BRASHERA_AMENDMENT_0006.docx

DOCX document 41 KB Posted

Attached to
Repair and Overhaul Dry Docking USNS CARL BRASHEAR
Solicitation number
N3220519R4260
Issued by

About this file

Amendment 0006

View the file

Other files

File Type Posted
BRASHERA_AMENDMENT_0007.doc DOC document
J_-_2_Category_A_REV_002.xls XLS spreadsheet
J_-_3_REVISION_002_Category_B_Items.xls XLS spreadsheet
J_-_2_REVISION_Category_A_Items.xls XLS spreadsheet
611_MSC_Circ_1331Guidlines_for_Embarkation.pdf PDF
J_-_3_REVISION_Category_B_Items.xls XLS spreadsheet
BRASHEAR_AMENDMENT_0005.doc DOC document
0528_B_Food_Waste_Transfer_Pump_Overhaul.docx DOCX document
0307_B_MOTOR_CONTROL_CENTER_M05_ALTERNATE_POWER_SOURCE_(T-ALT_370).docx DOCX document
BRASHEAR_AMENDMENT_0004.doc DOC document
8391502_A.pdf PDF
0522_A_Magazine_Drain_Piping_Replacement_Rev_A.doc DOC document
8391502_-.pdf PDF
0527_B_Grey_Water_Transfer_Pump_Overhaul.docx DOCX document
0569_B__SW_Check_Valve_Clean_and_Repair_(VR18-0036-55).docx DOCX document
0105_A_DECK_HOUSE_CLEANING_AND_PAINTING_(SPOT_BLAST)_REV_A.docx DOCX document
0227_A_MDG_Attached_Lube_Oil_Pump_Rebuilds.doc DOC document
0530_A_CARGO_AND_AC_30K_HR_COMPRESSOR_REPLACEMENT_REV_A.docx DOCX document
T6225-MS-MMC-010_0_0_(Tech_Manual).pdf PDF
0540_A_No1_Mooring_Capstan_Leak_Repair.doc DOC document
0104_A_Mechanically_Clean_and_Preserve_Tanks_Rev_A.docx DOCX document
0627_B_04_Lounge_Stratica_Deck_Covering_and_Removals_(VR_18-0049).doc DOC document
0507_A_DISTILLER_CLEANING_INSPECTION_AND_MAINTENANCE.doc DOC document
0517_A_Cargo_Defrost_Brine_Heater_Replacement_(VR16-0069)_Rev_A.doc DOC document
0217_A_9_CYLINDER_MAIN_DIESEL_ENGINE_30,000_HOUR_SCHEDULED_MAINTENANCE_R....docx DOCX document
0904_A_STERN_TUBE_SEAL_INSPECTION_(SW_SYS)_REV_-_(CSI).docx DOCX document
AMENDMENT_BRASHEAR_0003.doc DOC document
0216_A_8_CYLINDER_MAIN_DIESEL_ENGINE_30,000_HOUR_SCHEDULED_MAINTENANCE_R....docx DOCX document
BRASHEAR_AMENDMENT_0001.doc DOC document
BRASHEAR_AMENDMENT_0002.doc DOC document
J-4__BRASHEAR_GFP_Module_AttachmentTemplate_-_Rev_3_5_Mar_(3)_1.xlsx XLSX spreadsheet
J_-_4_CARL_BRASHEAR_MAR_2019_ROH_GFM_REPORT_10-05-18.xlsx XLSX spreadsheet
J_-_6_BRASHEAR.pdf PDF
J_-_7_MSC_Ship_Repair_Facility_Survey.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_12_Past_Performance_Data.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_14_Technical_Non-Disclosure_Agreement.docx DOCX document
J_-_15_Non-Mariner_Maintenance_Contractor_Vetting_Sheet_(Rev_8_(v4)_20_Sep_2017)_(002).xlsx XLSX spreadsheet
N3220519R4260_BRASHEAR.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220519R4260

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

THIS IS THE MSC SOLICITATION TEMPLATE EFFECTIVE 11 OCTOBER 2018. ALL OTHER TEMPLATES ARE OUTDATED AND WILL NOT BE USED. THIS NOTICE SHALL BE DELETED PRIOR TO SOLICITATION BEING PUBLISHED.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "A" Work Items (WIs)

FFP

Prepare for and accomplish the ROH/DD of the USNS CARL BRASHEAR (T-AKE 7) Total Category "A" WIs $_____________

Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4

Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2

Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2

Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.4.7

Proposed unit price per crane usage $______ IAW WI 11, 7.9.1

Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.3 ______%

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

AGR and ODC

AGR

(10,000) man-hours @ $________ per man-hour = $_____________

ODC

Base $1,250,000.00

Proposed G&A Rate _______________% Subtotal: $_____________

Proposed Profit Rate _______________% Subtotal: $_____________

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0025

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Bravo - Delta

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0030

WI 0030 - Continuation of Services

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

Category "B" WI 902

WI 902 - Dry Docking and Undocking Vessel

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 307

WI 307 - Motor Control Center M05 Alternate Power Sourcd

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO

0007
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 527

WI 527 - Grey Water Transfer Pump Overhaul

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO

0008
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 528

WI 528 - Food Waste Transfer Pump Overhaul

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO

0009
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 569

WI 569 – SW FM Check and Isolation Valve Replacement

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO

0010
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 627

WI 627 - 04 Lounge Stratica Deck Covering and Removals

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO

0011
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 105

WI 105 - Deck house Cleaning and Painting (Spot Blast)

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO

0012
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 583

WI 583 - Overhaul CHATCO Valves and Tune

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor. FOB: Destination

NET AMT

0013
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 607

WI 607 - Replace Cargo Hold Grating Near Elevators

Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor. FOB: Destination

NET AMT

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0013 $______________

The contractor shall enter the total proposed price of all CLINs.

CLAUSES INCORPORATED BY FULL TEXT

PART I - THE SCHEDULE

Section B, Price Schedule, detailed information

CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.

CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded manhour rate and not separately priced.

The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

The base cost, stated in this CLIN does not include the profit or G&A rates.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

CLINs 0003 through 0013 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0013 pricing.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard WIs included for this solicitation:

CATEGORY A WORK ITEMS

001
Intent, Scope, General Conditions And Definitions
002
Technical And Manufacturer's Representative
003
Approach, Berth, And Mooring Requirements
004
Testing And Quality Assurance
005
Electrical Safety Procedure Requirements
006
Heavy Weather Plan
007
Cold Weather Plan
010
Furnish Office For Overhaul Management Team (OMT)
011
Furnish General Services
012
Telephone Services
013
Project Planning And Production Status Monitoring Report
014
Preparation Of Weight And Moment Report
015
Integrated Logistics And GFM Support Requirements
016
Fire Protection And Ship's Safety Program
017
Handling Ship's Stores
018
Delivery And Redelivery Of Vessel
019
Shipboard Access And Security
020
Gas Free Certificate
021
Clean And Gas Free Tanks, Voids, Cofferdams And Spaces
022
Dock Trials And Sea Trials
023
Hazardous Waste Disposal At A Contractor's Facility
024
Physical Security at Private Contractor’s Facility
0101
Ballast Tank Zinc Inspection
0102
Open Clean Inspect Tank Vent Goosenecks
0103
Tank Coating Gray WTR And FD Waste
0104
Mechanically Clean And Preserve Tanks
0106
Joiner Door Replacement
0107
Wasted Penetrations Replacements
0201
Propulsion Motor And Cooler Cleaning, Insp & Maint.
0202
Main Engine Flexible Connection Replacement (10-Yr)
0204
MDE Automation Annuals
0205
Automation And Propulsion Control Inspection And Test
0206
Vulkan Coupling Annual Inspection
0207
Propulsion Motor Pedestal Bearing Inspection (Renk)
0208
Propulsion Motor Delamination Inspection
0216
8 Cylinder Main Diesel Engine 30k Hr Sch Maintenance
0217
9 Cylinder Main Diesel Engine 30k Hr Sch Maintenance
0224
MDE 1 Through 4 Governor Service
0225
MDE Charge Air Cooler Inspection And Re-gasket
0227
MDG Attached Lube Oil Pump Rebuilds
0301
Cleaning Main Generator And Propulsion Control System
0303
HV-SS-Emergency Switchboard Cleaning
0401
Bridge Equipment Annual Service
0402
Antenna Pm
0403
Comms Sys Pm
0404
Oe-570 Antenna System Maintenance
0405
Antenna Rigging Photos
0406
AIS/DGPS Renewal (T-Alt 437)
0501
Firefighting Inspection And Testing (10-Yr)
0502
SCBA Annual Inspection
0503
SCBA Air Compressor And Filling Station Inspection/Maint.
0504
Cargo Crane Maintenance And Retesting (10-Yr)
0506
Emergency Diesel Generator Annual Testing And Inspection
0507
Distilling Plant Maintenance (5-Yr)
0514
Relief Valve Testing
0515
Open And Inspect Air Receiver And HP Flasks
0516
Sewage System Piping And Cleaning
0517
Cargo Brine Defrost Brine Heater Replacement
0518
Brine System Flush
0519
Flush HT Lt Freshwater And Chill WTR Systems
0520
Overhaul Cla Vals
0521
Vane Axial Fan Motor Overhauls
0522
Magazine Drain Piping Replacement
0523
MSD Tank And Piping Repairs
0530
Cargo And Ac 20 Hour Compressor Overhaul Replacement
0540
No 1 Mooring Capstan leak Repair
0542
MMR AFFF Foam System Piping Replacement (T-Alt 394)
0543
FWD AFFF Foam System Piping Replacement (T-Alt 394)
0546
Incinerator Inspection And Maintenance
0556
Steering Gear Preventative Maintenance
0557
Charging Pump And Motor Overhaul
0558
Salt Water Pump And Motor Repair 1, 2, And 3
0564
1 2 And 3 Lube Oil Cooler Cleaning And Gasket Replacement
0568
Magazine Drain Piping Replacement
0601
Lb, Rhib, Davits And Accom Ladders Annuals
0602
Accom Ladder Insp And Load Testing
0603
Lifeboat Certification And Falls Renewal
0604
Rhib Maintenance And Falls Renewal
0605
Liferaft Annual Certification
0606
Flight Deck Non-Skid Renewal
0607
Replace Cargo Hold Grating Near Elevators
0608
Accomidation Ladder Outriggers Install
0609
Fall Protection Anchors (T-Alt 350)
0610
Galley Equipment Calibration
0611
Roller Curtain Door Hood Assembly Replacement
0624
MSD Tank And Vcht Holding Tanks Coating
0626
Flight Deck Hatch Wire Rope Replacement (T-Alt 450)
0801
Galley And Laundry Exhaust Duct Cleaning
0806
Replace Of Cooling Coil Fasteners And Inspection
0807
Air Handler And Fan Coil Units Cleaning
0809
Galley HVAC Modifications (T-ALT 330)
0812
Cargo Reefer And AC Plants Expansion Joints Replacement
0901
Docking And Undocking
0903
Propeller Shaft And Stern Tube Inspection
0905
Bow Thruster Maintenance
0907
Polish Bow Thruster Propeller
0908
Renew Seachest Rope Guard And Bt Zincs
0909
Anchor And Anchor Chain Ranging
0910
Overhaul Sea Valves
0911
Inspect And Repair Cathodic Protection
0912
Shaft Grounding Maintenance
0913
Renew Waster Pieces
0914
Bilge Keel Repairs
0915
Seachest Attachment System Upgrade Installation (T-Alt 296)
0916
Underwater Hull Cleaning And Painting (Spot Blast)
0917
Freeboard Cleaning And Painting (Near White Blast)
0919
Rudder Gland Seal Lower Bearing Inspection
0931
Fresh Water (Closed Loop) Stern Tube Lubrication (T-Alt 403)
1001
Ram Tensioners Remove And Replace
1002
Hp Air Flask Inspection
1003
Hp Air Gauge Calibration
1006
Winch Control (Controlex) Riser
1007
Hauling Winch Band Brake Refurbishment

CATEGORY B WORK ITEMS

025 Physical Security at Private Contractors Facility 030 Continuation of Services 105 Deck House Cleaning and Painting 307 Motor Control Center M05 Aletnate Power Source 527 Grey Water Transfer Pump Overhaul 528 Food Waste Transfer Pump Overhaul 569 SW Check Valve Clean and Repair 583 Overhaul CHATCO Valves and Tune) 607 Replace Cargo Hold Grating Near Elevators (T-ALT 388) 627 04 Louge tratica Deck Covering and Removals 902 Dry-Docking and Undocking Vessel

The following were previously included by full text and are now included by reference:

Acronym Table
Acronym Table
APR 2018

(End of Summary of Changes) image1.wmf