J-2 Category A Items.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- USNS ROBERT E. PEARY (T-AKE 5) Regular Overhaul (ROH) Federal contract opportunity
- Solicitation number
- N3220521R4125
About this file
This document contains a contractor price breakdown for category "A" line items for the USNS Robert E. Peary T-AKE 5 regular overhaul. The breakdown lists over one thousand individual line items covering hull and structural work, main propulsion, electrical systems, communications and navigation aids, auxiliary machinery, habitability, heating ventilation and air conditioning, drydocking and undocking, and unrep equipment. Pricing is provided by the prime contractor and any subcontractors for labor hours and materials. Also included are costs for government mandated technical representatives and other associated costs. The solicitation number is N3220521R4125 and seeks services for the regular overhaul of the USNS Robert E. Peary to be conducted by the Military Sealift Command of the Department of the Navy.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | TAKE_CCSI_GENERAL SERVICES FOR SHIP( REV FEB 14.doc) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 090 | LEVEL 1 DAILY COVID-19 PREVENTION AND CONTROL SERVICES | |||||||||||
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | T-AKE CSI BALLAST TANK ZINC INSPECTION (2.5 YR) | |||||||||||
| 102 | EXTERIOR HULL VENT MATERIAL REPLACEMENT (T-ALT 425) | |||||||||||
| 153 | T-AKE CSCSI ABS INTERMEDIATE SURVEY- TANK INSPECTION | |||||||||||
| 156 | T-AKE CCSI FLIGHT DECK PRESERVATION (3 YR) | |||||||||||
| 163 | T-AKE CCSI FLIGHT DECK SAFETY NET INSPECTION AND TEST (3 YR) | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | T-AKE CSI PROPULSION MOTOR AND COOLER CLEANING, INSPECTION, AND MAINTENANCE (2.5 YR) (SCSI) | |||||||||||
| 202 | T-AKE CSI MAIN ENGINE FLEXIBLE CONNECTION REPLACEMENT (10 YR) | |||||||||||
| 203 | VULKAN COUPLING STABILIZER LINKS (T-ALT 401) | |||||||||||
| 204 | T-AKE CSI MDE CONTROL SAFETY INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 205 | T-AKE CSI AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 206 | T-AKE CSI VULKAN COUPLING INSPECTIONS (1 YR) (SCSI) | |||||||||||
| 207 | T-AKE CSI PROPULSION MOTOR PEDESTAL BARING INSPECTION (5 YR) (SCSI) | |||||||||||
| 209 | T-AKE CSI MAIN ENGINE 8 CYLINDER SERVICE MDG 4 (24K HRS) (SCSI) | |||||||||||
| 251 | T-AKE CCSI WOODWARD GOVERNORS MDG 4 (24K HRS) | |||||||||||
| 254 | TAKE CCSI THRUST AND LINESHAFT BEARING INSPECTION (5 YR) (SCSI) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | T-AKE CSI CLEANING MAIN GENERATORS & PROPULSION CONTROL SYSTEM (10 YR) (SCSI) | |||||||||||
| 302 | EATON TIME DELAY REPLACEMENT (T-ALT 496) | |||||||||||
| 303 | T-AKE CSI HIGH VOLTAGE, SHIP'S SERVICE, AND EMERGENCY SWITCHBOARD INSPECTION AND CLEANING (2.5 YR) | |||||||||||
| 310 | TAKE CSI REPLACE UPS BATTERIES (3 YR) | |||||||||||
| 311 | T-AKE CSI REPLACE UPS AND PLC BATTERIES (5 YR) | |||||||||||
| 353 | TAKE CCSI THERMOGRAPHIC SURVEY (1 YR) | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | PA-GA SYSTEM UPS INSTALLATION (T-ALT 323) | |||||||||||
| 402 | T-AKE CSI ANTENNA PREVENTATIVE MAINTENANCE (5 YR) | |||||||||||
| 403 | T-AKE CSI COMMS SYSTEM PREVENTATIVE MAINTENANCE (5 YR) | |||||||||||
| 404 | T-AKE CSI OE-570 WSC ANTENNA SYSTEM MAINTENANCE (2.5 YR) | |||||||||||
| 405 | TVSS INSTALL (T-ALT 412) | |||||||||||
| 408 | T-AKE CSI WIND SPEED MEASURING AND INDICATION SYSTEM CERTIFICATION (3 YR) | |||||||||||
| 412 | ANTENNA REPLACEMENT | |||||||||||
| 451 | T-AKE CCSI ANNUAL RADAR SERVICE | |||||||||||
| 452 | T-AKE CCSI ANNUAL ECDIS SERVICE (SCSI) | |||||||||||
| 453 | T-AKE CCSI ANNUAL GYRO SYSTEM | |||||||||||
| 454 | T-AKE CCSI ANNUAL VDR RECERTIFICATION | |||||||||||
| 455 | T-AKE CCSI ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | |||||||||||
| 456 | T-AKE CCSI MAGNETIC COMPASS SERVICE (2 YR) | |||||||||||
| 457 | T-AKE CCSI EPIRB SERVICE (5 YR) | |||||||||||
| 460 | T-AKE CCSI ANNUAL INSPECTION OF ALARMS | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | BOW THRUSTER COOLING REGULATOR (T-ALT 227) | |||||||||||
| 502 | FAS STOP VALVES INSTALL (T-ALT 265) | |||||||||||
| 503 | TAKE CCSI INSPECT DECK CRANES (ANNUALS) | |||||||||||
| 504 | SEWAGE FLUSHING VALVE REPLACEMENT (T-ALT 336) | |||||||||||
| 505 | TRASH ROOM CG LOCKER STRUCTURAL FIRE PROTECTION MODS(T-ALT 343) | |||||||||||
| 506 | TAKE CSI EMERGENCY DIESEL GENERATOR -ANNUAL TESTING AND INSPECTION (1 YR) (SCSI) | |||||||||||
| 507 | VCHT CHECK VALVES INSTALLATION (T-ALT 362) | |||||||||||
| 508 | ALARM TOWER MN ENG WORKSHOP (T-ALT 396) | |||||||||||
| 509 | TAKE CSI DISTILLING PLANT MAINTENANCE (5 YR) | |||||||||||
| 510 | WATER MIST PANEL UPGRADES (T-ALT 468) | |||||||||||
| 511 | FIRE DETECTION SYSTEM UPGRADES (T-ALT 469) | |||||||||||
| 512 | TAKE CSI MAGAZINE SPRINKLER GAUGE SPRINKLER CALIBRATION (1 YR) | |||||||||||
| 513 | UPGRADE VCHT PIPING MATERIAL (T-ALT 518) | |||||||||||
| 514 | ODME REMOVAL (T-ALT 526) | |||||||||||
| 515 | CMWD SYSTEM PIPING REPLACEMENT (T-ALT 420) | |||||||||||
| 516 | TAKE CSI SEWAGE SYSTEM PIPING CLEANING (2.5 YR) | |||||||||||
| 517 | TAKE CSI LTFW COOLER CLEANING AND INSPECTION (2.5 YR) | |||||||||||
| 518 | TAKE CSI HTFW COOLER CLEANING AND INSPECTION (2.5 YR) | |||||||||||
| 519 | EDG QUICK CLOSING FUEL AND LO VALVES (T-ALT 471) | |||||||||||
| 520 | BALLAST SYSTEM PIPE REPAIR | |||||||||||
| 521 | CARGO REFRIGERATION AND AIR CONDITIONING PLANT INSPECTIONS AND TESTING | |||||||||||
| 522 | CENTRAL SEA WATER PUMP NO.2 OVERHAUL REV - C | |||||||||||
| 525 | TAKE CSI CARGO REEFER COMPRESSOR OVERHAUL NO1 AND NO2 (20K HRS) | |||||||||||
| 527 | TAKE CSI BRINE SYSTEM FLUSH (5 YR) | |||||||||||
| 530 | TAKE CSI MAIN DIESEL GENERATOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI) | |||||||||||
| 551 | TAKE CCSI OVERHAUL PLATE COOLERS LO 3 AND 4 (10 YR) | |||||||||||
| 552 | TAKE CCSI HOSE REPLACEMENT (5 YR) | |||||||||||
| 554 | TAKE CCSI INSPECT, TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | |||||||||||
| 561 | TAKE CCSI GAUGE CALIBRATION (1 YR) | |||||||||||
| 562 | TAKE CCSI SCBA ANNUAL INSPECTION | |||||||||||
| 563 | TAKE CCSI SCBA AIR COMPRESSOR AND FILLING STATION INSPECTION & MAINTENANCE (1 YR) | |||||||||||
| 565 | TAKE CCSI FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 567 | TAKE CCSI FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 568 | TAKE CCSI FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 569 | TAKE CCSI FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR) (SCSI | |||||||||||
| 570 | TAKE CCSI PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | |||||||||||
| 571 | TAKE CCSI FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI) | |||||||||||
| 572 | TAKE CCSI DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) | |||||||||||
| 573 | TAKE CCSI FIRE HOSES (1 YR) (SCSI) | |||||||||||
| 574 | TAKE CCSI FIRE DOORS AND SHUTTERS (1 YR) (SCSI) | |||||||||||
| 575 | TAKE CSI WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | HAZMAT CONTAINERS REPAIR | |||||||||||
| 610 | TAKE CSI GALLEY AND MSO EQUIPMENT CALIBRATION (2.5 YR) | |||||||||||
| 643 | TAKE CSI CERTIFICATION OF SPIDERMAN BASKETS (1 YR) | |||||||||||
| 651 | TAKE CCSI ANNUAL LIFEBOAT AND DAVIT INSPECTION | |||||||||||
| 653 | TAKE CCSI ANNUAL RESCUE BOAT AND DAVIT INSPECTION | |||||||||||
| 655 | TAKE CCSI IMMERSION SUIT SERVICE (3 YR) | |||||||||||
| 656 | TAKE CCSI ANNUAL LIFE RAFT CERTIFICATION | |||||||||||
| 657 | TAKE CCSI ACCOMMODATION LADDER INSPECTION (1 YR) | |||||||||||
| 662 | TAKE CCSI DEEP FAT FRYER INSPECTION (1 YR) | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | EOS A.C. UNIT INSTALLATION (T-ALT 360) | |||||||||||
| 851 | TAKE CCSI ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING | |||||||||||
| 852 | TAKE CCSI ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | TAKE CCSI DRYDOCKING AND UNDOCKING THE VESSEL (5 YRS) | |||||||||||
| 903 | BOW THRUSTER REPAIR | |||||||||||
| 907 | TAKE CSI POLISH BOW THRUSTER PROPELLER (2.5 YR) | |||||||||||
| 957 | TAKE CCSI PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) | |||||||||||
| 960 | TAKE CCSI UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR) | |||||||||||
| 962 | TAKE CCSI CATHODIC PROTECTION SYSTEM (2.5 YR) | |||||||||||
| 963 | TAKE CCSI SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5 YR) | |||||||||||
| 966 | TAKE CCSI SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR) | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1051 | TAKE CCSI HP AIR RELIEF VALVE INSPECT AND TEST (2 YR) | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS ROBERT E. PEARY | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220521R4125 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .