J_-_2_Category_A_Items_14_July_2016.xlsm

XLSM spreadsheet 40 KB Posted

Attached to
USNS SACAGAWEA: Regular Scheduled Overhaul/Dry-Docking Federal contract opportunity
Solicitation number
N32205-16-R-4311
Issued by
Department of the Navy Military Sealift Command

About this file

ATTACHMENT J-2

View the file

Other files for this federal contract opportunity

Other files attached to USNS SACAGAWEA: Regular Scheduled Overhaul/Dry-Docking, newest first.
File Type Posted
Redacted_J_ _A.pdf PDF
N3205-16-R-4311_Amendment_0008_13_SEP_2016.pdf PDF
Amendment_0007_Final.pdf PDF
Q_AND_A_Responses_USNS_SACAGAWEA.docx DOCX document
Amendment_0006.doc DOC document
Q_AND_A_Responses_4.docx DOCX document
Amendment_0005.pdf PDF
Q_AND_A_Responses_3.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Q_AND_A_Responses_2_Tony.docx DOCX document
Q_AND_A_Responses_1_Tony.docx DOCX document
Amendment_0002.pdf PDF
16-R-4311_AMENDMENT_0001.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__Past_Performance_Questionnaire.docx DOCX document
J_-_4_Government_Furnished_Material_List.xlsx XLSX spreadsheet
J_-_10_Interport_Differential.doc DOC document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_2_Category_A_Items_27_May_2016.xlsm XLSM spreadsheet
J_-_6_WI_015_CDRL.pdf PDF
J_-_3_Category_B_Items_27_May_2016.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
N32205-16-R-4311_SACAGAWEA.doc DOC document
J_-_8_Request_for_Spec_Clarification.doc DOC document
N32205-16-R-4311_Non-Disclosure_Agreement.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001Intent, Scope, General Requirements and DefinitionsNSPNSPNSP$0
002Technical and Manufacturer’s RepresentativesNSPNSPNSP$0
003Approach, Berth, and Mooring RequirementsNSPNSPNSP$0
004Testing and Quality AssuranceNSPNSPNSP$0
005Electrical Safety Procedure RequirementsNSPNSPNSP$0
006Heavy Weather PlanNSPNSPNSP$0
007Cold Weather PlanNSPNSPNSP
010Furnish Office for Overhaul Management Team (OMT)- 0$ - 0$0
011Furnish General Services- 0$ - 0$0
012Telephone Services- 0$ - 0$0
013Project Planning and Production Status Monitoring Reports- 0$ - 0$0
014Preparation of Weight and Moment Report- 0$ - 0$0
015Integrated Logistics and GFM Support Requirements- 0$ - 0$0
016Fire Protection and Ship’s Safety Program- 0$ - 0$0
017Handling Ship’s Stores- 0$ - 0$0
018Delivery and Redelivery of the Vessel- 0$ - 0$0
019Shipboard Access and Security- 0$ - 0$0
020Gas Free Certificates- 0$ - 0$0
021Clean and Gas Free Tanks, Voids, Cofferdams and Spaces- 0$ - 0$0
022Dock Trials and Sea Trial- 0$ - 0$0
023Hazardous Waste Disposal- 0$ - 0$0
024Physical Security at Private Contractor's FacilityNSPNSPNSP$0
100HULL STRUCTURE
101Ballast Tank Zink Inspection- 0$ - 0$0
102Tank Vents Inspection and Renewal- 0$ - 0$0
104Helo Deck and Helo Hangar Deck Non-Skid Renewal- 0$ - 0$0
105Deck House Preservation - Full Blast- 0$ - 0$0
106UNREP Stations Deck Non-Skid Renewal
107RAS/FAS Station Kingposts and Ram Tensioners Preservation- 0$ - 0$0
108Tank Boundary Testing and Structural Survey- 0$ - 0$0
109Hull Gauging Suspect Areas- 0$ - 0$0
111Bow Fairlead Roller Repair- 0$ - 0$0
112Saltwater Ballast Tanks Preservation and Spot Repairs- 0$ - 0$0
113Port Bulwark Closed Chock Replacement- 0$ - 0$0
114Bollards, Bitts, Fairleads, Stand Rollers and Chocks SWL Marking- 0$ - 0$0
117Starboard Side Plennum Louver and Screens Repairs- 0$ - 0$0
11801, 02 Deck Houses and Breakwater Preservation and Painting- 0$ - 0$0
131Forward Hangar Ripout and Installation (T-ALT 453)- 0$ - 0$0
132Convert Ballast Tank to Greywater Holding Tank (T-ALT 429)- 0$ - 0$0
133Oily Water Tank Conversion (T-ALT 430)- 0$ - 0$0
134Aft Hangar Ripout and Installation (T-ALT 453)
135SGSI Hangar Ripout and Installation (T-ALT 453)- 0$ - 0$0
136Peck and Hale Tie-Down Points Installation at UNREP Station- 0$ - 0$0
200MACHINERY, PROPULSION
201Propulsion Motor and Coolers Cleaning, Inspection and Maintenance- 0$ - 0$0
203BMDGs Fluid Flexible Connectors Replacement- 0$ - 0$0
204MDEs Automation Annual Testing- 0$ - 0$0
205MDG Annual Automation and Propulsion Control Inspection and Testing- 0$ - 0$0
206MDGs and EDG Flexible Coupling (Vulkan) Inspection and EDG Coupling Replacement- 0$ - 0$0
207Propulsion Motor Pedestal Bearing Inspections- 0$ - 0$0
208MDG No. 4 and Turbocharger 6000 Hr. Overhaul- 0$ - 0$0
216MDGs Inspection, Maintenance and Cleaning- 0$ - 0$0
219MDGs Pedestal Bearing Inspections (RENK)- 0$ - 0$0
231MDGs Splash Oil and Test Circuit Modification (T-ALT 381)- 0$ - 0$0
232MDG SACOS UPS Upgrade (T-ALT 352)- 0$ - 0$0
300ELECTRICAL
302HV, SS, Emergency and Bow Thruster Switchboards, Load Centers, Control Centers and Transformers Cleaning and Maintenance- 0$ - 0$0
304UPS, PLC and Thermography Survey and Inspections- 0$ - 0$0
309Viking Shore Power Cable Adapters Modifications- 0$ - 0$0
332Cargo Holds 1-6 Lighting Switch Installation (T-ALT 246)- 0$ - 0$0
335M-711 Light Fixture Conversion to LED (T-ALT 246)- 0$ - 0$0
400COMMUNICATION AND NAVIGATIONAL AIDS
401ADNS-SFF System Support- 0$ - 0$0
402Comms System Maintenance and Antennas System Preventive Maintenance- 0$ - 0$0
404Bridge Equipment Survey and ECHO Depth Sounder Preventive Maintenance- 0$ - 0$0
405OE-570/WSC Antenna System Maintenance- 0$ - 0$0
406Doppler Speed Log Replacement (T-ALT 431)- 0$ - 0$0
431Gyrocompass MK27F Upgrade (T-ALT 348)- 0$ - 0$0
433ECDIS VisionMaster VMFT Installation and VDR Upgrade (T-ALT 224, 347, 413)- 0$ - 0$0
434Satamatics 101 D+ Ship's Security Alert System (SASS) Replacement (T-ALT 438)- 0$ - 0$0
500MACHINERY, AUXILIARY SYSTEMS
501BFirefighting 5-Year Testing and Inspection- 0$ - 0$0
502Distiller Flow Meter Replacement (T-ALT 340)
503Self Contained Breathing Apparatus (SCBA) Annual Inspection, Testing and Recertification- 0$ - 0$0
504BCargo Cranes 5-Year Retesting Surveys, Hydraulic Hoses and Wire Rope Replacement- 0$ - 0$0
507EDG Flexible Hoses 5-Year Replacement- 0$ - 0$0
509BDistilling Plants No. 1 & 2 Cleaning, Inspection and Maintenance- 0$ - 0$0
511Anchor and Mooring Winches Testing and Inspection- 0$ - 0$0
514Relief Valves Testing- 0$ - 0$0
515Air Receivers and HP Air Flasks Open and Inspection and HP Air Flasks NDT- 0$ - 0$0
519LTFW Coolers Cleaning and Gasket Material Changeout (T-ALT 426)- 0$ - 0$0
520HTFW Coolers Cleaning and Gasket Material Changeout (T-ALT 426)- 0$ - 0$0
528Cargo Hold Magazine Sprinkler CLA Valves Overhaul- 0$ - 0$0
532Firemain Casacade Orificial Restrictive Device (CORD) Repairs- 0$ - 0$0
533MDG and EDG Start Air Compressors Overhaul- 0$ - 0$0
544EDG Alignment, Inspection,Testing and Recertification- 0$ - 0$0
545VAF Oilcon MK-6 Oil Discharge Monitoring Equipment (ODME) Calibration- 0$ - 0$0
546Personnel Elevator 10-Year Maintenance and Overhaul- 0$ - 0$0
549MMR AFFF Piping Replacement (T-ALT 394)- 0$ - 0$0
550Cargo Pump Room AFFF Piping Replacement (T-ALT 394)- 0$ - 0$0
551Potable Water Heaters Open and Inspection- 0$ - 0$0
552Genie Manlift 5-Year Maintenance and Recertification- 0$ - 0$0
553Cargo Brine System Isolation Valves Replacement, Pump Replacement and Piping Modifications (T-ALT 349)- 0$ - 0$0
554Shipboard Gage and Meter Calibrations- 0$ - 0$0
555Cargo Crane Boom Rest Foundation Reinforcement (T-ALT 402)- 0$ - 0$0
557Cargo Weapons Elevator Gratings Repairs- 0$ - 0$0
558Cargo Weapons Elevators Recertification Support Item- 0$ - 0$0
559Reverse Osmosis Sea Suction Relocation (T-ALT 351)- 0$ - 0$0
560Marpol Annex VI Fuel Sampling Requirements-Flange Installations (T-ALT 377)- 0$ - 0$0
561Lagging Insulation Preservation and Repairs- 0$ - 0$0
563High Pressure Air Unions Replacement- 0$ - 0$0
56504, 05 and 06 Level Stateroom Shower/Head Decks Renewal- 0$ - 0$0
567Air Conditioning and Cargo Refrigeration Plant Expansion Joints Replacement- 0$ - 0$0
568Sludge Incinerator Inspection, Maintenance and Sludge Tank Heater Installation (T-ALT 218)- 0$ - 0$0
569Machinery and Cargo OWS Inspection, Cleaning and Recertification- 0$ - 0$0
571Central Seawater Spool Piece Repairs, Modifications (T-ALT 238)- 0$ - 0$0
572CMWD Carbon Steel Piping and Check Valve Assy Replacement- 0$ - 0$0
573Rudder Stock Gland Seal Inspection- 0$ - 0$0
574Machinery Oily Water Separator Upgrade (T-ALT 430)- 0$ - 0$0
575Miscellaneous Valves Repairs- 0$ - 0$0
600OUTFIT, FURNISHINGS AND HABITABILITY
602Accommodation Ladders 5-Year Inspection and Load Testing- 0$ - 0$0
603Lifeboats Certification 5-Year Maintenance and Falls Renewal- 0$ - 0$0
604Rescue Boats 5-Year Recertification, Maintenance and Falls Renewal- 0$ - 0$0
605Liferafts Testing and Recertification- 0$ - 0$0
609Immersion Suit Testing and Inspection- 0$ - 0$0
613VCHT Sewage System Piping Cleaning/Flush- 0$ - 0$0
631Lifeboats & Rescue Boats Release Hooks Upgrade (T-ALT 376)- 0$ - 0$0
632VCHT Check Valve Installation (T-ALT 362)- 0$ - 0$0
800HEATING, VENTILATION, AND AIR CONDITIONING
801Galley Exhaust Duct Cleaning- 0$ - 0$0
802Laundry Exhaust Duct Cleaning- 0$ - 0$0
803Air Conditioning Plants Servicing and Maintenance- 0$ - 0$0
804Cargo Refrigeration Plant Compressors Overhaul- 0$ - 0$0
831Shipyard Support for HVAC Variable Speed Drive Installation (iHVAC) (T-ALT 319)- 0$ - 0$0
832Shipyard Support for Chiller Variable Speed Drive Installation (iHVAC) (T-ALT 319)- 0$ - 0$0
833Galley HVAC Modifications (T-ALT 330)- 0$ - 0$0
900DRY-DOCKING
901Dry-Docking and Undocking- 0$ - 0$0
903Propeller Shaft and Stern Tube Inspection (Includes Reference Cells Removal and Tube Recoating)- 0$ - 0$0
904Stern Tube Seal Inspection- 0$ - 0$0
906Bow Thruster 5-Year Maintenance- 0$ - 0$0
907Bow Thruster Propeller Polish- 0$ - 0$0
908Zinc Anode Renewals in Seachests, Rope Guard and Bow Thruster- 0$ - 0$0
909Range and Paint Ground Tackle- 0$ - 0$0
910Sea Valves Overhaul and Testing- 0$ - 0$0
911Inspect and Repair Cathodic Protection- 0$ - 0$0
912Shaft Grounding Preventive Maintenance
913Waster Sleeves Renewal- 0$ - 0$0
914Bilge Keel Stabilizers Inspection and Float Coat- 0$ - 0$0
915Underwater Hull Cleaning and Painting - Full blast- 0$ - 0$0
917Freeboard Cleaning and Painting - Full Blast- 0$ - 0$0
920Bow Thruster Cooling Regulator Installation (T-ALT 227)- 0$ - 0$0
924Propeller Boss Cap Replacement (T-ALT 325)- 0$ - 0$0
925Bow Thruster Tunnel Grating Repairs- 0$ - 0$0
1000UNREP GEAR
1001Helo Deck Safety Nets Refurbishment, Rewiring and Load Testing$ - 0$0
1002RAS Station Sliding Block Drive Chain Replacement and Guide Rail Refurbishment- 0$ - 0$0
TOTAL CAT "A"$0.00

Attachment J-2

USNS SACAGAWEA (T-AKE 2)CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMSN32205-16-R-4311

File details come from the government source that posted it. Updated .