0569_B__SW_Check_Valve_Clean_and_Repair_(VR18-0036-55).docx

DOCX document 34 KB Posted

Attached to
Repair and Overhaul Dry Docking USNS CARL BRASHEAR
Solicitation number
N3220519R4260
Issued by

About this file

REVISED WI

View the file

Other files

File Type Posted
BRASHERA_AMENDMENT_0007.doc DOC document
J_-_2_Category_A_REV_002.xls XLS spreadsheet
J_-_3_REVISION_002_Category_B_Items.xls XLS spreadsheet
BRASHERA_AMENDMENT_0006.docx DOCX document
J_-_2_REVISION_Category_A_Items.xls XLS spreadsheet
611_MSC_Circ_1331Guidlines_for_Embarkation.pdf PDF
J_-_3_REVISION_Category_B_Items.xls XLS spreadsheet
BRASHEAR_AMENDMENT_0005.doc DOC document
0528_B_Food_Waste_Transfer_Pump_Overhaul.docx DOCX document
0307_B_MOTOR_CONTROL_CENTER_M05_ALTERNATE_POWER_SOURCE_(T-ALT_370).docx DOCX document
BRASHEAR_AMENDMENT_0004.doc DOC document
8391502_A.pdf PDF
0522_A_Magazine_Drain_Piping_Replacement_Rev_A.doc DOC document
8391502_-.pdf PDF
0527_B_Grey_Water_Transfer_Pump_Overhaul.docx DOCX document
0105_A_DECK_HOUSE_CLEANING_AND_PAINTING_(SPOT_BLAST)_REV_A.docx DOCX document
0227_A_MDG_Attached_Lube_Oil_Pump_Rebuilds.doc DOC document
0530_A_CARGO_AND_AC_30K_HR_COMPRESSOR_REPLACEMENT_REV_A.docx DOCX document
T6225-MS-MMC-010_0_0_(Tech_Manual).pdf PDF
0540_A_No1_Mooring_Capstan_Leak_Repair.doc DOC document
0104_A_Mechanically_Clean_and_Preserve_Tanks_Rev_A.docx DOCX document
0627_B_04_Lounge_Stratica_Deck_Covering_and_Removals_(VR_18-0049).doc DOC document
0507_A_DISTILLER_CLEANING_INSPECTION_AND_MAINTENANCE.doc DOC document
0517_A_Cargo_Defrost_Brine_Heater_Replacement_(VR16-0069)_Rev_A.doc DOC document
0217_A_9_CYLINDER_MAIN_DIESEL_ENGINE_30,000_HOUR_SCHEDULED_MAINTENANCE_R....docx DOCX document
0904_A_STERN_TUBE_SEAL_INSPECTION_(SW_SYS)_REV_-_(CSI).docx DOCX document
AMENDMENT_BRASHEAR_0003.doc DOC document
0216_A_8_CYLINDER_MAIN_DIESEL_ENGINE_30,000_HOUR_SCHEDULED_MAINTENANCE_R....docx DOCX document
BRASHEAR_AMENDMENT_0001.doc DOC document
BRASHEAR_AMENDMENT_0002.doc DOC document
J-4__BRASHEAR_GFP_Module_AttachmentTemplate_-_Rev_3_5_Mar_(3)_1.xlsx XLSX spreadsheet
J_-_4_CARL_BRASHEAR_MAR_2019_ROH_GFM_REPORT_10-05-18.xlsx XLSX spreadsheet
J_-_6_BRASHEAR.pdf PDF
J_-_7_MSC_Ship_Repair_Facility_Survey.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_12_Past_Performance_Data.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_14_Technical_Non-Disclosure_Agreement.docx DOCX document
J_-_15_Non-Mariner_Maintenance_Contractor_Vetting_Sheet_(Rev_8_(v4)_20_Sep_2017)_(002).xlsx XLSX spreadsheet
N3220519R4260_BRASHEAR.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS CARL BRASHEAR

(T-AKE 7)

MACHINERY, AUXILIARY SYSTEMSN32205-19-R-4260
27 November 2018
ITEM NO. 569Category “B”MSC/N756/JCO

SW CHECK VALVE CLEAN AND REPAIR (VR18-0036/55)

1.0 ABSTRACT:

1.1. This item describes the requirement to remove and clean system valves in the Central Seawater Systems.

2.0 REFERENCES:

2.1. MSC Dwg No. 256-8386986; Central Seawater Cooling System Diagram

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location/Quantity:

3.1.1. Various locations in the Main Machinery Room, Auxiliary Machinery Room, Fwd Pump Room, Aft Pump Room

3.1.2. Quantity: Seventy-Six (3) Check Valves Valves

3.2. Item Description/Manufacturer’s Data: Lugged Butterfly Valves.

3.2.1. Bill of Materials (Contractor Furnished):

Description
Part Number
Quantity
Anti-Seize Compound
N/A
3 Bottles
Gasket Material
N/A
40 sqft
Lagging Material Various Sizes
N/A
60 sqft
Lagging Paste
N/A
2 gals

3.2.2. The contractor will provide all material to remove and clean the valves, e.g., valves, gaskets, etc., in order to install a fully functional system which meets the requirements of this specification.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1. Government Furnished Material:

Valve Size
Description
Quantity
20 inch
Wafer Check Valve (P/N T01-20F-18MX)
3 each

5.0 NOTES:

5.1. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.

5.2. The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.3. THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4. THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.

7.1.1. Cleanliness of the system piping is of the utmost importance. Open pipe must be covered immediately to prevent contamination from various sources.

7.1.2. The covers shall be strong, durable material to prevent rupture and shall be securely fastened to prevent them from being dislodged by normal rough handling. Loose-fitting covers (wood plugs or rags) are not satisfactory. A full face gasket shall be in place between the pipe flange and the cover used.

7.2. Remove all interferences including deck plates and pipe hangers as required to facilitate this repair. Open deck area shall have a safety barrier installed for the safety of ship’s crew. Provide Staging as required to reach valves.

7.3. Remove lagging where installed. Replace lagging pads with new.

7.4. Rigging services will be required to remove valves.

7.5. The following valves are to be replaced with GFM provided valves:

7.5.1. Central Seawater Cooling System Valves:

· SW-V-8

· SW-V-10

· SW-V-13.

7.6. Where installed, temporarily remove (Rig off) motor operators and secure in place as to prevent damage. Do not disconnect electrical wiring.

7.7. Remove flange shielding. Retain flange shielding for reuse if in good condition. Flange shield retained must me clearly marked as to install in the same location as removed.

7.8. Prior to removal of any fasteners, install a containment underneath valves to capture any residual fluid remaining in the system.

7.9. Remove the flange fasteners; bag and tag the fasteners and retain for reuse, die all threads.

7.10. Remove (Rig-out) the existing valve and convey to shop for cleaning, inspection and testing. Fasteners will be coated with Anti-Seize compound prior to reinstallation.

7.11. Reinstall (Rig in place) motor operators where removed in paragraph 7.5.

7.12. Inspection/Test:

7.12.1. Provide hydrostatic test of valves prior to installation. Perform shop test of valves. Hydro body and one side of check valves.

7.12.2. Perform Operational test of valves replaced. Verify valves open and close easily and smoothly throughout the operating cycle without binding. MSCREP to witness operational testing.

7.12.3. Perform hydrostatic test using system pressure for valves replaced. MSCREP to witness hydrostatic testing. Satisfactory test criteria are zero leakage at the flanges.

7.13. Preparation of Drawings/Documentation:

7.13.1. Provide a final report in PDF format; results of the operational test for each valve, and results of system pressure hydrostatic test of each valve.

7.14. PAINTING/LAGGING:

7.14.1. Paint all new and disturbed surfaces to match surrounding surfaces.

7.14.2. Renew lagging where old lagging was removed. Paint all new and disturbed surfaces to match surrounding surfaces.

8.0 GENERAL REQUIREMENTS: None additional.

569-1