J-2 Category A Items Rev 4.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- USNS ROBERT E. PEARY (T-AKE 5) Regular Overhaul (ROH) Federal contract opportunity
- Solicitation number
- N3220521R4125
About this file
This document contains a contractor price breakdown for Category "A" items required for the USNS ROBERT E. PEARY (T-AKE 5) Regular Overhaul. The Navy's Military Sealift Command is soliciting for the overhaul through solicitation N3220521R4125, which replaces the prior Sources Sought Notice.
The price breakdown lists over 100 line items categorized under Hull/Structural, Main Propulsion, Electrical, Communication/Navigation Aids, Auxiliary Machinery, Habitability, Heating/Ventilation/Air Conditioning, Drydocking/Undocking, Unrep Equipment, and General Requirements. Recurring services include inspection and maintenance of generators, main engines, ballast tanks, cranes, firefighting systems, lifeboats, and more. Pricing is provided for labor hours and materials by the prime contractor and any subcontractors, along with totals. The selected contractor will be responsible for the overhaul in accordance with the detailed requirements.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | SCOPE GENERAL REQUIREMENTS AND DEFINTIONS REV 16JUL18 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURERS REPRESENTATIVE REV 01MAY18 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH BERTH AND MOORING REQUIREMENTS REV 29JAN19 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE REV 20JUL18 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS REV 25FEB14 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN REV 03AUG19 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN REV 03AUG19 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) CONUS REV 11 MAY 20 | |||||||||||
| 011 | TAKE_CCSI_GENERAL SERVICES FOR SHIP( REV FEB 14.doc) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES REV 03AUG19 | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS REV 10DEC18 | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT REV 03AUG19 | |||||||||||
| 015 | ILS GFM REV 28OCT18 | |||||||||||
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV 28SEP17 | |||||||||||
| 017 | HANDLING SHIPS STORES REV 25FEB14 | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL REV 03AUG19 | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY REV 28NOV18 | |||||||||||
| 020 | GAS FREE CERTIFICATES REV 03AUG19 | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES REV 03AUG19 | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS REV 28SEP17 | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY REV 03AUG19 | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY REV 09JUL19 | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 090 | LEVEL I DAILY COVID-19 PREVENTION AND CONTROL SERVICES REV M REV 20Jul20rs | |||||||||||
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | TAKE CSI BALLAST TANK ZINC INSPECTION (2.5 YR) | |||||||||||
| 102 | EXTERIOR HULL VENT MATERIAL REPLACEMENT (T-ALT 425) | |||||||||||
| 153 | TAKE CCSI ABS INTERMEDIATE SURVEY - TANK INSPECTION | |||||||||||
| 156 | TAKE CCSI FLIGHT DECK PRESERVATION (3 YR) | |||||||||||
| 163 | TAKE CCSI FLIGHT DECK SAFETY NET INSPECTION AND TEST (3 YR) | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | TAKE CSI PROPULSION MOTOR AND COOLER CLEANING, INSPECTION AND MAINTENANCE (2.5 YR) (SCSI) | |||||||||||
| 202 | TAKE CSI MAIN ENGINE FLEXIBLE CONNECTION REPLACEMENT (10 YR) | |||||||||||
| 203 | VULKAN COUPLING STABILIZER LINKS (T-ALT 401) | |||||||||||
| 204 | TAKE CSI MDE CONTROL SAFETY INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 205 | TAKE CSI AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 206 | TAKE CSI VULKAN COUPLING INSPECTIONS (1 YR) (SCSI) | |||||||||||
| 207 | TAKE CSI PROPULSION MOTOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI) | |||||||||||
| 209 | TAKE CSI MAIN ENGINE 8 CYLINDER SERVICE MDG 4 (24K HRS) (SCSI) REV - B | |||||||||||
| 251 | TAKE CCSI WOODWARD GOVERNORS MDG 4 (24K HRS) REV - B | |||||||||||
| 254 | TAKE CCSI THRUST AND LINESHAFT BEARING INSPECTION (5 YR) (SCSI) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301B | TAKE CSI CLEANING MAIN GENERATORS & PROPULSION CONTROL SYSTEM (10 YR) (SCSI) | |||||||||||
| 302 | EATON TIME DELAY REPLACEMENT (T-ALT 496) | |||||||||||
| 303 | TAKE CSI HIGH VOLTAGE, SHIP'S SERVICE, AND EMERGENCY SWITCHBOARD INSPECTION AND CLEANING (2.5 YR) | |||||||||||
| 310 | TAKE CSI REPLACE UPS BATTERIES (3 YR) | |||||||||||
| 311 | TAKE CSI REPLACE UPS AND PLC BATTERIES (5 YR) | |||||||||||
| 353 | TAKE CCSI THERMOGRAPHIC SURVEY (1 YR) | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | PA-GA SYSTEM UPS INSTALLATION (T-ALT 323) | |||||||||||
| 402 | TAKE CSI ANTENNA PREVENTATIVE MAINTENANCE (5 YR) | |||||||||||
| 403 | TAKE CSI COMMS SYSTEM PREVENTATIVE MAINTENANCE (5 YR) | |||||||||||
| 404 | TAKE CSI OE-570 WSC ANTENNA SYSTEM MAINTENANCE (2.5 YR) | |||||||||||
| 405 | TVSS INSTALL (T-ALT 412) Rev A | |||||||||||
| 408 | TAKE CSI WIND SPEED MEASURING AND INDICATION SYSTEM CERTIFICATION (3 YR) | |||||||||||
| 412 | ANTENNA REPLACEMENT | |||||||||||
| 451 | TAKE CCSI ANNUAL RADAR SERVICE - REV A | |||||||||||
| 452 | TAKE CCSI ANNUAL ECDIS SERVICE (SCSI) | |||||||||||
| 453 | TAKE CCSI ANNUAL GYRO SYSTEM - REV A | |||||||||||
| 454 | TAKE CCSI ANNUAL VDR RECERTIFICATION | |||||||||||
| 455 | TAKE CCSI ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION - REV A | |||||||||||
| 456 | TAKE CCSI MAGNETIC COMPASS SERVICE (2 YR) | |||||||||||
| 457 | TAKE CCSI EPIRB SERVICE (5 YR) - REV A | |||||||||||
| 460 | TAKE CCSI ANNUAL INSPECTION OF ALARMS | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | Bow Thruster Cooling Regulator (T-ALT 227) | |||||||||||
| 502 | FAS Stop Valves Install (T-ALT 265) | |||||||||||
| 503 | TAKE CCSI INSPECT DECK CRANES (Annuals) -REV A | |||||||||||
| 504 | SEWAGE FLUSHING VALVE REPLACEMENT (T-ALT 336) | |||||||||||
| 505 | Trash Room CG Locker Structural Fire Protection Mods(T-ALT 343) | |||||||||||
| 506 | TAKE CSI EMERGENCY DIESEL GENERATOR -ANNUAL TESTING AND INSPECTION (1 YR) (SCSI) | |||||||||||
| 507 | VCHT CHECK VALVES INSTALLATION (T-ALT 362) | |||||||||||
| 508 | Alarm Tower Mn Eng Workshop (T-ALT 396) -REV A | |||||||||||
| 509 | TAKE CSI DISTILLING PLANT MAINTENANCE (5 YR) | |||||||||||
| 510 | WATER MIST PANEL UPGRADES (T-ALT 468) | |||||||||||
| 511 | Fire Detection System Upgrades (T-ALT 469) | |||||||||||
| 512 | TAKE CSI MAGAZINE SPRINKLER GAUGE SPRINKLER CALIBRATION (1 YR) | |||||||||||
| 513 | UPGRADE VCHT PIPING MATERIAL (T-ALT 518) | |||||||||||
| 514 | ODME Removal (T-ALT 526) | |||||||||||
| 515 | CMWD SYSTEM PIPING REPLACEMENT (T-ALT 420) | |||||||||||
| 516 | TAKE CSI SEWAGE SYSTEM PIPING CLEANING (2.5 YR) | |||||||||||
| 517 | TAKE CSI LTFW COOLER CLEANING AND INSPECTION (2.5 YR) | |||||||||||
| 518 | TAKE CSI HTFW COOLER CLEANING AND INSPECTION (2.5 YR) | |||||||||||
| 519 | EDG QUICK CLOSING FUEL AND LO VALVES (T-ALT 471) | |||||||||||
| 520 | Ballast System Pipe Repair | |||||||||||
| 521 | CARGO REFRIGERATION AND AIR CONDITIONING PLANT INSPECTIONS AND TESTING | |||||||||||
| 522 | Central sea water pump No.2 Overhaul REv - C | |||||||||||
| 525 | TAKE CSI CARGO REEFER COMPRESSOR OVERHAUL No1 and No2 (20K HRS) | |||||||||||
| 527 | TAKE CSI BRINE SYSTEM FLUSH (5 YR) | |||||||||||
| 530 | TAKE CSI MAIN DIESEL GENERATOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI) | |||||||||||
| 551 | TAKE CCSI OVERHAUL PLATE COOLERS LO 3 and 4 (10 YR) | |||||||||||
| 552 | TAKE CCSI HOSE REPLACEMENT (5 YR) | |||||||||||
| 554 | TAKE CCSI INSPECT, TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | |||||||||||
| 561 | TAKE CCSI GAUGE CALIBRATION (1 YR) | |||||||||||
| 562 | TAKE CCSI SCBA ANNUAL INSPECTION | |||||||||||
| 563 | TAKE CCSI SCBA AIR COMPRESSOR AND FILLING STATION INSPECTION & MAINTENANCE (1 YR) | |||||||||||
| 565 | TAKE CCSI FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 567 | TAKE CCSI FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 568 | TAKE CCSI FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 569 | TAKE CCSI FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR) (SCSI | |||||||||||
| 570 | TAKE CCSI PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | |||||||||||
| 571 | TAKE CCSI FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI) | |||||||||||
| 572 | TAKE CCSI DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) | |||||||||||
| 573 | TAKE CCSI FIRE HOSES (1 YR) (SCSI) Rev A | |||||||||||
| 574 | TAKE CCSI FIRE DOORS AND SHUTTERS (1 YR) (SCSI) | |||||||||||
| 575 | TAKE CSI WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR) (SCSI) | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | HAZMAT CONTAINERS REPAIR | |||||||||||
| 610 | TAKE CSI GALLEY AND MSO EQUIPMENT CALIBRATION (2.5 YR) | |||||||||||
| 643 | TAKE CSI CERTIFICATION OF SPIDERMAN BASKETS (1 YR) - REV A | |||||||||||
| 651 | TAKE CCSI ANNUAL LIFEBOAT AND DAVIT INSPECTION | |||||||||||
| 653 | TAKE CCSI ANNUAL RESCUE BOAT AND DAVIT INSPECTION | |||||||||||
| 655 | TAKE CCSI IMMERSION SUIT SERVICE (3 YR) | |||||||||||
| 656 | TAKE CCSI ANNUAL LIFE RAFT CERTIFICATION | |||||||||||
| 657 | TAKE CCSI ACCOMMODATION LADDER INSPECTION (1 YR) | |||||||||||
| 662 | TAKE CCSI DEEP FAT FRYER INSPECTION (1 YR) | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | EOS A.C. UNIT INSTALLATION (T-ALT 360) | |||||||||||
| 851 | TAKE CCSI ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING | |||||||||||
| 852 | TAKE CCSI ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | TAKE CCSI DRYDOCKING AND UNDOCKING THE VESSEL (5 YRS) | |||||||||||
| 903 | BOW THRUSTER REPAIR | |||||||||||
| 907 | TAKE CSI POLISH BOW THRUSTER PROPELLER (2.5 YR) | |||||||||||
| 957 | TAKE CCSI PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) | |||||||||||
| 960 | TAKE CCSI UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR) | |||||||||||
| 962 | TAKE CCSI CATHODIC PROTECTION SYSTEM (2.5 YR) - REV A | |||||||||||
| 963 | TAKE CCSI SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5 YR) | |||||||||||
| 966 | TAKE CCSI SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR) | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1051 | TAKE CCSI HP AIR RELIEF VALVE INSPECT AND TEST (2 YR) | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS ROBERT E. PEARY | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220521R4125 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .