This document contains questions and answers related to a solicitation for the regular overhaul and dry docking of the USNS Fall River (T-EPF 4). Key details include:

The solicitation is being conducted by the Department of the Navy's Military Sealift Command for overhaul work on the USNS Fall River, including preservation of voids and bilges, marine evacuation system maintenance, fire extinguisher servicing, and other work items. Bidders should note that total liquidated damages are not to exceed 50% of the contract value. The questions and answers provide clarification such as allowing alternative surface preparation methods where safety is a concern, confirming requirements where questions were asked, and noting that additional documentation would be distributed separately.

View the file

Other files for this federal contract opportunity

Other files attached to USNS FALL RIVER (T-EPF 4) Regular Overhaul/ Dry Dock, newest first.
File Type Posted
Amendment 0006.pdf PDF
Q and A 12.docx DOCX document
Q and A 11.docx DOCX document
Q and A 10.docx DOCX document
Q and A 9.docx DOCX document
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
J - 3 Category B Items Rev 3- FR 21R2081.xls XLS spreadsheet
Q and A 8.docx DOCX document
Q and A 7.docx DOCX document
J - 2 Category A Items FR 21R2081 Rev 2.xlsx XLSX spreadsheet
J - 3 Category B Items Rev 2 - FR 21R2081.xls XLS spreadsheet
Q and A Responses 6.docx DOCX document
Q and A Responses 5.docx DOCX document
Q and A Responses 4.docx DOCX document
Q and A Responses 3.docx DOCX document
N3220521R2081 Amendment 3.docx DOCX document
Updated 2-9-21-J - 10 Interport Differential - FR 21R2081.doc DOC document
Q AND A Responses 2.docx DOCX document
Updated 2-8-21-J - 10 Interport Differential - FR 21R2081.doc DOC document
Amendment 0002.docx DOCX document
Q AND A Responses 1.docx DOCX document
Updated J - 10 Interport Differential - FR 21R2081.doc DOC document
USNS FALL RIVER ROH-DD N3220521R2081.docx DOCX document
J - 12 Past Performance Data - FR 21R2081.doc DOC document
J - 10 Interport Differential - FR 21R2081.doc DOC document
J - 14 Technical Data Non-Disclosure - FR 21R2081 (1).docx DOCX document
J - 9 Disclosure of Lobbying Activities - FR 21R2081.doc DOC document
J - 2 Category A Items FR 21R2081.xlsx XLSX spreadsheet
J - 1 WORK ITEMS LIST FR 21R2081.docx DOCX document
J - 4 GFP FR 21R2081.xlsx XLSX spreadsheet
J - 3 Category B Items - FR 21R2081.xls XLS spreadsheet
J- 7 MSC Ship Repair Facility Survey - FR 21R208.docx DOCX document
J - 13 Past Performance Questionnaire - FR 21R2081.docx DOCX document
J - 11 Dry Dock Evaluation Form - FALL RIVER.docx DOCX document
J - 8 Request for Spec Clarification - FR 21R2081.doc DOC document
J - 6.zip ZIP file
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N3220521R2081

QUESTIONS AND ANSWERS #7

QUESTION: #51: (Updated response to Q and A #5, question #39)

SPECIFICATION ITEM NO.: 604 & 682

PARAGRAPH / SECTION NO: Item Description TITLE: Serial Numbers for MES equipment Sub-Contractor requires serial numbers for the MES and Life rafts onboard USNS Fall River.

Will Ship’s Force be able to provide required serial numbers?

ANSWER:

The current MES are scheduled to be swapped prior to ROH. The MES serial number will be one of the serials listed below based on arrival condition. It is currently undecided if the MES life rafts will be changed out prior to the POP and desired recertification cycle dates.

MES #1 Life Raft serial Number:100.05.05.0914 or 172.02.10.0420 MES #2 Life Raft Serial Number:100.05.01.1014 or 172.02.06.0420

Number #3 Life raft Serial Number:100.04.03.0814 Number #4 Life raft Serial Number:100.04.01.0914 Number #5 Life raft Serial Number:100.04.04.0814 Number #6 Life raft Serial Number:100.04.04.0914

QUESTION: #52:

SPECIFICATION ITEM NO.: 0570

PARAGRAPH / SECTION NO: Paragraph 7.4 TITLE: Portable Fire Extinguisher Service (1YR) WI states to test all portable and semi-portable fire extinguishers that are due using the test dates listed in reference 2.1.2. Will MSC be able to provide reference listed?

ANSWER:

Requested info was previously provided. Another copy will be resend via DoD Safe.

QUESTION: #53:

SPECIFICATION ITEM NO.: RFP

PARAGRAPH / SECTION NO: Section F TITLE: Deliveries or Performance, 52.2011.11 Liquidated Damages RFP notes, “Total Liquidated Damages shall not exceed 50% of the contract value.”

Can MSC confirm that this is not a typographical error; is this the correct value?

ANSWER: Total Liquidated Damages shall not exceed 50% of the contract value in Clause 52.211-11--- LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000) is not a typographical error. The value is correct.

QUESTION: #54:

SPECIFICATION ITEM NO.: RFP

PARAGRAPH / SECTION NO: Section B TITLE: Price Schedule, No. 3 AGR details (d) RFP notes, “If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to: 2) Issue a unilateral modification; or” How does the Government determine a price to be considered fair and reasonable before a unilateral modification is issued?

ANSWER: To determine a price to be fair and reasonable the ACO will compare previously proposed prices and previous Government and commercial contract prices with current proposed prices for like items or Compare proposed prices with prices obtained through market research for the same or similar items.

QUESTION: #55:

SPECIFICATION ITEM NO.: 0102

PARAGRAPH / SECTION NO: 7.3

TITLE: Preservation of Voids and Bilges The WI appears to be incorrect, the JHSV Paint Schedule notes a 2-4 mil angular profile. Will MSC consider changing the 1-1.5mil angular profile requirement to be compliant with the JHSV Paint Schedule?

ANSWER:

Yes, MSC allow the 1-1.5mil angular profile requirement to be compliant with the JHSV Paint Schedule.

QUESTION: #56:

SPECIFICATION ITEM NO.: 0102

PARAGRAPH / SECTION NO: 7.3 & 3.1.3 & Photos sent by DOD safe TITLE: Preservation of Voids and Bilges The WI specifies abrasive blast to an SSPC SP10. The photographs provided of the Engine Room Bilges indicate critical machinery that will be very difficult to contain and protect. Would MSC consider an SSPC SP11 as a safer alternative for Engine Room 1 & 2 Bilges?

ANSWER:

Yes, MSC will allow SSPC SP11 as a safer alternative for Engine Room 1 & 2 Bilges.

QUESTION: #57:

SPECIFICATION ITEM NO.: 591

PARAGRAPH / SECTION NO: 7.1.2

TITLE: STERN RAMP HOSE OEM SUPPORT

Work Item states “surface preparation is to be abrasive blast to an SSPC SP10 or as directed by OMT REP.” Would MSC consider WJ-2 an acceptable alternative?

ANSWER:

Contractor to bid for SSPC SP10. OEM Rep will determine alternate method is feasible.

QUESTION: #58:

SPECIFICATION ITEM NO.: 682

PARAGRAPH / SECTION NO: Entire Spec

TITLE: MARINE EVACUATION SYSTEM (MES)

Per the LSA Technical Representative, the serial numbers provided for the slides, indicate a 6YR water evacuation/deployment is not within periodicity. Would MSC consider removing this requirement from the specification?

ANSWER:

Contractor to bid per the specification. Any changes will be descoped if required.

QUESTION: #59:

SPECIFICATION ITEM NO.: 929, 934, & 966

PARAGRAPH / SECTION NO: J-2

TITLE: Missing WIs from J-2 Contractor notes missing WIs from J-2:

929, 934, & 966

SECTION 900 DRYDOCK

CATEGORY “A” WORK ITEMST-ALTCategory
929WATERJET MAINT. INTERIM DOCKINGN/AA
934INSPECT SEA VALVES AND SEA CHESTSN/AA
966SHAFT ALIGNMENT AND BEARING REACTION CHECKSN/AA

ANSWER:

Updated J-2 will be sent via DoD Safe.