SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
REQUEST FOR CLARIFICATIONS
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 226
PARAGRAPH / SECTION NO ALL
TITLE: MDG Crank Case Demister Installation
QUESTION:
WI 226 MDG Crank Case Demister Installation is listed in the J-2 price sheet but a work item specification was not provided. Should contractor remove from the price sheet or will the work item be forthcoming.
ANSWER:
Yes, Contractor should remove from price sheet.
SPECIFICATION ITEM NO.: 0104
PARAGRAPH / SECTION NO 3.0 & 4.1
TITLE: MECHANICALLY CLEAN AND PRESERVE TANKS
Contractor cannot estimate work scope based on cubic meters. Please provide square footage/meters of surface area in each tank and percentage contactor is to mechanically prep for coating repair. (for estimating purposes)
Additionally, GFM listed in paragraph 4.1 appear to be excessive. Please confirm.
ANSWER:
Please see attached Work Item with updated square footage and quantities. Please also note preparation standards in revised Work Item.
SPECIFICATION ITEM NO.: 0103
PARAGRAPH / SECTION NO 7.6.1
TITLE: Tank Coatings Gray WTR and FD Waste
Paragraph 7.6.1 “In the Grey water collection tank, replace the existing support brackets with new, zinc, and install missing brackets. Replace fill pipe, suction pipe, and sprinkling pipe.”
Please provide size and quantity of “support brackets” Please advise what the word “zinc” is to infer. Is contractor to renew zincs? If so, how many and what size?
Please advise what size and how many missing brackets.
Please advise what size and quantity of fill piping to replace.
Please advise what size and quantity of suction piping to replace.
Please advise what size and quantity of sprinkler piping to replace.
ANSWER:
Requirement shall be adjusted for open and inspect and shall be subject to visual inspections. Upon need of repair; CFR shall be submitted to government for response. CCO will be issued accordingly to make necessary repairs.
SPECIFICATION ITEM NO.: 0514
PARAGRAPH / SECTION NO 3.3, 7.6.1 & 7.7
TITLE: RELIEF VALVE TESTING REV-
7ea new valves are listed in paragraph 3.3 as contractor furnished material. Paragraphs 7.6.1 & 7.7 suggest these valves are GFM which they normally are due to lead time.
Please clarify if valves are GFM or CFM.
ANSWER:
Government requests valve be procured as Contractor Furnished Material.
SPECIFICATION ITEM NO.: 0517
PARAGRAPH / SECTION NO 2.1
TITLE: CARGO DEFROST BRINE HEATER REPLACEMENT
1.1 Reference 2.1 could not be found in the provided Drawings. Please provide MSC DWG 516-8387086; Cargo Refrigeration Secondary Coolant Circ System Diagram
ANSWER:
Please utilize drawing “8387387_-.pdf” included with reference package.
SPECIFICATION ITEM NO.: 0522
PARAGRAPH / SECTION NO 2.1
TITLE: MAGAZINE DRAIN PIPING
Reference 2.1 could not be found in the provided Drawings. Please provide MSC Drawing 522-8386983, Cargo Hold Sprinkling System Diagram.
ANSWER:
Please utilize drawing “8387385_-.pdf” included with reference package.
SPECIFICATION ITEM NO.: 0527
PARAGRAPH / SECTION NO 2.2
TITLE: GREY WATER TRANSFER PUMP OVERHAUL REV -
Please provide Reference 2.2.
Technical Manual, T6225-MS-MMC-010, Pumps, Centrifugal, 0510 Vortex. This tech manual is also required for work item 0528.
ANSWER:
Please see attached reference Technical Manual.
SPECIFICATION ITEM NO.: 0545
PARAGRAPH / SECTION NO 2.0, 3.0, 7.0
TITLE: COUNTER MEASURE WASH DOWN SYSTEM PIPING REPLACEMENT (Zone 4 Exterior)
Paragraphs 7.2.3, 7.3.3 & 7.4.2 direct contractor to accomplish removals & installations per ref 2.1.3 Ref 2.1.3 has all four zone dwgs referenced. Is this the intent?
Paragraph 7.3.5 says all pipes shall be terminated and flanged inside the first bhd penetration with carbon steel flanges, but paragraph 3.1.1.1 says location is Zone 4, FR 58 Aft (2d to 08 Lvl). Please clarify location and quantity
Paragraphs 4.2.1 & 2.1.4 both reference the GFM list, but the J-4 GFM list does not have any material for this work item. Please clarify.
ANSWER:
Work Item will be omitted from work package, please dis-regard, no pricing required.
SPECIFICATION ITEM NO.: 0569
PARAGRAPH / SECTION NO 3.1.2, 4.1, 7.5
TITLE: SW/FM CHECK AND ISOLATION VALVE REPLACEMENT
Quantities listed in Paragraph 3.2.1 do not match those in Paragraph 4.1 or 7.5.
Please clarify quantity of valves to remove and replace.
ANSWER:
Work Item has been modified and adjusted to Cat B, please see attached updated work item and quantities.
SPECIFICATION ITEM NO.: 0809
PARAGRAPH / SECTION NO 2.2
TITLE: GALLEY HVAC MODIFICATIONS (T-ALT 330)
Reference 2.2 GALLEY HVAC ELECTRICAL seam to missing from the provided reference package. This reference will be required for contractor to provide complete and accurate pricing for work item 0809.
ANSWER:
Please see drawing 8391502_-A.pdf in reference package. Or attached:
(End of Summary of Changes) _1604991532.pdf
300-8391502A SHT 1 (1)
300-8391502A SHT 2 (1)
300-8391502A SHT 2A (1)
300-8391502A SHT 3 (1)
300-8391502A SHT 4 (1)
300-8391502A SHT 4A (1)
300-8391502A SHT 4B (1)
300-8391502A SHT 5 (1)
300-8391502A SHT 5A (1).pdf