This document contains questions and answers related to a solicitation for the regular overhaul and dry docking of the USNS FALL RIVER (T-EPF 4). The solicitation is being issued by the Department of the Navy's Military Sealift Command and seeks contractor assistance with various repair and maintenance items such as hull crack repair, portable fire extinguisher servicing, and fixed foam firefighting system inspection. Bidders should include costs for COVID-19 mitigation and subcontractor travel in their pricing but may request change orders for additional expenses. Required technical documentation on equipment rooms and modifications will be provided to awardees through the Department of Defense's Safe portal system.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N3220521R2081
QUESTIONS AND ANSWERS #6
QUESTION: #45:
SPECIFICATION ITEM NO.: 0112
PARAGRAPH / SECTION NO: Paragraph 7.1 TITLE: Hull Crack Repair IWO MPDE Exhaust
QUESTION:
The table referenced in paragraph 7.1 requests that the contractor bid each item individually, but shall not bid to accomplish all items. This conflicts with the J-3 Form as it only provides one line to be entered for the entire work item. Will MSC be providing an updated J-3 Form?
ANSWER:
Contractor to bid per 7.1 of WI. Updated J-3 will be provided via DoD Safe.
QUESTION: #46:
SPECIFICATION ITEM NO.: 0929
PARAGRAPH / SECTION NO: Paragraph 3.1.2 (A) TITLE: Hull Crack Repair IWO MPDE Exhaust
QUESTION:
WI identifies quantity of steering and reversing cylinders using information from reference 2.3. Will MSC be providing MSC Drawing No. 556-8612637, SRD Schematic Hydraulic System?
ANSWER:
WI is for contractor to assist Wartsila with repairs. Reference drawing is not needed; Wartsila will be onsite for guidance and directions for repair.
QUESTION: #47:
SPECIFICATION ITEM NO.: Various PARAGRAPH / SECTION NO: Various TITLE: Various
QUESTION
Is the contractor to include COVID-19 related costs, specifically for traveling sub-contractors in it’s initial pricing, or will that be handled via REA?
ANSWER:
COVID requirements for ROM and mitigation plan are covered under WI 90, para 7.3.2. KTR’s can estimate costs of sub travel in WI 90 and request a CCO for any extra.
QUESTION: #48:
SPECIFICATION ITEM NO.: 0570
PARAGRAPH / SECTION NO: Paragraph 7.4 TITLE: Portable Fire Extinguisher Service (1YR)
QUESTION
WI states to test all portable and semi-portable fire extinguishers that are due using the test dates listed in reference 2.1.2. Will MSC be able to provide reference listed?
ANSWER:
Requested info was previous provided. Another copy will be resent via DOD Safe.
QUESTION: #49:
SPECIFICATION ITEM NO.: 0567
PARAGRAPH / SECTION NO: Paragraph 7.6.3 (f) TITLE: Fixed Foam Firefighting System Inspection and Test
QUESTION
WI paragraph states to accomplish sections A and B of reference 2.1.4. Will MSC be able to provide 2.1.4 to the contractor?
ANSWER:
A copy of 2.1.4 (MSFSC SWIRRR 022) will be sent via DOD Safe
QUESTION: #50:
SPECIFICATION ITEM NO.: 111
PARAGRAPH / SECTION NO: 2.2 Enclosures
TITLE: RCS MODIFICATION
QUESTION
Please provide the following:
2.2 Enclosures:
2.2.1 T-EPF Class Equipment Room & Void Space, Frame Brackets and Clips
2.2.2 T-EPF-1 USNS Fall River Ride Control Equipment Room Modifications
ANSWER:
Enclosures will be sent via DoD Safe