J-3 Category B.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
USNS COMFORT (T-AH 20) ROH/DD Solicitation
Solicitation number
N3220521R4225
Issued by

About this file

This document contains a contractor price breakdown for category B items for the upcoming Regular Overhaul and Dry Docking (ROH/DD) of the USNS COMFORT (T-AH 20). The solicitation is being conducted by the Department of the Navy Military Sealift Command.

The price breakdown lists over 100 line items across various work categories including general services, hull and structural work, auxiliary machinery, HVAC, and drydocking. Specific requirements include enhanced physical security, vessel cleaning, continuation of services, lead paint testing and abatement, hull gauging, steel repairs, piping renewal, insulation and lagging repair, tailshaft removal and inspection, additional freeboard and underwater hull preservation, and drydock extension. Pricing is shown as labor hours, material quantities, lump sums, or daily rates with total proposed prices for each work item category.

View the file

Other files

File Type Posted
USNS COMFORT ROH Amendment 0005.docx DOCX document
0712_B_MTF ENLISTED BERTHING DECKING RENEWAL (VR21-0062).doc DOC document
USNS COMFORT ROH Amendment 0004.pdf PDF
0031_B_(REV A) MTF SPONSOR OFFICE.docx DOCX document
J-2 Category A Rev 0004.xlsx XLSX spreadsheet
J-3 Category B Rev 0004.xlsx XLSX spreadsheet
709_A_(REV A) MTF T-AH COMFORT NAVY CASH EFT SYSTEM INSTALLATION.doc DOC document
502_A_(REV C) SLEP- TLI SENSOR INSTALLATION PHASE 2 (T-ALT 14009).doc DOC document
510_A_(REV B) SLEP-ADG LUBE OIL PURIFER INSTALLATION (T-ALT 17011).doc DOC document
USNS COMFORT ROH Amendment 0003.docx DOCX document
Responces to RFC 064-067.docx DOCX document
492_A_(REV B)TAH_CSI_CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (Annual).doc DOC document
USNS COMFORT ROH Amendment 0002.docx DOCX document
Revised Work Items 0002.zip ZIP file
J2 Category A.xlsx XLSX spreadsheet
Responces to Bidders Questions (09-02-21).docx DOCX document
0492_A_TAH CSI CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (Annual).doc DOC document
Responces to Bidders Questions (08-25-21).docx DOCX document
Revised Work Items.zip ZIP file
USNS COMFORT ROH Amendment 0001.docx DOCX document
J-14 Technical Data Non-Disclosure.docx DOCX document
Exhibit A - CDRLs.zip ZIP file
J-7 MSC Ship Repair Facility Survey.docx DOCX document
J-10 Interport Differential.docx DOCX document
J-2 Category A.xlsx XLSX spreadsheet
J-4 GFP.pdf PDF
J-11 Dry Dock Eval Form.docx DOCX document
Solicitation N3220521R4225.docx DOCX document
J-8 Request for Spec Clarification.docx DOCX document
J-9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
J-12 Past Performance Data.docx DOCX document
J-13 Past Performance Questionnaire.docx DOCX document
JA COMFORT ROH 21R4225 - Redacted.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WorkPackage J-3 Report

GENERAL REQUIREMENTQTYUIUNIT PRICETOTALPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
000GENERAL SERVICES AND REQUIREMENTS
025ENHANCED PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY
7.1Set FP Condition Charlie1job$ - 0
7.2Set FP condition Delta1job$ - 0
7.3Maintain FP Con C10day$ - 0
7.4Maintain FP Con D10day$ - 0
WI 025 SUBTOTAL$ - 0
026FINAL VESSEL CLEANING REV 21-2-20$ - 0$ - 0$ - 0
WI 026 SUBTOTAL$ - 0
030CONTINUATION OF SERVICES, REV 2021-2-20
10Continuation of services WI01015day$ - 0
11Continuation of services WI01115day$ - 0
12Continuation of services WI01215day$ - 0
13Continuation of services WI01315day$ - 0
16Continuation of services WI01615day$ - 0
19Continuation of services WI01915day$ - 0
20Continuation of services WI02015day$ - 0
90Continuation of services WI09015day$ - 0
WI 030 SUBTOTAL$ - 0
031MTF SPONSOR OFFICE
7.1MTF SPONSOR OFFICE FACILITIES150DAY$ - 0
WI 031 SUBTOTAL$ - 0
090DAILY COVID-19 PREVENTION AND CONTROL SERVICES
1daily cleaning150day$ - 0
WI 090 SUBTOTAL$ - 0
100HULL AND STRUCTURAL
197LEAD PAINT-TESTING AND ABATEMENT
1Paint sample10Lot of 10 ea$ - 0
2Overhead surface remediation125sqft$ - 0
3Horizontal surface remediation125sqft$ - 0
4Vertical surface remediation125sqft$ - 0
5Piping surface remediation125sqft$ - 0
WI 197 SUBTOTAL$ - 0
198DIRECTED HULL GAUGING
7.1UT thickness gauging readings as directed50Lot of 100 shots$ - 0
WI 198 SUBTOTAL$ - 0
199MISC STEEL REPAIRS
1Interference removal and install labor1000hours$ - 0
2Interference removal and install material1LOT$ - 0
3Misc plate bulkheads and decks1000lbs$ - 0
4Shell or rudder plating1000lbs$ - 0
5Shell or rudder plating, shaped1000lbs$ - 0
6Tank bulkheads500lbs$ - 0
7Tank internals500lbs$ - 0
8Shell plate framing800lbs$ - 0
9Tank top in Machinery spaces800lbs$ - 0
10Machinery foundations in Machinery spaces500lbs$ - 0
11Floors Intercostals in DB tanks500lbs$ - 0
12Double bottom stiffeners and bulkheads500lbs$ - 0
13Machinery foundations on deck600lbs$ - 0
WI 199 SUBTOTAL$ - 0
500AUXILIARY MACHINERY
599MISCELLANEOIUS PIPING RENEWAL
1Interference removal labor750hrs$ - 0
2Interference removal materials1Lot$ - 0
32 IPS STEEL SCHED 40 PIPE150FT$ - 0
43 IPS STEEL SCHED 40 PIPE150FT$ - 0
54 IPS STEEL SCHED 40 PIPE150FT$ - 0
66 IPS STEEL SCHED 40 PIPE150FT$ - 0
72 IPS STEEL SCHED 40 FITTING40EA$ - 0
83 IPS STEEL SCHED 40 FITTING40EA$ - 0
94 IPS STEEL SCHED 40 FITTING20EA$ - 0
106 IPS STEEL SCHED 40 FITTING20EA$ - 0
112 IPS CU-NI CLASS 200 PIPE150FT$ - 0
123 IPS CU-NI CLASS 200 PIPE150FT$ - 0
134 IPS CU-NI CLASS 200 PIPE150FT$ - 0
146 IPS CU-NI CLASS 200 PIPE150FT$ - 0
152 IPS CU-NI CLASS 200 FITTING40EA$ - 0
163 IPS CU-NI CLASS 200 FITTING40EA$ - 0
174 IPS CU-NI CLASS 200 FITTING20EA$ - 0
186 IPS CU-NI CLASS 200 FITTING20EA$ - 0
WI 599 SUBTOTAL$ - 0
800HVAC
899INSULATION AND LAGGING REPAIR
AFiberglass cloth 3" thermal insulation500sqft$ - 0
BFiberglass cloth 2" thermal insulation500sqft$ - 0
C1" IPS non-steam pipe insulation100ft$ - 0
DUp to 3" IPS non-steam pipe insulation100ft$ - 0
EUp to 6" IPS non-steam pipe insulation100ft$ - 0
FUp to 1: IPS steam pipe insulation150ft$ - 0
GUP to 3" IPS steam pipe insulation100ft$ - 0
HUp to 6: IPS steam pipe insulation100ft$ - 0
WI 899 SUBTOTAL$ - 0
900DRYDOCKING
982TAH_CSI_TAILSHAFT REMOVAL AND INSPECTION (5 YR)$ - 0$ - 0$ - 0
WI 982 SUBTOTAL$ - 0
997ADDITIONAL FREEBOARD PRESERVATION
7.1SP-10 prep additional freeboard80000sqft$ - 0
7.2Prime coat application80000sqft$ - 0
7.3Topcoat application80000sqft$ - 0
WI 997 SUBTOTAL$ - 0
998ADDITIONAL UNDERWATER HULL PRESERVATION
7.1Preparation of additional underwater hull120000sqft$ - 0
7.2Application of prime coat to additional underwater hull area120000sqft$ - 0
WI 998 SUBTOTAL$ - 0
999EXTENSION ON DRY DOCK
7.1EXTENSION ON DRY DOCK15DAY$ - 0
WI 999 SUBTOTAL$ - 0
TOTAL$ - 0
USNS COMFORT (T-AH 20)CONTRACTOR PRICE BREAKDOWN
CATEGORY "B" ITEMSN3220521R6500

Page &P of &N ATTACHMENT J-3