) TAH_CSI_STEAM PIPING- INSPECT & HYRO (1 X 5 Years) |
| A |
| 0285 |
| TAH_CSI_BOILER SLIDING FEET MAINTENANCE (1 X 5 Years) |
| A |
| 0286 |
| TAH_CSI_HP & LP STEAM TURBINE- OPEN & INSPECT (1 X 5 Years) |
| A |
| 0287 |
| AUTOMATION AND PROPULSION CONTROL INSPECT AND TEST (1YR) |
| A |
| 0288 |
| TAH_CSI_MAIN CONDENSER INSPECTION (1 x 5 Years) |
| A |
| 0290 |
| LUBE OIL FLUSH OF MAIN ENGINE AND REDUCTION GEAR-TAH |
| A |
| 0301 |
| SLEP - SHORE POWER METER INSTALLATION (T-ALT 13007) |
| A |
| 0302 |
| SLEP-AUX SOLID STATE FREQUENCY CONVERTER INSTALL(T-ALT 14016) |
| A |
| 0304 |
| BLOOD BANK UPS INSTALLATION (T-ALT 17052) |
| A |
| 0351 |
| TAH_CCSI_ SWITCHBOARD CLEANING(1 X 30 Months) |
| A |
| 0352 |
| TAH_CCSI_MOTOR CONTROLLER CENTER CLEANING (30MON) |
| A |
| 0353 |
| TAH_CCSI_THERMOGRAPHIC SURVEY (1 YR) |
| A |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0401 |
| SLEP-H2S ALARM SYSTEM SA2 AND SA5 (T-ALT 11021) |
| A |
| 0403 |
| (REV A) SLEP-LOSS OF STEERING ALARM (T-ALT 14029) |
| A |
| 0407 |
| COMMERCIAL BROADBAND SATELLITE ANTENNA INSTALLATION SUPPORT (TAH15015) |
| A |
| 0456 |
| TAH_CSI_MAGNETIC COMPASS SERVICE (2 YR) |
| A |
| 0459 |
| TAH_CCSI_ECHO SOUNDER SERVICE (5 YR) |
| A |
| 0482 |
| TAH_CSI_WINDBIRD CALIBRATION (1 X 3 Years) |
| A |
| 0488 |
| TAH_CCSI_ANTENNA PHOTOGRAPH BOOK (AS REQ) |
| A |
| 0490 |
| TAH_CSI_SPEED LOG SERVICING (1 X 5 Years) |
| A |
| 0492 |
| (REV B)TAH_CSI_CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (Annual) |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| SLEP- PLUMBING SYSTEM PHASE 1 |
| A |
| 0502 |
| (REV C) SLEP- TLI SENSOR INSTALLATION PHASE 2 (T-ALT 14009) |
| A |
| 0503 |
| (REV B) SLEP- TLI SENSOR INSTALLATION PHASE 3 (T-ALT 14009) |
| A |
| 0504 |
| SLEP-CO2 TIME DELAY REPLACEMENT (T-ALT 14012) |
| A |
| 0505 |
| SLEP- MSD CONTROLLER RENEWAL (T-ALT 17057) |
| A |
| 0509 |
| SLEP-AC SW PUMP FLUX DRIVE INSTALLATION (T-ALT 17009) |
| A |
| 0510 |
| (REV B) SLEP-ADG LUBE OIL PURIFER INSTALLATION (T-ALT 17011) |
| A |
| 0514 |
| SLEP-WATERTIGHT DOOR INDICATOR TALT (T-ALT 16014) |
| A |
| 0515 |
| SLEP-SEAWATER PUMP REPLACEMENT (T-ALT 18008) |
| A |
| 0516 |
| (REV A) SLEP SW REDUCING STATION-1 OVERHAUL |
| A |
| 0517 |
| (REV A) SLEP SW REDUCING STATION-2 OVERHAUL |
| A |
| 0518 |
| (REV A) SLEP SW REDUCING STATION-3 OVERHAUL |
| A |
| 0519 |
| (REV A) SLEP SW REDUCING STATION-4 OVERHAUL |
| A |
| 0520 |
| (REV A) SLEP SW REDUCING STATION-5 OVERHAUL |
| A |
| 0521 |
| (REV A) SLEP SW REDUCING STATION-6 OVERHAUL |
| A |
| 0522 |
| (REV A) SLEP SW REDUCING STATION-7 OVERHAUL |
| A |
| 0523 |
| MOORING WINCH OVERHAULS (VR19-0001) |
| A |
| 0524 |
| (REV A) MISCELLANEOUS PIPING REPAIRS |
| A |
| 0526 |
| (REV A) FIRE PUMP AND MOTOR OVERHAULS |
| A |
| 0527 |
| FIRE MAIN ISOLATION VALVE REPAIRS |
| A |
| 0528 |
| FIRE MAIN RELIEF VALVE REPAIRS |
| A |
| 0529 |
| ADG JACKET WATER PUMP REPAIR (VR16-0035) |
| A |
| 0530 |
| ADG AND EDG INJECTOR REFURBISHMENT (VR18-32 AND 33) |
| A |
| 0531 |
| (REV A) ADG SEAWATER STRAINER NO1 RENEWAL (VR 18-077) |
| A |
| 0532 |
| MSD SYSTEM REPAIRS |
| A |
| 0533 |
| AC CHILLER SW ISOLATION VALVE REPAIR |
| A |
| 0534 |
| (REV B) SLEP-INSTALLATION OF FORWARD FIRE PUMP NO. 2 |
| A |
| 0535 |
| (REV A) CHILLER SEAWATER REGULATING VALVE REPAIRS |
| A |
| 0536 |
| SLEP-INSTALL SCBA COMPRESSOR & FILL STATION (T-ALT T-AH 19044R) |
| A |
| 0553 |
| TAH_CSI_PRESSURE VESSEL INSPECTION (5YR) |
| A |
| 0554 |
| TAH_CCSI_INSPECT, TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) |
| A |
| 0560 |
| TAH_CCSI_PERSONNEL ELEVATOR INSPECTION AND TEST (5 YR) |
| A |
| 0599 |
| MISCELLANEOIUS PIPING RENEWAL |
| B |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0603 |
| 03 LEVEL PASSAGEWAY DECK TILE RENEWAL (VR17-028) |
| A |
| 0604 |
| TAH_CSI_TENDER BOAT SERVICE- 4YR TAH |
| A |
| 0605 |
| TAH_CSI_TENDER BOAT DAVIT SERVICE- 4YR TAH |
| A |
| 0606 |
| TAH_CSI_DECK CRANE INSPECTION-5YR (NON-ABS) |
| A |
| 0612 |
| MSC CREW 01 LEVEL DECK TILE REPLACEMENT |
| A |
| 0652 |
| TAH_CSI_LIFEBOAT & DAVIT SERVICE & INSPECTION- 4 YR TAH |
| A |
| 0654 |
| (REV A) TAH_CCSI_RESCUE BOAT & DAVIT SERVICE (1 X 5 Years) |
| A |
| 0655 |
| TAH_CCSI_IMMERSION SUIT SERVICE (3YR) |
| A |
| 0656 |
| TAH_CCSI_ANNUAL LIFE RAFT CERTIFICATION (ABS) |
| A |
| 0658 |
| TAH_CCSI_ACCOMMODATION LADDER MAINTENANCE AND TESTING (5YR) |
| A |
| 0682 |
| TAH_CSI_LIFE RAFT DAVIT SERVICING (1 X 4 Years) |
| A |
| 0689 |
| TAH_CSI_TENDER BOAT ENGINE & DRIVE SERVICING (1 X 4 YEARS) |
| A |
| 0690 |
| TAH_CSI_STEAM KETTLE RELIEF VALVE AND HYDROSTATIC TEST (5 YR) |
| A |
| 0695 |
| TAH_CSI_UTILITY BOAT INSPECTION (1 X 5 Years) |
| A |
| SECTION 0700 |
| SPONSOR RELATED |
| 0701 |
| TAH_CSI_SHIPS LAUNDRY EQUIPMENT GROOM AND INSPECT |
| A |
| 0702 |
| TAH_CSI_PATIENT LITTER HOIST INSPECTION- 30 MONTH |
| A |
| 0703 |
| MTF OR PRC DECK RENEWAL (VR21-0026) |
| A |
| 0704 |
| MTF SCULLERY DECK REPLACEMENT (T-ALT 19043R) |
| A |
| 0705 |
| MTF GALLEY DECK SAND AND RESEAL |
| A |
| 0706 |
| (REV A) MTF STOREROOMS DECK GRATING RENEWAL (VR21-0066) |
| A |
| 0708 |
| MTF OR AREA PRC DECK RENEWAL (VR21-0026) |
| A |
| 0709 |
| (REV A) MTF T-AH COMFORT NAVY CASH EFT SYSTEM INSTALLATION |
| A |
| 0710 |
| (REV A) MTF FWD WARD PRC DECK RENEWAL (VR21-0075) |
| A |
| 0711 |
| (REV A) MTF OFFICER BERTHING (VR21-0076) |
| A |
| 0712 |
| MTF ENLISTED BERTHING DECKING RENEWAL (VR21-0062) |
| A |
| 0713 |
| MTF LAUNDRY RECEIVING DECK RENEWAL (VR 21-0071) |
| A |
| 0714 |
| MTF ELEVATOR VESTIBULE DECK RENEWAL (VR 21-0077) |
| A |
| 0715 |
| LTD WARD BED REPAIRS |
| A |
| 0781 |
| MTF TAH_CSI_O2N2 PRODUCER INSPECTION AND SERVICING (1 YR) |
| A |
| 0782 |
| MTF TAH_CSI_O2N2 LPAC COMPRESSOR INSPECTION AND SERVICING (1 YR) |
| A |
| 0783 |
| TAH_CSI_OXYGEN BOTTLE INSPECTION AND HYDRO (5 YR) |
| A |
| 0851 |
| TAH_CCSI_ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING (1 YR) |
| A |
| 0852 |
| TAH_CCSI_ANNUAL LAUNDRY VENT CLEANING |
| A |
| 0882 |
| TAH_CSI_AC CHILLER PLANT SERVICING (5 YR) |
| A |
| 0899 |
| INSULATION AND LAGGING REPAIR |
| B |
| 0901 |
| TAH_CCSI_DRYDOCKING AND UNDOCKING THE VESSEL (1 x 5 Years) |
| A |
| 0902 |
| (REV A) BOILER BLOWDOWN PIPING OVERBOARD REPAIR |
| A |
| 0904 |
| CHAIN LOCKER AND FOREPEAK EDUCTOR VALVE SERVICE |
| A |
| 0953 |
| TAH_CCSI_ANCHORS, CHAINS & LOCKERS (5YR) |
| A |
| 0954 |
| TAH_CCSI_RUDDER AND STERN FRAME EXAMINATION (1 x 5 Years) |
| A |
| 0956 |
| TAH_CCSI_OVERHAULING SEA VALVES (1 X 5 Years) |
| A |
| 0957 |
| TAH_CCSI_PROPELLER INSPECTION AND POLISHING- ON DOCK (1 X 5 Years) Rev |
| A |
| 0960 |
| TAH_CCSI_UNDERWATER HULL CLEANING & PAINTING - SPOT BLAST (1 x 5 Years) |
| A |
| 0962 |
| (REV A) TAH_CCSI_CATHODIC PROTECTION SYSTEM (1 x 5 Years) |
| A |
| 0963 |
| (REV A) TAH_CCSI_SEA CHEST MARINE GROWTH PREVENTION SYSTEM (1 X 5 Years) |
| A |
| 0964 |
| TAH_CCSI_SW EXPANSION JOINTS (1 x 5 Years) |
| A |
| 0966 |
| TAH_CCSI_SHAFT ALIGNMENT & BEARING REACTION CHECKS (1 x 5 Years) |
| A |
| 0980 |
| (REV A) TAH_CSI_TAILSHAFT INSPECTION - IN PLACE (1 x 5 Years) |
| A |
| 0982 |
| (REV A ) TAH_CSI_TAILSHAFT REMOVAL AND INSPECTION (5 YR) |
| B |
| 0984 |
| TAH_CSI_HULL ZINC REPLACEMENT (1 x 5 Years) |
| A |
| 0985 |
| (REV A)TAH_CSI_SHAFT SEAL INSPECTION & REPLACEMENT (1 x 5 Years) |
| A |
| 0998 |
| ADDITIONAL UNDERWATER HULL PRESERVATION |
| B |
| 0999 |
| EXTENSION ON DRY DOCK |
| B |
(End of Summary of Changes) image1.wmf