Q A RESPONSES 4

View the file

Other files for this federal contract opportunity

Other files attached to USNS SACAGAWEA: Regular Scheduled Overhaul/Dry-Docking, newest first.
File Type Posted
Redacted_J_ _A.pdf PDF
N3205-16-R-4311_Amendment_0008_13_SEP_2016.pdf PDF
Amendment_0007_Final.pdf PDF
Q_AND_A_Responses_USNS_SACAGAWEA.docx DOCX document
Amendment_0006.doc DOC document
J_-_2_Category_A_Items_14_July_2016.xlsm XLSM spreadsheet
Amendment_0005.pdf PDF
Q_AND_A_Responses_3.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Q_AND_A_Responses_2_Tony.docx DOCX document
Q_AND_A_Responses_1_Tony.docx DOCX document
Amendment_0002.pdf PDF
16-R-4311_AMENDMENT_0001.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__Past_Performance_Questionnaire.docx DOCX document
J_-_4_Government_Furnished_Material_List.xlsx XLSX spreadsheet
J_-_10_Interport_Differential.doc DOC document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_2_Category_A_Items_27_May_2016.xlsm XLSM spreadsheet
J_-_6_WI_015_CDRL.pdf PDF
J_-_3_Category_B_Items_27_May_2016.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
N32205-16-R-4311_SACAGAWEA.doc DOC document
N32205-16-R-4311_Non-Disclosure_Agreement.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-R-4311

QUESTIONS AND ANSWERS #4

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

QUESTION #1:

SPECIFICATION ITEM NO.: Various PARAGRAPH / SECTION NO: Various TITLE: Various

Item 335 Please provide the following references

2.4 MSC Drawing 331-7489146 Rev J, “SRD: Lighting System BWD 03 and 04 Levels”

2.5 MSC Drawing 331-7489147 Rev F, “SRD: Lighting System BWD 05 and 06 Levels”

2.6 MSC Drawing 331-7489150 Rev G, “SRD: Lighting System BWD 07 and 08 Levels”

2.7 TAKE-Notice 12-Rev1-Caution of 120V LC Doane Lights 06Feb14

2.8 SeeSmart G2 HP 2 Foot 8W NWM SEP LED Tube Light Spec Sheet

2.9 SeeSmart G2 HP 4 Foot 15W NWM SEP Rotating LED Tube Light Spec Sheet

2.10 Rotatable Sep Led Tube Lamp Installation Information and Instructions

Item 107 Paragraph 4.1 says the GFM is 30 gallons of paint (per coat) = approximately 4,300 ft2.

Based on CCSI’s calculations each Kingpost is approximately 4,500 ft2 x 7 = 31,500 ft2.

Please confirm the intent of the item. Are the 7 kingposts to be blasted in their entirety? What is the basis for the amount of paint being supplied?

Paragraph 7.4.2i calls for surface prep of front, P&S window openings, ect. There are NO window openings visible on the Kingpost. There are control stations houses at each kingpost that appear to have windows. Is it the intent of the item to blast and coat the control station houses in addition to the kingpost or in lieu of?

Please clarify scope of work required.

Item 118 Paragraph 3.1.2 states that the approximate total area is 4,200 ft2.

Paragraph 7.8 states to mechanically clean 2,500ft2 of area to SP11. These areas then get two (2) spot coats, followed by a full coat to the entire area (4,200 ft2) Based on CCSI’s calculations, using the General arrangement drawings provided, the total area of the 01 & 02 levels, from frame 24 to 58, including the breakwater, is approximately 15,000 ft2.

Is CCSI to base the bid for HPFW wash and painting on the 4,200 ft2 specified, or the 15,000 ft2 that was calculated.

Item 911Paragraph 7.4.5.5 States to assume all four (4) anodes and all four (4) anode shields will have repairs. Should CCSI base the bid on 100% removal/reinstallation of all eight (8) capastic shields?
Item 917Paragraph 7.8 States to prep and paint both sides of ventilation louvers that are welded into the side of the ship. How many louvers are welded in. Is the interior side of the louvers accessible, without any staging or other special requirements? Please clarify.
Item 135This item appears in the J-2 attachment but not in the C – 2 List of Standard Work Items and there is no work item in the specification.
Item 136This work item is in the specification and also in the C – 2 List of Standard Work Items but not in the J-2 attachment.
Item 334This work item is in the specification but does not appear in either the J-2 attachment or the C – 2 List of Standard Work Items.

Item 519 and 520 – Please provide the serial numbers for the Heat Exchangers.

ANSWERS

Item 335 All references are included in List of References dated 8 Jul 2016

Item 107 Yes, all Kingposts are to blasted in their entirety

· All paint will be provided as GFM. Please disregard the amount of paint listed in spec.

· The Kingposts do not have windows. Paragraph 7.2 is a standard (catch-all) blurb.

· Control stations are not a part of this Work Item.

Item 118 Paragraph 3.1.2 is a typo. Approx. area should read 14200 in lieu of 4200 Contractor should bid IAW general arrangement drawings provided.

Item 911 Contractor should base the bid on 100% removal/reinstallation of all eight (8) capastic shields to allow for complete hull blasting.

Item 917 - All louvers are welded in place.

· The interior side of the louvers are accessible without use of staging.

Item 135 Work Item 135 was added to the package in amendment 0004.

Item 136 Work Item 136 was added to the package in amendment 0004.

Item 334 Work Item 334 will be added to both the J-2 attachment and the C-2.

Item 519 The boiler plate data is as follows:

LT Plate Heat Exchanger
GEA Ecoflex GMbH
Type VT 2508 B-6
Max Working Press 101.5 PSI at 149F
MDMT 28.4F at 101.5 PSI
Test Press 9.1 Bar
Year Built 2003

Item 520 The boiler plate data is as follows:

Mueller Accu-Therm Model: AT805 , B-20 Serial: Various P/N: Various Number of plates: 106 Height: 63 inches Width: 36 inches Typical length: 34-5/ Year Built 2003

QUESTION #2:

SPECIFICATION ITEM NO.: Various PARAGRAPH / SECTION NO: Various TITLE: Various

Please provide the following references:

Item 131V22-341-7008.1
V22-341-7023.1
V22-345-4934.01
V22-341-7021.1
V22-346-0062.1
Item 132320-8194701 Rev A
Item 563551-8499077
Item 571256-8390463 Rev D
Item 574551-8194707
531-8194700
Item 920KAMEWA Drawing 129495 Rev H
Technical Manual T9568-AY-MMC-010

ANSWER

Item 131 Please disregard the references above, as they no longer apply to the revised WI-131.

Item 132 Reference documents will be available via ARMDEC.

Item 563 Reference documents will be available via ARMDEC.

Item 571 Reference documents will be available via ARMDEC.

Item 574 Reference documents will be available via ARMDEC.

Item 920 Reference documents will be available via ARMDEC.

QUESTION #3:

SPECIFICATION ITEM NO.: 557

PARAGRAPH / SECTION NO: N/A

TITLE: Cargo Weapons Elevator Grating Repairs

The Answer provided In Questions and Answers #3, Question #19 “Gratings configuration and dimensions and stud sizes to be determined during shipcheck.” Because the ship check is not mandatory, will MSC publish the results of the determination from the shipcheck?

ANSWER

Note: The gratings were field fit into place at time of construction. Grating slats are 1” wide and 0.250 inches thick. Gratings are depicted in amended Work Item No. 557.

QUESTION #4:

SPECIFICATION ITEM NO.: 920

PARAGRAPH / SECTION NO: 2.1.1 & 3.2

TITLE: Bow Thruster Cooling Regulator Installation

Paragraph 2.1.1 provide reference MSC Drawing 532-8389858 Revision A. Paragraph

3.2 provides a list of materials, the Item Number of which is derived from the reference. The work item describes the installation of the materials from the list in 3.2 and references the drawing from 2.1.1. The following issues exist:

Item No. P-5 from the list is for six feet of pipe – the drawing has 105’ of pipe. Which 6’ is allowed for in this work item?

Item No. P-8 from the list is for three each – the drawing has seven each. Which three each are allowed for in this work item?

Item No. P-17 from the list is for one each – the drawing has two each. Which one each are allowed for in this work item?

Item No. P-27 from the list is for one each – the drawing has three each. Which one each are allowed for in this work item?

Item No. P-30 from the list is for one each – the drawing has three each. Which one each are allowed for in this work item?

ANSWER

The numbers and dimensions identified in the reference drawings override the parts list. Contractor should base their bid on the drawings.

QUESTION #5:

SPECIFICATION ITEM NO.: 803

PARAGRAPH / SECTION NO: 1.1 / 3.1.2.1

TITLE: AIR CONDITIONING PLANTS SERVICING AND MAINTENANCE

1.0 Abstract/1.1 States the maintenance and servicing of 5 units

Para. 3.1.2.1 States 3 compressors to be repaired

Item is very contradictory - 5 units to be serviced but states 3 compressors to be repaired. Please verify if we are to service 3 compressor AC plants or all 5.

ANSWER

Paragraph 3.1.2.1 was omitted in previously amended Work Item.

QUESTION #6:

SPECIFICATION ITEM NO.: 107

PARAGRAPH / SECTION NO: 4.1 / 7.4.2i TITLE: RAS/FAS Station King Post & Ram Tensioners

1. All paint will be provided as GFM. Please disregard the amount of paint listed in spec.

1. Yes, all Kingposts are to blasted in their entirety

1. The Kingposts do not have windows. Paragraph 7.2 is a standard (catch-all) blurb.

1. Control stations are not a part of this Work Item.

QUESTION #7

SPECIFICATION ITEM NO.: 117

PARAGRAPH / SECTION NO: 7.3

TITLE: Stbd Side Plenum Louvers and Screens

ANSWER:

Work Item requests Contractor to replace the stbd side carbon steel vent intake screens twenty-two (22) with new stainless steel screens. Coating is not required.

QUESTION #8

SPECIFICATION ITEM NO.: 118

PARAGRAPH / SECTION NO: 3.1.2 / 7.8

TITLE: 01, 02 Level Fwd Deck Houses and Breakwater Preservation and Painting

Paragraph 3.1.2 is a typo. Approx. area should read 14200 in lieu of 4200 Contractor should bid for washing and painting IAW the general arrangement drawings provided.

QUESTION #9

SPECIFICATION ITEM NO.: 911

PARAGRAPH / SECTION NO: 7.4.5.5

TITLE: Inspect and Repair Cathodic Protection

Contractor should base the bid on 100% removal/reinstallation of all eight (8) capastic shields to allow for complete hull blasting.

QUESTION #10

SPECIFICATION ITEM NO.: 917

PARAGRAPH / SECTION NO: 7.8

TITLE: Freeboard Cleaning and Painting – Full Blast

All louvers are welded in place. The interior side of the louvers are accessible without use of staging.

QUESTION #11

SPECIFICATION ITEM NO.: 917

PARAGRAPH / SECTION NO: 7.8

TITLE: Freeboard Cleaning and Painting – Full Blast

All louvers are welded in place. The interior side of the louvers are accessible without use of staging.

QUESTION #12

SPECIFICATION ITEM NO.: 575

PARAGRAPH / SECTION NO:

TITLE: Miscellaneous Valves Repairs

Valve list provided in item list American sizes. Piping information supplied is metric.

Please supply list with the valve number, size, pressure class, type or model number, material, type of actuation on valve.

All valves numbers, sizes, pressure class, types, model numbers, material, etc., can be found in the reference drawings.

1.1NAVSEA Dwg. No. 256-8498829; Central Seawater Cooling System Diagram
1.2MSC Dwg. No. 8386781; Central Seawater Cooling System Diagram
1.3NAVSEA Dwg No. 532-8498855; Low Temperature Freshwater Cooling System Diagram
1.4MSC Dwg. No. 8386783; Diesel Generator High Temperature Freshwater Cooling System Diagram

image1.png image2.png image3.png image4.png image5.png

File details come from the government source that posted it. Updated .