Responces to Bidders Questions (09-02-21).docx

DOCX document 23 KB Posted

Attached to
USNS COMFORT (T-AH 20) ROH/DD Solicitation
Solicitation number
N3220521R4225
Issued by

About this file

This document contains responses to bidder questions regarding Solicitation Number N3220521R4225 for the upcoming Regular Overhaul and Dry Docking (ROH/DD) of the USNS COMFORT (T-AH 20). The Military Sealift Command of the Department of the Navy issued the solicitation seeking bids for work items including replacement of bottom blow piping, installation of a UPS system, calibration of equipment, replacement of deck grating, and servicing of lifeboats. Questions from potential bidders covered clarification of material and equipment requirements, recommended changes to work procedures, and an extension to the proposal due date of September 29, 2021 due to weather impacts. The responses addressed the scope of contractor versus government-furnished items, revised specifications and drawings, and agreed to bidders' requests to modify work methods and extend the deadline.

View the file

Other files

File Type Posted
USNS COMFORT ROH Amendment 0005.docx DOCX document
0712_B_MTF ENLISTED BERTHING DECKING RENEWAL (VR21-0062).doc DOC document
USNS COMFORT ROH Amendment 0004.pdf PDF
0031_B_(REV A) MTF SPONSOR OFFICE.docx DOCX document
J-2 Category A Rev 0004.xlsx XLSX spreadsheet
J-3 Category B Rev 0004.xlsx XLSX spreadsheet
709_A_(REV A) MTF T-AH COMFORT NAVY CASH EFT SYSTEM INSTALLATION.doc DOC document
502_A_(REV C) SLEP- TLI SENSOR INSTALLATION PHASE 2 (T-ALT 14009).doc DOC document
510_A_(REV B) SLEP-ADG LUBE OIL PURIFER INSTALLATION (T-ALT 17011).doc DOC document
USNS COMFORT ROH Amendment 0003.docx DOCX document
Responces to RFC 064-067.docx DOCX document
492_A_(REV B)TAH_CSI_CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (Annual).doc DOC document
USNS COMFORT ROH Amendment 0002.docx DOCX document
Revised Work Items 0002.zip ZIP file
J2 Category A.xlsx XLSX spreadsheet
0492_A_TAH CSI CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (Annual).doc DOC document
Responces to Bidders Questions (08-25-21).docx DOCX document
Revised Work Items.zip ZIP file
USNS COMFORT ROH Amendment 0001.docx DOCX document
J-14 Technical Data Non-Disclosure.docx DOCX document
J-3 Category B.xlsx XLSX spreadsheet
Exhibit A - CDRLs.zip ZIP file
J-7 MSC Ship Repair Facility Survey.docx DOCX document
J-10 Interport Differential.docx DOCX document
J-2 Category A.xlsx XLSX spreadsheet
J-4 GFP.pdf PDF
J-11 Dry Dock Eval Form.docx DOCX document
Solicitation N3220521R4225.docx DOCX document
J-8 Request for Spec Clarification.docx DOCX document
J-9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
J-12 Past Performance Data.docx DOCX document
J-13 Past Performance Questionnaire.docx DOCX document
JA COMFORT ROH 21R4225 - Redacted.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO BIDDER’S QUESTIONS

USNS COMFORT FY-22 ROH

N3220521R4225 08-25-21

RFC: 032

ITEM: 0403

Question:

Paragraph 4 states Government Supply is none. Paragraph 3.2.1 instructs the contractor to provide materials in paragraph 2.2.1. Please clarify who is supplying the materials in paragraph 2.1.4 drawing no. 426-8496167.

Also, items 1 to 30 and 55 are marked, GFE, please confirm

Answer:

CONTRACTOR TO PROVIDE ALL EQUIPMENT FOR THIS WORK ITEM. THE ONLY REQUIREMENT TO BE ACCOMPLISHED ON REFERENCE 2.1.3 IS TO PROVIDE, INSTALL AND CONNECT THE #3 UPS IN AFT STEERING TO PROVIDE POWER FOR THE LOSS OF STEERING ALARM.

REVISION “A” OF WORK ITEM 0403 TO BE ISSUED WITH AMENDMENT 0002.

RFC: 054

ITEM: 0902

Question:

Paragraph 1.1 calls for the overboard pipe connection at the hull. Paragraph 3.2.1 calls for 2 feet of 2” pipe from the sea chest to the first valve in the machinery room. There is approximately 60 feet of 1-1/2” pipe. Please clarify what is required for this item.

Answer:

BOTTOM BLOW PIPING IS 1-1/2” SCH 80 ASTM-A-106. PIPE IS TO BE REPLACED FROM THE FIRST VALVE TO THE HULL INCLUDING THE PENETRATION.

REVISION “A” OF WORK ITEM 0902 WAS ISSUED WITH AMENDMENT 0001.

RFC: 055

ITEM: 0706

Question:

1)Item 706 deck grating has the reference drawing list the space 01-41-4 as a medical cold storage space not a Dairy Storeroom. Please clarify.
2)Please provide the dimensions required for supplying the deck grating in 01-33-0. Reference drawing 5980864 does not provide these dimensions.

Answer:

THE CORRECT DESIGNATION FOR STOREROOM 0-41-4 IS:

REFRIGERATED MEDICAL HOLDING STOREROOM (01-41-4)

DRAWING 5981331 REV G WILL BE ADDED TO WORK ITEM 706 FOR THE GRATING IN STORE ROOM 01-33-0.

REVISION “A” OF WORK ITEM 0706 WILL BE ISSUED WITH AMENDMENT 0002.

RFC: 056

ITEM: 0652

Question:

Palfinger says they are not the OEM and have no bid the work. Marine Safety also says they will not work on the life boats. Vane Brothers are not the OEM. The boats were manufactured by Lane, which are no longer in business. We can’t seem to locate anyone that is willing to work on the lifeboats. Please advise and send us the contact info for an OEM that is willing to provide pricing.

Answer:

THE FOLLOWING IS A KNOWN SOURCE FOR SERVICING THE LIFEBOATS:

SURVIVAL SYSTEMS INTERNATIONAL

931 INDUSTRY ROAD

KENNER, LA 70062

PHONE: (504) 469-4545

RFC: 057

ITEM: 0284

Question:

Para 7.3.6 States to slug up while plant is online. Contractor requests to bring the boiler down prior to slugging up.

Answer:

CONCUR WITH CONTRACTORS RECOMMENDATION. THE REQUIREMENTS OF PARAGRAPH 2.3.6 HAVE BEEN CHANGE.

REVISION “A” OF WORK ITEM 0284 WILL BE ISSUED WITH AMENDMENT 0002.

RFC: 058

ITEM: 0201

Question:

7.2.10 Minor Kit 8000-LM615MINOR has a lead time of 16 weeks from OEM. This Jeopardizes the POP. Request to be provided as GFM, or to have long lead time funding to procure kits ahead of time.

Answer:

MINOR REPAIR KIT 8000-LM615MINOR WILL BE PROVIDED AS GFM.

REVISION “A” OF WORK ITEM 0201 WILL BE ISSUED WITH AMENDMENT 0002.

RFC: 059

ITEM: 0534

Question:

We have reviewed the item and would like to have the gauges in paragraph 7.3.6 clarified. Please see the below inquiry.

2 EACH GAGES, COMPOUND, RATING 30”HG TO 25 PSI. CALIBRATION CERTIFICATE REQUIRED face size, connection, accuracy, commercial or mil-spec, material 2 EACH GAGES, PRESSURE 0-250 PSI WITH SENSING UNIT. CALIBRATION CERTIFICATE REQUIRED face size, connection, accuracy, commercial or mil-spec, material, input/output voltage etc.

Answer:

THE FOLLOWING INFORMATION WILL BE PROVIDED GAUGE REQUIREMENTS:

SUCTION GAUGE:

RANGE: 30” HG – 25 PSIG

4” FACE

BOTTOM CONNECTION

BACK MOUNT

COMMERCIAL

RATED FOR SEA SWATER SERVICE

HOKE 6800 SERIES VALVE WITH TEST CONNECTION INSTALLED

DISCHARGE GAUGE:

RANGE: 0 – 250 PSIG

4” FACE

BOTTOM CONNECTION

BACK MOUNT

COMMERCIAL

RATED FOR SEA SWATER SERVICE

HOKE 6800 SERIES VALVE WITH TEST CONNECTION INSTALLED

REVISION “B” OF WORK ITEM 0534 WILL BE ISSUED WITH AMENDMENT 0002.

RFC: 060

ITEM: N/A

Question:

Due to power and internet service disruptions from Hurricane IDA, as well as delays in receiving pricing from OEM’s and subcontractors, please consider extending the proposal due date until September 29, 2021.

Answer:

CONCUR WITH CONTRACTOR’S REQUEST TO EXTEND THE SOLICITATION CLOSING DATE TO 29 SEPT 2021.

RFC: 061

ITEM: 0706

Question:

Does the grating have to be exactly the same configuration as shown on drawing 5980864 D, section 24A, sheet 6 of 8?

Can it be bar grating or have oblong holes?

Answer:

GRATING HAS TO BE SAME CONFIGURATION AS SPECIFIED ON DRAWING IN ORDER TO MATCH REMOVABLE POGO STICKS USED TO SECURE MATERIAL FOR SEA IN THE STOREROOM.

RFC: 062

ITEM: 0492

Question:

Amendment 1 states WI 561 will be removed and WI 492 will be added.

Please provide enclosure 2.2.1 for WI 492 which is the list of equipment to be calibrated.

Answer:

ENCLOSURE 2.2.1 IS ATTACHED TO WORK ITEM 0492.

REVISION “A” OF WORK ITEM 0492 WILL BE ISSUED WITH AMENDMENT 0002.

RFC: 063

ITEM: 0492

Question:

For the signal generators, please provide the manufacturer and model #'s (the enclosure provides ranges, not model numbers). Also please provide a model number for the Ampmeter at the bottom of the list.

Answer:

REVISION “A” OF WORK ITEM 0492 WILL BE ISSUED WITH AMENDMENT 0002.