0307_B_MOTOR_CONTROL_CENTER_M05_ALTERNATE_POWER_SOURCE_(T-ALT_370).docx

DOCX document 38 KB Posted

Attached to
Repair and Overhaul Dry Docking USNS CARL BRASHEAR
Solicitation number
N3220519R4260
Issued by

About this file

REVISED WI

View the file

Other files

File Type Posted
BRASHERA_AMENDMENT_0007.doc DOC document
J_-_2_Category_A_REV_002.xls XLS spreadsheet
J_-_3_REVISION_002_Category_B_Items.xls XLS spreadsheet
BRASHERA_AMENDMENT_0006.docx DOCX document
J_-_2_REVISION_Category_A_Items.xls XLS spreadsheet
611_MSC_Circ_1331Guidlines_for_Embarkation.pdf PDF
J_-_3_REVISION_Category_B_Items.xls XLS spreadsheet
BRASHEAR_AMENDMENT_0005.doc DOC document
0528_B_Food_Waste_Transfer_Pump_Overhaul.docx DOCX document
BRASHEAR_AMENDMENT_0004.doc DOC document
8391502_A.pdf PDF
0522_A_Magazine_Drain_Piping_Replacement_Rev_A.doc DOC document
8391502_-.pdf PDF
0527_B_Grey_Water_Transfer_Pump_Overhaul.docx DOCX document
0569_B__SW_Check_Valve_Clean_and_Repair_(VR18-0036-55).docx DOCX document
0105_A_DECK_HOUSE_CLEANING_AND_PAINTING_(SPOT_BLAST)_REV_A.docx DOCX document
0227_A_MDG_Attached_Lube_Oil_Pump_Rebuilds.doc DOC document
0530_A_CARGO_AND_AC_30K_HR_COMPRESSOR_REPLACEMENT_REV_A.docx DOCX document
T6225-MS-MMC-010_0_0_(Tech_Manual).pdf PDF
0540_A_No1_Mooring_Capstan_Leak_Repair.doc DOC document
0104_A_Mechanically_Clean_and_Preserve_Tanks_Rev_A.docx DOCX document
0627_B_04_Lounge_Stratica_Deck_Covering_and_Removals_(VR_18-0049).doc DOC document
0507_A_DISTILLER_CLEANING_INSPECTION_AND_MAINTENANCE.doc DOC document
0517_A_Cargo_Defrost_Brine_Heater_Replacement_(VR16-0069)_Rev_A.doc DOC document
0217_A_9_CYLINDER_MAIN_DIESEL_ENGINE_30,000_HOUR_SCHEDULED_MAINTENANCE_R....docx DOCX document
0904_A_STERN_TUBE_SEAL_INSPECTION_(SW_SYS)_REV_-_(CSI).docx DOCX document
AMENDMENT_BRASHEAR_0003.doc DOC document
0216_A_8_CYLINDER_MAIN_DIESEL_ENGINE_30,000_HOUR_SCHEDULED_MAINTENANCE_R....docx DOCX document
BRASHEAR_AMENDMENT_0001.doc DOC document
BRASHEAR_AMENDMENT_0002.doc DOC document
J-4__BRASHEAR_GFP_Module_AttachmentTemplate_-_Rev_3_5_Mar_(3)_1.xlsx XLSX spreadsheet
J_-_4_CARL_BRASHEAR_MAR_2019_ROH_GFM_REPORT_10-05-18.xlsx XLSX spreadsheet
J_-_6_BRASHEAR.pdf PDF
J_-_7_MSC_Ship_Repair_Facility_Survey.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_12_Past_Performance_Data.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_14_Technical_Non-Disclosure_Agreement.docx DOCX document
J_-_15_Non-Mariner_Maintenance_Contractor_Vetting_Sheet_(Rev_8_(v4)_20_Sep_2017)_(002).xlsx XLSX spreadsheet
N3220519R4260_BRASHEAR.doc DOC document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS CARL BRASHEAR

(T-AKE 7)

ELECTRICALN32205-19-R-4260
27 NOVEMBER 2018
ITEM NO. 307 Category "B"MSCDC/N723/KKC

MOTOR CONTROL CENTER M05 ALTERNATE POWER SOURCE (T-ALT 370)

1.0 ABSTRACT

This item describes the installation of a Manual Transfer Switch (MTS) switch that provides an alternate source of power for motor control center (MCC) M05.

2.0 REFERENCES

2.1 MSC Drawing No. 320-8393000, Lewis & Clark Class Motor Control Center M05 MTS Installation.

3.0 ITEM LOCATION/QUANTITY/DESCRIPTION

3.1 Locations/Quantity

3.1.1 Locations: Sewage Treatment Room (3-75-6) and Engineer Operating Station (3-66-2).

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES:

4.1One (1) Eaton Manual Transfer Switch,
Model No. NTCEC3X30200XRU.

5.0 NOTES

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7 and 23.

5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 This class of ships contains High Voltage (HV) electrical systems (6.6 kV). The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area without proper authorization.

5.4 THE T-AKE 1 CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORK ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK

7.1 Arrangement/Outfitting: None additional.

7.2 Structural: Install MTS, near MCC M05 using manufacturer’s instructions as guidance. Install location shall be approved by Military Sealift Command Representative (MSC REP).

7.3 Mechanical Fluids: None additional.

7.4 Electrical

7.4.1 Removals

Disconnect existing cable SS2-15 from MCC M05 and pull back for re-connection and termination to the MTS, using reference 2.1 as guidance.

7.4.2 Installations

a. Re-connect power cable SS2-15 to normal power terminal of MTS, using Reference 2.1 as guidance.

b. Install EATON MTS (or equal), with the following salient characteristics, using reference 2.1 as guidance.

· 200 ampere rating

· Withstand 30kA spec/10kA any

· 60 Hz, 480 VAC

· 3 Pole

· Instantaneous phase failure operation

· NEMA 3R Enclosure

c. Connect MTS to MCC M05 and circuit SS1-54, using Reference 2.1 as guidance.

d. MSC REP shall approve installation location(s) before work begins.

e. Cable lengths are approximate only, Contractor shall determine actual length(s) at the time of installation.

7.5 Electronics: None additional

7.6 Preparation of Drawings

7.6.1 Any deviations from drawing shall be noted on Reference 2.1.1 via redlines. An electronic .dwg and .pdf version shall be provided to the MSC REP.

7.6.2 Upon completion, installation shall be inspected and tested to the satisfaction of the Chief Engineer, Port Engineer and/or regulatory bodies.

7.7 Testing and Inspecting

a. Designated MSC REP to inspect and approve installation prior to power application.

b. Upon completion, installation shall be inspected and tested to the satisfaction of the MSCREP.

c. End-to-end continuity and electrical insulation resistance test on new, modified, overhauled, or repaired system cables shall be performed. The Military Sealift Command Norfolk Representative (MSCREP) shall be immediately notified if insulation values of equipment or cables are less than 1 Mega Ohm (MΩ). Do not test electronic equipment.

7.8 Painting

7.6.1 Paint all new and disturbed surfaces to match surrounding surfaces.

7.9 Marking

7.7.1 Install name plates, notices and markings for all new and modified systems.

7.10 Manufacturer's Representative: None

8.0 GENERAL REQUIREMENTS: None additional.

307-1