Amendment 0007
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation is amended as follow s:
a. Revise ODCs from $1,500,000 to $1,300,000.
b. Revise Work Items included in Contract Line Item Number (CLIN) 0003.
c. Revise Scope of Work for Work Items 105, 431, 504B, 561, 575, 803, and 917.
d. Revise Work Items 118, 133, 549, 550, 555, 561, 565, 567, 574, and 632 from Schedule "A" to Schedule "B" w hich adds CLINs 0008-0017 in the solicitation and J-3.
e. Delete Work Items 106, 107, 112, 533, 551, 553, 559, 571, 613, and 804 from the Solicitation and J-2.
f. Add CLIN 0018 to separately price Catagory "A" Work Item 132.
g. Add CLIN 0019 Additional Government Requirement (AGR) and ODCs for Work Items 131, 134, and 135.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32205-16-R-4311
X 9B. DATED (SEE ITEM 11)
03-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2016
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET, BLDG SP-64 NAVAL STATION N
NORFOLK VA 23511-2419
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N32205-16-R-4311
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from:
Additional Government Requirements (AGR) (30,000) man-hours @ _______ per man-hour =
OTHER DIRECT COSTS (ODC) BASE $1,500,000.00
PROPOSED G&A RATE __________ SUBTOTAL $__________
PROPOSED PROFIT RATE __________ SUBTOTAL $ __________
To:
Additional Government Requirements (AGR) (30,000) man-hours @ _______ per man-hour =
OTHER DIRECT COSTS (ODC) BASE $1,300,000.00
PROPOSED G&A RATE __________ SUBTOTAL $__________
PROPOSED PROFIT RATE __________ SUBTOTAL $ __________.
CLIN 0003
The CLIN description has changed from Category "A" Work Item to Category "A"
Work Items.
The CLIN extended description has changed from:
Work Items:
WI-131; MV-22 Capability 1 Enhancement (T-A-LT 453) - N42
WI-132; Convert Ballast Tank to Graywater Holding Tank (T-ALT 429) - N42
WI-133; Oily Water Tank Conversion (T-ALT 430) - N42
WI-574; Machinery Oily Water Separator Upgrade (T-ALT 430) - N42
To:
Separately Priced Work Items:
WI-131; Hangar Aft Area Ripout/Installation (T-ALT 429) $__________
WI -134, Hangar Fwd Area Ripout/Installation (T-ALT 453) $__________
WI - 135, SGSI Hangar Ripout and Installation (T-ALT 453) $__________.
CLIN 0004
The CLIN extended description has changed from:
Work Items;
WI-332; Cargo Hold Light Switches (T-ALT 246) – ENCON
WI-335; LED Lighting (T-ALT 353) – ENCON
WI-502; Distiller Flow Meter Replacement (T-ALT 340) – ENCON
WI-831; iHVAC VSD Install (T-ALT 319) – ENCON
WI-832; iHVAC Chiller VSD Install (T-ALT 319) – ENCON
WI-924; Propeller Boss Cap Fins (T-ALT 395) - ENCON
To:
Separately Priced Work Items:
WI-332; Cargo Hold Light Switches (T-ALT 246) $__________
WI-335; LED Lighting (T-ALT 353) $__________
WI-502; Distiller Flow Meter Replacement (T-ALT 340) $__________
WI-831; iHVAC VSD Install (T-ALT 319) $__________
WI-832; iHVAC Chiller VSD Install (T-ALT 319) $__________
WI-924; Propeller Boss Cap Fins (T-ALT 395) $__________.
TOTAL $__________
CLIN 0008 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Category "B" Work Item
FFP
Work Item 118 - 01, 02 Deck Houses and Breakwater Preservation and
Painting.
The Contracting Officer (KO) will notify the contractor in writing when
Category B WIs are required to be accomplished as part of this contract.
Those WIs that are deemed NOT necessary by the Government will not be exercised.
FOB: Destination
NET AMT
CLIN 0009 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Category "B" Work Item
FFP
Work Item 133 - Oily Water Tank Conversion (T-ALT 430)
The Contracting Officer (KO) will notify the contractor in writing when
Category B WIs are required to be accomplished as part of this contract.
Those WIs that are deemed NOT necessary by the Government will not be exercised.
CLIN 0010 is added as follows:
OPTION Category "B" Work Item
Work Item 549 - MMR AFFF Piping Replacement (T-ALT 394)
CLIN 0011 is added as follows:
OPTION Category "B" Work Item
FFP
Work Item 550 - Cargo Pump Room AFFF Piping Requirement (T-ALT
394)
CLIN 0012 is added as follows:
OPTION Category "B" Work Item
FFP
Work Item 555 - Cargo Crane Boom Rest Foundation Reinforcement (T-
ALT 402)
CLIN 0013 is added as follows:
OPTION Category "B" Work Item
FFP
Work Item 561 - Lagging Insulation Preservation and Repairs in Distributed
Passageway
CLIN 0014 is added as follows:
OPTION Category "B" Work Item
FFP
Work Item 565 - 04, 05, and 06 Level Stateroom Shower/Head Decks
Renewal
CLIN 0015 is added as follows:
OPTION Category "B" Work Item
FFP
Work Item 567 - Air Conditioning and Cargo Refrigeration Plant Expansion
Joints Replacement
CLIN 0016 is added as follows:
OPTION Category "B" Work Item
Work Item 574 - Machinery Oily Water Separator Upgrade (T-ALT 430)
CLIN 0017 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION Category "B" Work Item
FFP
Work Item 632 - VCHT Check Valve Installation (T-ALT 362)
The Contracting Officer (KO) will notify the contractor in writing when
Category B WIs are required to be accomplished as part of this contract.
Those WIs that are deemed NOT necessary by the Government will not be exercised.
FOB: Destination
NET AMT
CLIN 0018 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Category "A" Work Item
FFP
Separately Priced Work Item -132; Convert Ballast Tank to Graywater
Holding Tank (T-ALT 429)
CLIN 0019 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
USNS SACAGAWEA (AGR and ODC)
FFP
Additional Government Requirements (AGR) for Work Items 131, 134, and
(4,000) man-hours @ _______ per man-hour = _____________
OTHER DIRECT COSTS (ODC) BASE $132,000.00
PROPOSED G&A RATE __________ SUBTOTAL $__________
PROPOSED PROFIT RATE __________ SUBTOTAL $ _________
FOB: Destination
NET AMT
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
SECTION 000 GENERAL REQUIREMENTS
NOT SEPERATELY PRICED (NSP) REQUIREMENTS
001 Intent, Scope, General Conditions and Definitions
002 Technical and Manufacturer’s Representatives
003 Approach, Berth, and Mooring Requirements
004 Testing and Quality Assurance
005 Electrical Safety Procedure Requirements
006 Heavy Weather Plan
007 Cold Weather Plan
024 Physical Security at Private Contractor’s Facility
CATEGORY “A” WORK ITEMS
010 Furnish Office for Overhaul Management Team
011 Furnish General Services
012 Telephone Services
013 Project Planning Production Status Monitoring Reports
014 Preparation of Weight and Moment Report
015 Integrated Logistics and GFM Support Requirements
016 Fire Protection and Ship’s Safety Program
017 Handling of Ship’s Stores
018 Delivery and Re-Delivery of the Vessel
019 Shipboard Access and Security
020 Gas Free Certificates
021 Clean and Gas Free Tanks, Voids, Cofferdams and Spaces
022 Dock Trials and Sea Trial
023 Hazardous Waste Disposal
CATEGORY “B” WORK ITEMS
025 Physical Security at Private Contractor’s Facility in Force Protection Conditions Bravo – Delta
030 Continuation of Services
SECTION 100 HULL STRUCTURE
CATEGORY “A” WORK ITEMS
101 Ballast Tank Zinc Inspection
102 Tank Vents Inspection and Renewal
104 Helo Deck and Helo Hanger Deck Non-Skid Renewal
105 Deck house Preservation – Fill Blast
108 Tank Boundary Testing and Structural Survey
109 Hull Gauging Suspect Areas
111 Bow Fairlead Roller Repair
113 Port Bulwark Closed Chock Replacement
114 Bollards, Bitts, Fairleads, Stand Rollers and Chocks SWL Marking
117 Starboard Side Plennum Louver and Screens Repairs
131 Hangar Aft Area Ripout/Installation (T-ALT 453)
132 Convert Ballast Tank to Greywater Holding Tank (T-ALT 429)
134 Hangar Fwd Area Ripout/Installation (T-ALT 453)
135 SGSI Hanger Ripout and Installation (T-ALT 453)
136 Peck and Hale Tie Down Points Installation at Unrep Station
CATEGORY “B” WORK ITEMS
118 01, 02 Deck Houses and Breakwater Preservation and Painting
133 Oily Water Tank Conversion (T-ALT 430)
SECTION 200 MACHINERY, PROPULSION
CATEGORY “A” WORK ITEMS
201 Propulsion Motor and Coolers Cleaning, Inspection and Maintenance
203B MDGs Fluid Flexible Connectors Replacement
204 MDEs Automation Annual Testing
205 MDGs Annual Automation and Propulsion Control Inspection and Testing
206 MDGs and EDG Flexible Coupling (Vulkan) Inspection and EDG Coupling Replacement
207 Propulsion Motor Pedestal Bearing Inspections
208 MDG No 4 and Turbocharger 6000 Hour Overhaul
216 MDGs Inspection, Maintenance and Cleaning
219 MDGs Pedestal Bearing Inspections (RENK)
231 MDGs Splash Oil and Test Circuit Modifications (T-ALT 381)
232 MDG SACOS UPS Upgrade (T-ALT 352)
SECTION 300 ELECTRICAL
CATEGORY “A” WORK ITEMS
302 HV, SS, Emergency and Bow Thruster Switchboards, Load Centers Control Centers and Transformers
Cleaning and Maintenance
304 UPS, PLC and Thermography Survey Inspections
309 Viking Shore Power Cable Adapters Modifications
332 Cargo Holds 1-6 Lighting Switch Installation (T-ALT 246)
335 M-711 Light Fixture Conversion to LED (T-ALT 353)
SECTION 400 COMMUNICATION AND NAVIGATION AIDS
CATEGORY “A” WORK ITEMS
401 ADNS-SFF System Support
402 Comms System Maintenance and Antennas System Preventive Maintenance
404 Bridge Equipment Survey and ECHO Depth Sounder Preventive Maintenance
405 OE-570/WSC Antenna System Maintenance
406 Doppler Speed Log Replacement (T-ALT 431)
431 Gyrocompass MK27F Upgrade (T-ALT 348)
433 ECDIS Vision Master VMFT Installation and VDR Upgrade (T-ALT 224, 347, 413)
434 Satamatics 101 D+ Ship’s Security Alert System (SASS) Replacement (T-ALT 438)
SECTION 500 MACHINERY, AUXILIARY SYSTEMS
CATEGORY “A” WORK ITEMS
501B Firefighting 5-Year Testing and Inspection
502 Distiller Flow Meter Replacement (T-ALT 340)
503 Self Contained Breathing Apparatus (SCBA) Annual Inspection, Testing and Recertification
504B Cargo Cranes 5-Year Retesting Surveys, Hydraulic Hoses and Wire Rope Replacement
507 EDG Flexible Hoses 5-Year Replacement
509B Distilling Plant No. 1 & 2 Cleaning, Inspection and Maintenance
511 Anchor and Mooring Winches Testing and Inspection
514 Relief Valves Testing
515 Air Receivers and HP Air Flasks Open and Inspection and HP Air Flasks NDT
519 LTFW Coolers Cleaning and Gasket Material Changeout (T-ALT 426)
520 HTFW Coolers Cleaning and Gasket Material Changeout (T-ALT 426)
528 Cargo Hold Magazine Sprinkler CLA Valves Overhaul
532 Fireman Casacade Orificial Restrictive Devise (CORD) Repairs
544 EDG Alignment, Inspection, Testing and Recertification
545 VAF Oilcon MK-6 Oil Discharge Monitoring Equipment (ODME) Calibration
546 Personnel Elevator 10-Year Maintenance and Overhaul
552 Genie Manlift 5-Year Maintenance and Recertification
554 Shipboard Gage and Meter Calibrations
557 Cargo Weapons Elevator Gratings Repairs
558 Cargo Weapons Elevators Recertification Support Item
560 Marpol Annex VI Fuel Sampling Requirements-Flange Installation (T-ALT 377)
563 High Pressure Air Unions Replacement
568 Sludge Incinerator Inspection, Maintenance and Sludge Tank Heater Installation (T-ALT 218)
569 Machinery and Cargo OWS Inspection, Cleaning and Recertification
572 CMWD Carbon Steel Piping and Check Valve Assy Replacement
573 Rudder Stock Gland Seal Inspection
575 Miscellaneous Valves Repairs
CATEGORY “B” WORK ITEMS
549 MMR AFFF Piping Replacement (T-ALT 394)
550 Cargo Pump Room AFFF Piping Replacement (T-ALT 394)
555 Cargo Crane Boom Rest Foundation Reinforcement (T-ALT 402)
561 Lagging Insulation Preservation and Repairs in Distributed Passageway
565 04, 05 and 06 Level Stateroom Shower/Head Decks Renewal
567 Air Conditioning and Cargo Refrigeration Plant Expansion Joints Replacement
574 Machinery Oily Water Separator Upgrade (T-ALT 430)
SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY
CATEGORY “A” WORK ITEMS
602 Accommodation Ladders 5-Year Inspection and Load Testing
603 Lifeboats Certification 5-Year Maintenance and Falls Renewal
604 Rescue Boats 5-Year Recertification, Maintenance and Falls Renewal
605 Liferafts Testing and Recertification
609 Immersion Suit Testing and Inspection
631 Lifeboats & Rescue Boats Release Hooks Upgrade (T-ALT 376)
CATEGORY “B” WORK ITEMS
632 VCHT Check Valve Installation (T-ALT 362)
SECTION 800 HEATING, VENTILATION AND AIR CONDITIONING
801 Galley Exhaust Duct Cleaning
802 Laundry Exhaust Duct Cleaning
803 Air Conditioning Plants Servicing and Maintenance
831 Shipyard Support for HVAC Variable Speed Drive Installation (iHVAC) (T-ALT 319)
832 Shipyard Support for Chiller Variable Speed Drive Installation (iHVAC) (T-ALT 319)
833 Galley HVAC Modifications (T-ALT 330)
SECTION 900 DRYDOCKING AND UNDOCKING
901 Dry-Docking and Undocking
903 Propeller Shaft and Stern Tube Inspection (Includes reference Cells Removal and Tube Recoating)
904 Stern Tube Seal Inspection
906 Bow Thruster 5-Year Maintenance
907 Bow Thruster Propeller Polish
908 Zinc Anode Renewals in Seachests, Rope Guard and Bow Thruster
909 Range and Paint Ground Tackle
910 Sea Valves Overhaul and Testing
911 Inspect and Repair Cathodic Protection
912 Shaft Grounding Preventive Maintenance
913 Waster Sleeves Renewal
914 Bilge Keel Stabilizers Inspection and Float Coat
915 Underwater Hull Cleaning and Painting – Full blast
917 Freeboard Cleaning and Painting – Full Blast
920 Bow Thruster Cooling Regulator Installation (T-ALT 227)
924 Propeller Boss Cap Replacement (T-ALT 325)
925 Bow Thruster Tunnel Grating Repairs
CATEGORY “B” WORK ITEMS
902 Dry-Docking and Undocking
SECTION 1000 UNREP GEAR
1001 Hello Deck Safety Nets Refurbishment, Rewiring and Load Testing
1002 RAS Station Sliding Block Drive Chain Replacement and Guide Rail Refurbishment
(End of Summary of Changes)