J-3 Category B.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- USNS COMFORT (T-AH 20) ROH/DD Solicitation
- Solicitation number
- N3220521R4225
About this file
This document contains a contractor price breakdown for category B items for the upcoming Regular Overhaul and Dry Docking (ROH/DD) of the USNS COMFORT (T-AH 20). The solicitation is being conducted by the Department of the Navy Military Sealift Command.
The price breakdown lists over 100 line items across various work categories including general services, hull and structural work, auxiliary machinery, HVAC, and drydocking. Specific requirements include enhanced physical security, vessel cleaning, continuation of services, lead paint testing and abatement, hull gauging, steel repairs, piping renewal, insulation and lagging repair, tailshaft removal and inspection, additional freeboard and underwater hull preservation, and drydock extension. Pricing is shown as labor hours, material quantities, lump sums, or daily rates with total proposed prices for each work item category.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WorkPackage J-3 Report
| GENERAL REQUIREMENT | QTY | UI | UNIT PRICE | TOTAL | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 000 | GENERAL SERVICES AND REQUIREMENTS | ||||||||||||||
| 025 | ENHANCED PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY | ||||||||||||||
| 7.1 | Set FP Condition Charlie | 1 | job | $ - 0 | |||||||||||
| 7.2 | Set FP condition Delta | 1 | job | $ - 0 | |||||||||||
| 7.3 | Maintain FP Con C | 10 | day | $ - 0 | |||||||||||
| 7.4 | Maintain FP Con D | 10 | day | $ - 0 | |||||||||||
| WI 025 SUBTOTAL | $ - 0 | ||||||||||||||
| 026 | FINAL VESSEL CLEANING REV 21-2-20 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| WI 026 SUBTOTAL | $ - 0 | ||||||||||||||
| 030 | CONTINUATION OF SERVICES, REV 2021-2-20 | ||||||||||||||
| 10 | Continuation of services WI010 | 15 | day | $ - 0 | |||||||||||
| 11 | Continuation of services WI011 | 15 | day | $ - 0 | |||||||||||
| 12 | Continuation of services WI012 | 15 | day | $ - 0 | |||||||||||
| 13 | Continuation of services WI013 | 15 | day | $ - 0 | |||||||||||
| 16 | Continuation of services WI016 | 15 | day | $ - 0 | |||||||||||
| 19 | Continuation of services WI019 | 15 | day | $ - 0 | |||||||||||
| 20 | Continuation of services WI020 | 15 | day | $ - 0 | |||||||||||
| 90 | Continuation of services WI090 | 15 | day | $ - 0 | |||||||||||
| WI 030 SUBTOTAL | $ - 0 | ||||||||||||||
| 031 | MTF SPONSOR OFFICE | ||||||||||||||
| 7.1 | MTF SPONSOR OFFICE FACILITIES | 150 | DAY | $ - 0 | |||||||||||
| WI 031 SUBTOTAL | $ - 0 | ||||||||||||||
| 090 | DAILY COVID-19 PREVENTION AND CONTROL SERVICES | ||||||||||||||
| 1 | daily cleaning | 150 | day | $ - 0 | |||||||||||
| WI 090 SUBTOTAL | $ - 0 | ||||||||||||||
| 100 | HULL AND STRUCTURAL | ||||||||||||||
| 197 | LEAD PAINT-TESTING AND ABATEMENT | ||||||||||||||
| 1 | Paint sample | 10 | Lot of 10 ea | $ - 0 | |||||||||||
| 2 | Overhead surface remediation | 125 | sqft | $ - 0 | |||||||||||
| 3 | Horizontal surface remediation | 125 | sqft | $ - 0 | |||||||||||
| 4 | Vertical surface remediation | 125 | sqft | $ - 0 | |||||||||||
| 5 | Piping surface remediation | 125 | sqft | $ - 0 | |||||||||||
| WI 197 SUBTOTAL | $ - 0 | ||||||||||||||
| 198 | DIRECTED HULL GAUGING | ||||||||||||||
| 7.1 | UT thickness gauging readings as directed | 50 | Lot of 100 shots | $ - 0 | |||||||||||
| WI 198 SUBTOTAL | $ - 0 | ||||||||||||||
| 199 | MISC STEEL REPAIRS | ||||||||||||||
| 1 | Interference removal and install labor | 1000 | hours | $ - 0 | |||||||||||
| 2 | Interference removal and install material | 1 | LOT | $ - 0 | |||||||||||
| 3 | Misc plate bulkheads and decks | 1000 | lbs | $ - 0 | |||||||||||
| 4 | Shell or rudder plating | 1000 | lbs | $ - 0 | |||||||||||
| 5 | Shell or rudder plating, shaped | 1000 | lbs | $ - 0 | |||||||||||
| 6 | Tank bulkheads | 500 | lbs | $ - 0 | |||||||||||
| 7 | Tank internals | 500 | lbs | $ - 0 | |||||||||||
| 8 | Shell plate framing | 800 | lbs | $ - 0 | |||||||||||
| 9 | Tank top in Machinery spaces | 800 | lbs | $ - 0 | |||||||||||
| 10 | Machinery foundations in Machinery spaces | 500 | lbs | $ - 0 | |||||||||||
| 11 | Floors Intercostals in DB tanks | 500 | lbs | $ - 0 | |||||||||||
| 12 | Double bottom stiffeners and bulkheads | 500 | lbs | $ - 0 | |||||||||||
| 13 | Machinery foundations on deck | 600 | lbs | $ - 0 | |||||||||||
| WI 199 SUBTOTAL | $ - 0 | ||||||||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||||||
| 599 | MISCELLANEOIUS PIPING RENEWAL | ||||||||||||||
| 1 | Interference removal labor | 750 | hrs | $ - 0 | |||||||||||
| 2 | Interference removal materials | 1 | Lot | $ - 0 | |||||||||||
| 3 | 2 IPS STEEL SCHED 40 PIPE | 150 | FT | $ - 0 | |||||||||||
| 4 | 3 IPS STEEL SCHED 40 PIPE | 150 | FT | $ - 0 | |||||||||||
| 5 | 4 IPS STEEL SCHED 40 PIPE | 150 | FT | $ - 0 | |||||||||||
| 6 | 6 IPS STEEL SCHED 40 PIPE | 150 | FT | $ - 0 | |||||||||||
| 7 | 2 IPS STEEL SCHED 40 FITTING | 40 | EA | $ - 0 | |||||||||||
| 8 | 3 IPS STEEL SCHED 40 FITTING | 40 | EA | $ - 0 | |||||||||||
| 9 | 4 IPS STEEL SCHED 40 FITTING | 20 | EA | $ - 0 | |||||||||||
| 10 | 6 IPS STEEL SCHED 40 FITTING | 20 | EA | $ - 0 | |||||||||||
| 11 | 2 IPS CU-NI CLASS 200 PIPE | 150 | FT | $ - 0 | |||||||||||
| 12 | 3 IPS CU-NI CLASS 200 PIPE | 150 | FT | $ - 0 | |||||||||||
| 13 | 4 IPS CU-NI CLASS 200 PIPE | 150 | FT | $ - 0 | |||||||||||
| 14 | 6 IPS CU-NI CLASS 200 PIPE | 150 | FT | $ - 0 | |||||||||||
| 15 | 2 IPS CU-NI CLASS 200 FITTING | 40 | EA | $ - 0 | |||||||||||
| 16 | 3 IPS CU-NI CLASS 200 FITTING | 40 | EA | $ - 0 | |||||||||||
| 17 | 4 IPS CU-NI CLASS 200 FITTING | 20 | EA | $ - 0 | |||||||||||
| 18 | 6 IPS CU-NI CLASS 200 FITTING | 20 | EA | $ - 0 | |||||||||||
| WI 599 SUBTOTAL | $ - 0 | ||||||||||||||
| 800 | HVAC | ||||||||||||||
| 899 | INSULATION AND LAGGING REPAIR | ||||||||||||||
| A | Fiberglass cloth 3" thermal insulation | 500 | sqft | $ - 0 | |||||||||||
| B | Fiberglass cloth 2" thermal insulation | 500 | sqft | $ - 0 | |||||||||||
| C | 1" IPS non-steam pipe insulation | 100 | ft | $ - 0 | |||||||||||
| D | Up to 3" IPS non-steam pipe insulation | 100 | ft | $ - 0 | |||||||||||
| E | Up to 6" IPS non-steam pipe insulation | 100 | ft | $ - 0 | |||||||||||
| F | Up to 1: IPS steam pipe insulation | 150 | ft | $ - 0 | |||||||||||
| G | UP to 3" IPS steam pipe insulation | 100 | ft | $ - 0 | |||||||||||
| H | Up to 6: IPS steam pipe insulation | 100 | ft | $ - 0 | |||||||||||
| WI 899 SUBTOTAL | $ - 0 | ||||||||||||||
| 900 | DRYDOCKING | ||||||||||||||
| 982 | TAH_CSI_TAILSHAFT REMOVAL AND INSPECTION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| WI 982 SUBTOTAL | $ - 0 | ||||||||||||||
| 997 | ADDITIONAL FREEBOARD PRESERVATION | ||||||||||||||
| 7.1 | SP-10 prep additional freeboard | 80000 | sqft | $ - 0 | |||||||||||
| 7.2 | Prime coat application | 80000 | sqft | $ - 0 | |||||||||||
| 7.3 | Topcoat application | 80000 | sqft | $ - 0 | |||||||||||
| WI 997 SUBTOTAL | $ - 0 | ||||||||||||||
| 998 | ADDITIONAL UNDERWATER HULL PRESERVATION | ||||||||||||||
| 7.1 | Preparation of additional underwater hull | 120000 | sqft | $ - 0 | |||||||||||
| 7.2 | Application of prime coat to additional underwater hull area | 120000 | sqft | $ - 0 | |||||||||||
| WI 998 SUBTOTAL | $ - 0 | ||||||||||||||
| 999 | EXTENSION ON DRY DOCK | ||||||||||||||
| 7.1 | EXTENSION ON DRY DOCK | 15 | DAY | $ - 0 | |||||||||||
| WI 999 SUBTOTAL | $ - 0 | ||||||||||||||
| TOTAL | $ - 0 |
| USNS COMFORT (T-AH 20) | CONTRACTOR PRICE BREAKDOWN |
| CATEGORY "B" ITEMS | N3220521R6500 |
Page &P of &N ATTACHMENT J-3
File details come from the government source that posted it. Updated .