0627_B_04_Lounge_Stratica_Deck_Covering_and_Removals_(VR_18-0049).doc
DOC document 66 KB Posted
- Solicitation number
- N3220519R4260
About this file
REVISED WI
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS CARL BRASHEAR
(T-AKE 7)
outfit, furnishings and habitability N32205-19-R-4260
20 November 2018
ITEM NO. 627
Category "B"
MSC/N756/JCO
04 LOUNGE STRATICA DECK COVERING and REMOVALS (VR18-0049)
1.0 ABSTRACT:
1.1 This work item describes the requirements for the removal of the existing deck tile covering and underlayment in the Crew Lounge and replacing it with Stratica Deck Covering.
2.0 REFERENCES/ENCLOSURES:
2.1 NAVSEA Technical Manual, Chapter 634 "Deck Covering".
2.2 COMSCINST: 4750.2C, Preservation Instruction For MSC Ships;
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity:
3.1.1 Locations: Lounge (04-61.5-01)
Quantity: Two Thousand Seven Hundred Seventy Four Square Feet (approximately square 700 feet).
3.2 Description and Bill of Material Contractor Furnished (CFM):
3.2.1 Spacia by Mannington, Warm Cherry, SS5W2506, 36 x 4 planks, 27 square feet per box . Total of One Hundred Eighty-Five Boxes of Spacia by Mannington, Warm Cherry will be required.
3.2.2 Acrylic Adhesive 373 X 4 gallon pail. Total of Twenty-Eight(28) X 4 gallon pails of Acrylic Adhesive 373 will be required.
3.2.3 Spacia by Mannington, Warm Cherry, (or equal to match) 4” Cover Base Molding. Total of 5,000 linear feet.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.
5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.
5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Arrangements/Outfitting:
7.1.1 Protect adjacent work areas, furniture, finish surfaces and personal belongings from damage prior to performing any work.
7.1.2 Temporarily remove all interferences prior to starting work and re-install them when all work is completed.
7.1.3 Unbolt and remove all existing furniture, base units, and equipment that is mounted on top of tile deck covering. Retain for partial reinstallion after completion of deck covering.
7.1.4 Remove existing cove base molding, thresholds, existing vinyl tiles, adhesives, dirt, debris and associated trim as required to facilitate the installation of new deck covering.
7.1.5 Properly dispose of all removed debris in accordance with State, and Local regulations. All areas to be cleaned and debris removed the ship daily.
7.2 Installation:
7.2.1 Deck must be completely free of adhesive, oxidation and oily residue prior to application of manufacturer’s recommended metal primer.
7.2.2 Fill any cracks, grooves, depressions, and other irregularities with high quality MFG recommended cement based patching or underlayment compound for filling or smoothing. Patching or underlayment compound shall be moisture, mildew, and alkali-resistant.
7.2.3 Ensure all surfaces to be covered are completely clean, dry and smooth and that all subfloor preparation has been completed and documented.
7.2.4 Install STRATICA Deck Covering System in accordance with the Manufacturer’s specification.
7.2.5 Install Stratica Deck Covering molding, thresholds, and associated trim removed in Section 7.1.
7.2.6 Reinstall and secure all furniture, base units, and equipment that was removed in Section 7.1. Do not re-install, 3 each night stands, 1 each coffee table, and two aft Stbd Computer Desks as designated by MSC REP.
7.2.7 Final inspection shall be conducted by the Port Engineer, and or the MSCREP.
7.2.8 Submit final service report detailing conditions found, materials used, and results of final inspection to the Chief Engineer and the MSCREP.
7.3 Possible Stratica Supplier:
American Oceanic Coatings Corporation.
5048 Cleveland Street, Virginia Beach, VA 23462
Tel:757.490.0445 – Fax:757.671.1598
Email: jcopelli@americanoceanic.com, msanders@americanoceanic.com
8.0 GENERAL REQUIREMENTS: None Additional.
627-1
File details come from the government source that posted it.