This document is an amendment to a solicitation for the regular overhaul of a United States Naval Ship. The amendment extends the period of performance from 16 April 2021 through 31 May 2021, a total of 46 days. It incorporates Federal Acquisition Regulation clause 52.219-4 regarding price evaluation preference for HUBZone small businesses and adds Attachment J-10 Revision 1 to the solicitation package. The work involves conducting inspections, repairs, maintenance, and other work items aboard the USNS ROBERT E. PEARY at the contractor's shipyard. Eligible contractors must have the capabilities and facilities to perform the full scope of work. The contractor will be responsible for management, quality assurance, procurement, production, and subcontractor oversight.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0007 is being issues 05 February 2021 for the follow ing:
The Period of Performance has changed to 16 April 2021 through 31 May 2021 for a total duration of forty six (46) days.
FAR 52.219-4 has been incorporated.
Attachment J-10 Revision 1 has been added.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220521R4125
X 9B. DATED (SEE ITEM 11)
05-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Feb-2021
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C. STREET
BLDG. SP-64
NAVAL STATION NORFOLK
NORFOLK VA 23511
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3220521R4125
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
ACRONYM TABLE
ABIH American Board of Industrial Hygiene ABR Agreement for Boat Repair ABS American Bureau of Shipping ACO Administrative Contracting Officer AGR Additional Government Requirements AIHA American Industrial Hygiene Association ALT Alternate AMT Amount BLDG Building CCO Contract Change Order CD Compact Disc CDRL Contract Data Requirements List CD-ROM Compact Disc Read-Only Memory CFM Contractor Furnished Material CFP Contractor Furnished Property CFR Condition Found Report CHENG Chief Engineer CFR Code of Federal Regulations CIH Certified Industrial Hygienist CLIN Contract Line Item Number
CONUS
CPARS
Contiguous United States Contractor Performance Assessment Reporting System
DBIDS Defense Biometric Identification Systems DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DOD SAFE Department of Defense Secure Access File Exchange DON Department of the Navy EMAIL Electronic Mail ESRS Electronic Subcontract Report System FAPIIS Federal Awardee Performance and Integrity Information System FAR Federal Acquisition Regulation FBLR Fully-Burdened Labor Rate F/CC Fibers Per Cubic Centimeter FPCON Force Protection Condition FTR Federal Travel Regulations G&A General and Administrative GFI-TD Government Furnished Information – Technical Data GFM Government Furnished Material GFP Government Furnished Property GPE Governmentwide Point of Entry IAW In Accordance With ID Identification
ISO International Organization for Standardization JTR Joint Travel Regulations KO Contracting Officer KWh Kilowatt Hour LLTM Long Lead Time Material LPTA Lowest Price Technically Acceptable M&IE Meals and Incidental Expenses MSC Military Sealift Command MSCREP Military Sealift Command Representative MM Millimeter MSRA Master Ship Repair Agreement MTA Mid-Term Availability N/A Not Applicable NCACS Navy Commercial Access Control System NDA Non-Disclosure Agreement NO Number NSP Not Separately Priced ODC Other Direct Costs PAT Proficiency in Analytical Testing
PII
Portable Document Format Personally Identifiable Information
PM Program Manager PPE Principle Port Engineer PRIME Prime Contractor QA Quality Assurance QC Quality Control REV Revision RFC Request for Specification Clarification RFP Request for Proposal ROH/DD Regular Overhaul/Dry-Docking SECNAV Secretary of the Navy SF Standard Form SUB Subcontractor TPSN Time Phased Sequencing Network TWA Time-Weighted Average USC United States Code USCG United States Coast Guard USNS United States Naval Ship VR Voyage Repair WAWF Wide Area Workflow WI Work Item
SCOPE OF WORK
1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS ROBERT E.
PEARY (TAKE-5) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.
c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
e. Developing a performance milestone schedule/critical path chart to measure scheduled performance.
Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths.
The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.
f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.
j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:
1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority.
Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.
2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.
5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.
8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training.
First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.
10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
o Pier, with services in place, accessible to the CLASS size ship for berthing o Structural Shop o Machine Shop o Pipe Shop o Electrical/Electronic Shop o Carpentry Shop o Rigging Equipment o Dry-dock – when required for docking of vessel in performance of the specification
11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.
c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.
4. Asbestos removal requirements.
a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.
b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.
c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).
d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.
e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.
f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:
1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.
2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.
3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.
4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.
g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).
h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.
i. The contractor shall insert this instruction in all subcontracts entered into under this contract.
5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.
6. Substitution of key personnel.
a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.
b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.
c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced.
The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.
7. It is anticipated the ship will arrive at the contractor’s yard on or about 16 April 2021. All work shall be completed in no more than 46 calendar days from the actual start date designated by the Government at the time of contract award.
8. The place of performance for this contract shall be the contractor’s facility.
Table 1: List of WIs:
SECTION 000 GENERAL REQUIREMENTS
NOT SEPARATELY PRICED (NSP) REQUIREMENTS
001 INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS
002 TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
003 APPROACH, BERTH, AND MOORING REQUIREMENTS
004 TESTING AND QUALITY ASSURANCE
005 ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
006 HEAVY WEATHER PLAN
007 COLD WEATHER PLAN
CATEGORY “A” WORK ITEMS
010 FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
011 FURNISH GENERAL SERVICES
012 TELEPHONE SERVICES
013 PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
014 PREPARATION OF WEIGHT AND MOMENT REPORT
015 INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
016 FIRE PROTECTION AND SHIP’S SAFETY PROGRAM
017 NA
018 DELIVERY AND RE-DELIVERY
019 SHIPBOARD ACCESS AND SECURITY
020 GAS FREE CERTIFICATES
021 CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES
022 DOCK TRIALS AND SEA TRIAL
023 HAZARDOUS WASTE DISPOSAL
024 PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY
090 DAILY COVID-19 PREVENTION AND CONTROL SERVICES rev M
CATEGORY “B” WORK ITEMS
025 PHYSICAL SECURITY FORCE BRAVO
026 VESSEL FINAL CLEANING CONUS REV 11 MAY 20
030 CONTINUATION OF SERVICES
902 DRYDOCKING AND UNDOCKING THE VESSEL
SECTION 100 Hull Structure
CATEGORY “A” WORK ITEMS
101 CSI-BALLAST TANK ZINC INSPECTIONS (2.5 YR)
102 EXTERIOR HULL VENT MATERIAL REPLACEMENT (T-ALT 425)
153 CSI-ABS INTERMEDIATE SURVEY – TANK INSPECTION
156 CSI- FLIGHT DECK PRESERVATION (3 YR)
163 CSI- FLIGHT DECK SAFETY NET INSPECTION AND TEST (3 YR)
SECTION 200 Propulsion Machinery
CATEGORY “A” WORK ITEMS
201 CSI- PROPULSION MOTOR AND COOLER CLEAN, INSPECT, MAINT.
202 CSI- MAIN ENGINE FLEXIBLE CONNECTION REPLACEMENT
203 VULKAN COUPLING STABILIZER LINKS (T-ALT 401)
204 CSI- MDE CONTROL SAFETY INSPECT AND TEST (1 YR)
205 CSI- AUTOMATION AND PROPULSION CONTROL INSPECT AND TEST (1 YR)
206 CSI- VULKAN COUPLING INSPECT (1 YR)
207 CSI- PROPULSION MOTOR PEDESTAL BEARING INSPECT (5 YR)
209 CSI- MDE 8 CYL SERVICE MDG 4 (24K HRS) REV - B
251 CCSI- WOODWARD GOVERNORS MDG 4 (24K HRS) REV – B
254 CCSI- THRUST AND LINESHAFT BEARING INSPECT (5 YR)
SECTION 300 Electrical
CATEGORY “A” WORK ITEMS
301 CSI- CLEANING MAIN GENERATOR & PROPULSION SYSTEM (10 YR)
302 EATON TIME DELAY REPLACEMENT (T-ALT 496)
303 CSI- HIGH VOLTAGE EMERGENCY SWITCHBOARD INSPECT (2.5 YR)
310 CSI- REPLACE UPS BATTERIES (3 YR)
311 CSI- REPLACE UPS AND PLC BATTERIES (5 YR)
353 CCSI- THERMOGRAPHIC SURVEY (1 YR)
SECTION 400 Communication and Navigation
401 PA-GA SYSTEM UPS INSTALL (TALT 323)
402 CSI- ANTENNA PREVENTATIVE MAINT (5 YR)
403 CSI- COMMS SYSTEM PREVENTATIVE MAINT (2.5 YR)
404 CSI- OE-570 WSC ATENNA SYSTEM MAINTENANCE (2.5 YR)
405 TVSS INSTALL (TALT 412) – REV A
408 CSI- WIND SPEED MEASURING & INDICATION SYS CERT. (3 YR)
412 ANTENNA REPLACEMENT
451 CCSI- ANNUAL RADAR SERVICE – REV A
452 CCSI- ANNUAL ECDIS SERVICE (SCSI)
453 CCSI- ANNUAL GYRO SYS – REV A
454 CCSI- ANNUAL VDR RECERT.
455 CCSI- ANNUAL RADIO COMS EQUIP RECERT. – REV A
456 CCSI- MAGNETIC COMPASS SERVICE (2 YR)
457 CCSI- EPIRB SERVICE (5 YR) – REV A
460 CCSI- ANNUAL INSPECTION OF ALARMS
SECTION 500 AUXILIARY MACHINERY SYSTEMS
CATEGORY “A” WORK ITEMS
501 BOW THRUSTER COOLING REGULATOR (TALT 227)
502 FAS STOP VALVES INSTALL (TALT 265)
503 CSI-ANNUAL CRANE INSPECTION – REV A
504 SEWAGE FLUSHING VALVE REPLACEMENT (TALT 336)
505 TRASH ROOM CG LOCKER FIRE PROTECT MODS (TALT 343)
506 CSI- EDG ANNUAL TEST & INSPECT
507 VCHT CHECK VALVES INSTALL (TALT)
508 ALARM TOWER MN ENG WORKSHOP (TALT 396) – REV A
509 CSI- DISTILL PLANT MAINT. (5 YR)
510 WTR MIST PANEL UPGRADES (TALT 468)
511 FIRE DETECT. SYS UPGRADES (TALT 469)
512 CSI- MAGAZINE SPRINKLER GAUGE CALIBRATION
513 UPGRADE VCHT PIPING MATERIAL (TALT 518)
514 ODME REMOVAL (TALT 526)
515 CMWD SYSTEM PIPING REPLACEMENT (TALT 420)
516 CSI- SWEAGE SYSTEM PIPING CLEANING (2.5 YR)
517 CSI- LTFW COOLER CLEAN AND INSPECT (2.5 YR)
518 CSI- HTFW COOLER CLEAN AND INSPECT (2.5 YR)
519 EDG QUICK CLOSE FUEL AND LO VALVES (TALT 471)
520 BALLAST SYS PIPE REPAIR
521 CARGO AND AC PLANT INSP AND GROOM
522 CENTRAL SEA WATER PUMP NO.2 OVERHAUL REV - C
525 CSI- CARGO REFER COMPRESSOR OH NO1 & NO2 20K
527 CSI- BRINE SYS FLUSH (5 YR)
530 CSI- MDG PEDESTAL BEARING INSPECT (5 YR)
551 CCSI- OH PLATE COOLERS LO 3 & 4 (10 YR)
552 CCSI- HOSE REPLACEMENT (5 YR)
554 CCSI- INSPECT, TEST, & CERT MACHINERY SPACE CRANES AND HOISTS
561 CCSI- GAUGE CAL ANNUAL
562 CCSI- SCBA ANNUAL INSPEC
563 CCSI- SCBA AIR COMP & FILLING STATING INSPEC AND MAINT
565 CCSI- FIXED GAS FIREFIGHTING SYS INSPECT AND TEST
567 CCSI- FIREFIGHTING SYS INSPECT AND TEST
568 CCSI- FIXED FOAM FIRE FIGHTING SYS INSPECT AND TEST
569 CCSI FIRE AND SMOKE DETECT ALARM SYS
570 CCSI PROTABLE FIRE EXTINGUISH SERVICE
571 CCSI FIRE AND SMOKE DAMPER SERVICE
572 CCSI DEEP FAT FRYER & RANGE FIRE SYS
573 CCSI- FIRE HOSE ANNUAL -REV A
574 CCSI- FIRE DOORS AND SHUTTERS
575 CSI- WATER MIST FIREFIGHTING SYS INSPECT AND TEST
SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY
CATEGORY “A” WORK ITEMS
601 HAZMAT CONTAINER REPAIR
610 CSI- GALLEY AND MSO EQUIP CAL (2.5 YR)
643 CSI- CERT OF SPIDERMAN BASKETS (1 YR) – REV A
651 CCSI- ANNUAL LIFEBOAT AND DAVIT INSPECT
653 CCSI ANNUAL RESCUE BOAT AND DAVIT INSPECT
655 CCSI- IMMERSION SUIT SERVICE (3 YR)
656 CCSI ANNUAL LIFE RAFT CERT
657 CCSI- ACCOM LADDER INSPECT ANNUAL
662 CCSI- DEEP FRYER INSPECTION ANNUAL
SECTION 800 HEATING, VENTILATION AND AIR CONDITIONING
801 EOS AC UNIT INSTALLATION (TALT 360)
851 CCSI- ANNUAL GALLEY VENT AND GAYLORD CLEANING
852 ANNUAL LAUNDRY VENT CLEANING
SECTION 900 DRYDOCKING AND UNDOCKING
CATEGORY “A” WORK ITEMS
901 DRYDOCKING AND UNDOCKING (5 YR)
903 BOW THRUSTER REPAIR
907 CSI- POLISH BOW THRUSTER PROP (2.5 YR)
957 CCSI PROP CLEAN AND POLISH (2.5 YR)
960 CCSI- UNDERWATER HULL CLEANING AND PAINTING (5 YR)
962 CATHODIC PROTECTION SYS (2.5 YR) – REV A
963 CCSI-SEA CHEST MARINE GROWTH PREVENTION SYS (2.5 YR)
966 CCSI- SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR)
SECTION 1000 UNREP Gear
1051 CCSI HP AIR RELIEF VLV INSPECT AND TEST (2 YR)
SECTION G - CONTRACT ADMINISTRATION DATA
The following have been deleted:
MSC SPECIFIC
WAWF
MSC SPECIFIC WAWF AUG 2012
SECTION I - CONTRACT CLAUSES
The following have been added by full text:
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (DEVIATION 2020-O0008) (MAR 2020)
(a) Definitions. As used in this clause— “HUBZone small business concern” means a small business concern, certified by the Small Business Administration (SBA), that appears on the List of Qualified HUBZone Small Business Concerns maintained by the SBA (13 CFR 126.103).
“Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(b) Evaluation preference.
(1) Offers will be evaluated by adding a factor of 10 percent to the price of all offers, except—
(i) Offers from HUBZone small business concerns that have not waived the evaluation preference; and
(ii) Otherwise successful offers from small business concerns.
(2) The factor of 10 percent shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors described in the solicitation shall be applied before application of the factor.
(3) When the two highest rated offerors are a HUBZone small business concern and a large business, and the evaluated offer of the HUBZone small business concern is equal to the evaluated offer of the large business after considering the price evaluation preference, award will be made to the HUBZone small business concern.
(c) Waiver of evaluation preference. A HUBZone small business concern may elect to waive the evaluation preference, in which case the factor will be added to its offer for evaluation purposes. The agreements in paragraphs
(e) and (f) of this clause do not apply if the Offeror has waived the evaluation preference.
__ Offeror elects to waive the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, a HUBZone small business concern agrees that, in the case of a contract assigned a NAICS code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs are excluded to the extent they are not the principal purpose of the contract and cannot be obtained from small business concerns;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) A HUBZone joint venture agrees that the aggregate of the HUBZone small business concerns to the joint venture, not each concern separately, will perform the applicable requirements specified in paragraph (e) of this clause.
(g) Nonmanufacturer.
(1) Unless SBA has waived the requirements of paragraphs (g)(1)(i) through (iii) of this clause in accordance with 13 CFR 121.1204, a HUBZone small business concern that provides an end item it did not manufacture, process, or produce, shall—
(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;
(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and
(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.
(2) For contracts or orders for multiple end items, at least 50 percent of the total value of the contract or order shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.
(3) Paragraphs (g)(1) through (2) of this clause do not apply—
(i) To construction or service contracts; or
(ii) When the Offeror waives the evaluation preference.
(h) Notice. The HUBZone small business Offeror acknowledges that a prospective HUBZone awardee must be a HUBZone small business concern at the time of award of this contract. The HUBZone offeror shall provide the Contracting Officer a copy of the notice required by 13 CFR 126.501 if material changes occur before contract award that could affect its HUBZone eligibility. If the apparently successful HUBZone Offeror is not a HUBZone small business concern at the time of award of this contract, the Contracting Officer will proceed to award to the next otherwise successful HUBZone small business concern or other offeror.
(End of clause)