J - 3 Category B Items Rev 3- FR 21R2081.xls
XLS spreadsheet 51 KB Posted
- Attached to
- USNS FALL RIVER (T-EPF 4) Regular Overhaul/ Dry Dock Federal contract opportunity
- Solicitation number
- N3220521R2081
About this file
This document contains a contractor price breakdown template for category B items for a ship overhaul contract opportunity. The template includes line items for general requirements, physical security, vessel cleaning, and continuation of services during overhaul. It requests pricing for individual work items such as hull crack repair, aluminum structure work, machinery support and maintenance, including reverse osmosis, fire pumps, air compressors and vacuum sewage systems. The related federal contract opportunity is a solicitation for overhaul and drydocking of the USNS Fall River under solicitation number N3220521R2081 issued by the Department of the Navy Military Sealift Command. Pricing is required for category B contractor-responsible items using the template format. The response due date and award date are not provided.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 025/7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | CHARLIE | 1 | Day | - 0 | $ - 0 | $0 | |||||||||
| 025/7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | DELTA | 1 | Day | - 0 | $ - 0 | $0 | |||||||||
| 025/7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | CHARLIE | 10 | Day | - 0 | $ - 0 | $0 | |||||||||
| 025/7.13 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | DELTA | 10 | Day | - 0 | $ - 0 | $0 | |||||||||
| 026 | VESSEL FINAL CLEANING | $ - 0 | $0 | |||||||||||||
| 030 | CONTINUATION OF SERVICES | |||||||||||||||
| 030/7.1 | OVERHAUL MANAGEMENT TEAM SERVICES (B-ITEMS) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.2 | GENERAL SERVICES FOR THE SHIP (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.3 | TELEPHONE SERVICES (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.4 | PROJECT PLANNING AND MONITORING (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.5 | FIRE PORTECTION AND SHIPS SAFETY (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.6 | DELIVERY CARE AND REDELIVERY OF THE VESSEL (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.7 | SHIP[BOARD ACCESS AND SECURITY (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 030/7.8 | GAS FREE CERTIFICATES (B-ITEM) | 30 | Day | - 0 | $ - 0 | $0.00 | ||||||||||
| 100 | HULL STRUCTURE | |||||||||||||||
| 112 | HULL CRACK REPAIR IWO MPDE | - 0 | $ - 0 | $0 | ||||||||||||
| 112/7.1.a | MPDE Flange Quantity- One (1) flange | |||||||||||||||
| 112/7.1.b | MPDE Flange Quantity- Two (2) flanges, Located in Separate Engine Rooms | |||||||||||||||
| 112/7.1.c | MPDE Flange Quantity- Two (2) flanges, Located in the Same Engine Room | |||||||||||||||
| 112/7.1.d | MPDE Flange Quantity- Three (3) flanges | |||||||||||||||
| 112/7.1.e | MPDE Flange Quantity- Three (4) flanges | |||||||||||||||
| 113 | WELD MISC ALUMINUM STRUCTURE | - 0 | $ - 0 | $0.00 | ||||||||||||
| 200 | PROPULSION MACHINERY | |||||||||||||||
| 203 | SUPPORT FOR MPDE MAINTENANCE | - 0 | $ - 0 | $0.00 | ||||||||||||
| 204 | SUPPORT FOR SSDG MAINTENANCE | $0.00 | ||||||||||||||
| 500 | MACHINERY, AUXILIARY | |||||||||||||||
| 505 | REVERSE OSMOSIS ANNUAL MAINTENANCE | $ - 0 | $0.00 | |||||||||||||
| 510 | FIRE PUMPS & MOTORS OVERHUAL | $ - 0 | $0.00 | |||||||||||||
| 511 | HIGH PRESSURE AIR COMPRESSOR MAINTENANCE | $ - 0 | $0.00 | |||||||||||||
| 517 | VACUUM SEWAGE COLLECTION SYSTEM MAINT. | $ - 0 | $0.00 | |||||||||||||
| 591 | STERN RAMP HYDRAULIC HOSE REPLACEMENT | $ - 0 | $0.00 |
&L&"Times New Roman,Regular"&12USNS CITY OF BISMARCK (T-EPF 9) MTA&C&"Times New Roman,Regular"&14CONTRACTOR PRICE BREAKDOWN &"Times New Roman,Bold"CATEGORY "B" ITEMS&R&"Times New Roman,Regular"&14N3220520R4078
&CATTACHMENT J-3
File details come from the government source that posted it. Updated .