N32205-16-R-4311_SACAGAWEA.doc

DOC document 461 KB Posted

Attached to
USNS SACAGAWEA: Regular Scheduled Overhaul/Dry-Docking Federal contract opportunity
Solicitation number
N32205-16-R-4311
Issued by
Department of the Navy Military Sealift Command

About this file

SOLICITATION FOR USNS SACAGAWEA ROH/DD

View the file

Other files for this federal contract opportunity

Other files attached to USNS SACAGAWEA: Regular Scheduled Overhaul/Dry-Docking, newest first.
File Type Posted
Redacted_J_ _A.pdf PDF
N3205-16-R-4311_Amendment_0008_13_SEP_2016.pdf PDF
Amendment_0007_Final.pdf PDF
Q_AND_A_Responses_USNS_SACAGAWEA.docx DOCX document
Amendment_0006.doc DOC document
J_-_2_Category_A_Items_14_July_2016.xlsm XLSM spreadsheet
Q_AND_A_Responses_4.docx DOCX document
Amendment_0005.pdf PDF
Q_AND_A_Responses_3.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Q_AND_A_Responses_2_Tony.docx DOCX document
Q_AND_A_Responses_1_Tony.docx DOCX document
Amendment_0002.pdf PDF
16-R-4311_AMENDMENT_0001.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__Past_Performance_Questionnaire.docx DOCX document
J_-_4_Government_Furnished_Material_List.xlsx XLSX spreadsheet
J_-_10_Interport_Differential.doc DOC document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_2_Category_A_Items_27_May_2016.xlsm XLSM spreadsheet
J_-_6_WI_015_CDRL.pdf PDF
J_-_3_Category_B_Items_27_May_2016.xls XLS spreadsheet
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
N32205-16-R-4311_Non-Disclosure_Agreement.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

USNS SACAGAWEA CAT "A"

FFP

Category "A" Work Items (WIs)

FFP

Prepare for and accomplish the Regular Overhaul/Dry-docking (ROH & DD) of the United States Navy Ship (USNS) SACAGAWEA (T-AKE 2)

Total Category "A" WIs

Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4

Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2

Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2

Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.20.3

Proposed unit price per crane usage $______ IAW WI 11, 7.9.1

Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.1 ______%

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

USNS SACAGAWEA (AGR and ODC)

Additional Government Requirements (AGR)

(30,000) man-hours @ _______ per man-hour = _____________

OTHER DIRECT COSTS (ODC) BASE $1,500,000.00 PROPOSED G&A RATE __________ SUBTOTAL $__________ PROPOSED PROFIT RATE __________ SUBTOTAL $ __________

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "A" Work Item

Work Items:

WI-131; MV-22 Capability 1 Enhancement (T-A-LT 453) $____________

WI-132; Convert Ballast Tank to Graywater Holding Tank (T-ALT 429) $____________

WI-133; Oily Water Tank Conversion (T-ALT 430) $____________ WI-574; Machinery Oily Water Separator Upgrade (T-ALT 430) $____________

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "A" Work Item

Work Items:

WI-332; Cargo Hold Light Switches (T-ALT 246) $____________ WI-335; LED Lighting (T-ALT 353) $____________ WI-502; Distiller Flow Meter Replacement (T-ALT 340) $____________ WI-831; iHVAC VSD Install (T-ALT 319) $____________ WI-832; iHVAC Chiller VSD Install (T-ALT 319) $____________ WI-924; Propeller Boss Cap Fins (T-ALT 395) - ENCON

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" Work Item

FFP

Work Item 030 - Continuation of Services

The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" Work Item

FFP

Work Item 025 - Physical Security at Private Contractor’s Facility in Force Protection Conditions

The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Category "B" Work Item

FFP

Work Item 902 - Dry Docking and Undocking Vessel

The Contracting Officer (KO) will notify the contractor in writing when Category B WIs are required to be accomplished as part of this contract. Those WIs that are deemed NOT necessary by the Government will not be exercised.

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

Section B - Supplies or Services and Prices

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0007 $______________

The contractor shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.

CLAUSES INCORPORATED BY FULL TEXT

Section B - Supplies or Services and Prices

PART I - THE SCHEDULE

The contractor shall follow the instructions stated below when completing Section B:

CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” Wis.

CLIN 0002: Indicate the Fully-Burdended Labor Rate (FBLR) (e.g., General and Administrative (G&A), Profit, Supervision, and/or support functions) and the ODC Profit and G&A rate. These rates will be used in evaluating the contractor’s proposal and shall be the rate for pricing changes negotiated under the H-3 Clause – AGR and H-4 Clause ODC, up to the maximum number of man-hours and ODC base specified herein. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blasting Tank cleaning

Welding Machinists (inside and outside)

Burning Brazing

Carpentry Electrical Work

Electronic Work Shipfitting

Lagging Painting

Boilermaking Pipefitting

Sheetmetal Work Engineering

Rigging Staging/scaffolding

General Labor Fire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FLBR for direct production man-hours. Examples of support functions include:

Testing Quality Assurance

Planning Cleaning (except tank cleaning)

Material handling & Warehousing Security

Surveying Administration

Transportation Purchasing staff

Lofting Other indirect support

Supervision

The rates proposed for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request For Proposal (RFP)s issued under this contract. The KO will apply these rates to the ODCs for each RFP when it is negotiated and settled.

The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.

NOTE: This does not include any material cost for Category “A” Work Items. The material cost for Category “A” Work Items should be included under CLIN 0001).

CLINs 0003 and 0004 separately funded Category “A” Work Items.

CLINs 0005 - 0007 – The offeror shall complete CLIN 0005 through 0007 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” Work Items.

Section C - Descriptions and Specifications

CLAUSES INCORPORATED BY FULL TEXT

C-1

GENERAL

1.

The Contractor shall prepare for and accomplish the voyage repairs, overhaul, or alterations of the USNS SACAGAWEA (T-AKE 2) as specified herein and IAW the Work Item (WI) package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2.

In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

(b) Ensuring the timely procurement of Contractor-Furnished Material/Contractor-Furnished Property (CFM/CFP) and the timely reporting, receipt, storage, installation, and accountability of Government-Furnished Material/Government-Furnished Property (GFM/GFP) (IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004).

(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the Contract Data Requirements List (CDRL) and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variance based on the Time Phased Sequencing Network (TPSN) submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.

(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and Long Lead Time Material (LLTM) for use in the availabilities from the date of award.

(j) Managing all subcontractors performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3.

Contract work shall be performed by an eligible contractor as defined below.

(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR), or International Organization for Standardization (ISO) Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.

This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.

The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:

a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.

b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package

e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards

h. Safety/security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.

j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place in which the CLASS size ship can access and be berthed at

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

(c) The government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.

This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your final proposal revision submitted on 07/06/2016 inclusive of all discussion and clarifications responses and (b) this award/contract.

C – 2 List of Standard Work Items included for this solicitation:

SECTION 000

GENERAL REQUIREMENTS

NOT SEPERATELY PRICED (NSP) REQUIREMENTS

Intent, Scope, General Conditions and Definitions

Technical and Manufacturer’s Representatives

Approach, Berth, and Mooring Requirements

Testing and Quality Assurance Electrical Safety Procedure Requirements

Heavy Weather Plan

Cold Weather Plan

Physical Security at Private Contractor’s Facility

CATEGORY “A” WORK ITEMS

Furnish Office for Overhaul Management Team

Furnish General Services

Telephone Services

Project Planning Production Status Monitoring Reports

Preparation of Weight and Moment Report

Integrated Logistics and GFM Support Requirements

Fire Protection and Ship’s Safety Program

Handling of Ship’s Stores Delivery and Re-Delivery of the Vessel Shipboard Access and Security

Gas Free Certificates

Clean and Gas Free Tanks, Voids, Cofferdams and Spaces

Dock Trials and Sea Trial

Hazardous Waste Disposal

CATEGORY “B” WORK ITEMS

Physical Security at Private Contractor’s Facility in Force Protection Conditions Bravo – Delta

Continuation of Services SECTION 100 Hull Structure

CATEGORY “A” WORK ITEMS

Ballast Tank Zinc Inspection

Tank Vents Inspection and Renewal

Helo Deck and Helo Hanger Deck Non-Skid Renewal

Deck house Preservation – Fill Blast

UNREP Stations Deck N0n-Skid Renewal

RAS/FAS Station Kingposts and Ram Tensioners Preservation

Tank Boundary Testing and Structural Survey

Hull Gauging Suspect Areas

Bow Fairlead Roller Repair

Saltwater Ballast Tanks Preservation and Spot Repairs

Port Bulwark Closed Chock Replacement

Bollards, Bitts, Fairleads, Stand Rollers and Chocks SWL Marking

Starboard Side Plennum Louver and Screens Repairs

01, 02 Deck Houses and Breakwater Preservation and Painting

MV-22 Capability 1 Enhancement (T-ALT 453)

Convert Ballast Tank to Greywater Holding Tank (T-ALT 429)

Oily Water Tank Conversion (T-ALT 430)

Peck and Hale Tie Down Points Installation at Unrep Station

SECTION 200 MACHINERY, PROPULSION

CATEGORY “A” WORK ITEMS

Propulsion Motor and Coolers Cleaning, Inspection and Maintenance

203B MDGs Fluid Flexible Connectors Replacement

MDEs Automation Annual Testing

MDGs Annual Automation and Propulsion Control Inspection and Testing

MDGs and EDG Flexible Coupling (Vulkan) Inspection and EDG Coupling Replacement

Propulsion Motor Pedestal Bearing Inspections

MDG No 4 and Turbocharger 6000 Hour Overhaul

MDGs Inspection, Maintenance and Cleaning

MDGs Pedestal Bearing Inspections (RENK)

MDGs Splash Oil and Test Circuit Modifications (T-ALT 381)

MDG SACOS UPS Upgrade (T-ALT 352)

SECTION 300 Electrical

CATEGORY “A” WORK ITEMS

HV, SS, Emergency and Bow Thruster Switchboards, Load Centers Control Centers and Transformers Cleaning and Maintenance

UPS, PLC and Thermography Survey Inspections

Viking Shore Power Cable Adapters Modifications

Bilge Alarms Installation

OP-4 Storerooms Lighting Upgrade

Cargo Holds 1-6 Lighting Switch Installation (T-ALT 246)

M-711 Light Fixture Conversion to LED (T-ALT 353)

SECTION 400 Communication and Navigation AIDS

CATEGORY “A” WORK ITEMS

ADNS-SFF System Support

Comms System Maintenance and Antennas System Preventive Maintenance

Bridge Equipment Survey and ECHO Depth Sounder Preventive Maintenance

OE-570/WSC Antenna System Maintenance

Doppler Speed Log Replacement (T-ALT 431)

Gyrocompass MK27F Upgrade (T-ALT 348)

ECDIS Vision Master VMFT Installation and VDR Upgrade (T-ALT 224, 347, 413)

Satamatics 101 D+ Ship’s Security Alert System (SASS) Replacement (T-ALT 438)

SECTION 500 MACHINERY, AUXILIARY SYSTEMS

CATEGORY “A” WORK ITEMS

501B Firefighting 5-Year Testing and Inspection

Distiller Flow Meter Replacement (T-ALT 340)

Self Contained Breathing Apparatus (SCBA) Annual Inspection, Testing and Recertification

504B Cargo Cranes 5-Year Retesting Surveys, Hydraulic Hoses and Wire Rope Replacement

EDG Flexible Hoses 5-Year Replacement

509B Distilling Plant No. 1 & 2 Cleaning, Inspection and Maintenance

Anchor and Mooring Winches Testing and Inspection

Relief Valves Testing

Air Receivers and HP Air Flasks Open and Inspection and HP Air Flasks NDT

LTFW Coolers Cleaning and Gasket Material Changeout (T-ALT 426)

HTFW Coolers Cleaning and Gasket Material Changeout (T-ALT 426)

Cargo Hold Magazine Sprinkler CLA Valves Overhaul

Fireman Casacade Orificial Restrictive Devise (CORD) Repairs

MDG and EDG Start Air Compressors Overhaul

EDG Alignment, Inspection, Testing and Recertification

VAF Oilcon MK-6 Oil Discharge Monitoring Equipment (ODME) Calibration

Personnel Elevator 10-Year Maintenance and Overhaul

Miscellaneous Piping Repairs

MWR AFFF Piping Replacement (T-ALT 394)

Cargo Pump Room AFFF Piping Replacement (T-ALT 394)

Potable Water Heaters Open and Inspection

Genie Manlift 5-Year Maintenance and Recertification

Cargo Brine System Isolation Valves Replacement, Pump Replacement and Piping Modifications (T-ALT 349)

Shipboard Gage and Meter Calibrations

Cargo Crane Boom Rest Foundation Reinforcement (T-ALT 402)

Cargo Weapons Elevator Gratings Repairs

Cargo Weapons Elevators Recertification Support Item

Reverse Osmosis Sea Suction Reloaction

Marpol Annex VI Fuel Sampling Requirements-Flange Installation (T-ALT 377)

Lagging Installation Preservation and Repairs

Deck House Firemain Isolation Valves Installation (T-ALT 367)

High Pressure Air Unions Replacement

04, 05, and 06 Level Stateroom Shower/Head Decks Renewal

Air Conditioning and Cargo Refrigeration Plant Expansion Joints Replacement

Sludge Incinerator Inspection, Maintenance and Sludge Tank Heater Installation (T-ALT 218)

Machinery and Cargo OWS Inspection, Cleaning and Recertification

JP-5 Fuel Flowmeter Installation (T-ALT 322)

Central Seawater Spool Piece Repairs, Modifications (T-ALT 238)

CMWD Carbon Steel Piping and Check Valve Assy Replacement

Rudder Stock Gland Seal Inspection

Machinery Oily Water Separator Upgrade (T-ALT 430)

Miscellaneous Valves Repairs

SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY

CATEGORY “A” WORK ITEMS

Accommodation Ladders 5-Year Inspection and Load Testing

Lifeboats Certification 5-Year Maintenance and Falls Renewal

Rescue Boats 5-Year Recertification, Maintenance and Falls Renewal

Liferafts Testing and Recertification

Immersion Suit Testing and Inspection

VCHT Sewage System Piping Cleaning/Flush

Lifeboats & Rescue Boats Release Hooks Upgrade (T-ALT 376)

VCHT Check Valve Installation (T-ALT 362)

SECTION 800 HEATING, VENTILATION AND AIR CONDITIONING

CATEGORY “A” WORK ITEMS

Galley Exhaust Duct Cleaning Laundry Exhaust Duct Cleaning Air Conditioning Plants Servicing and Maintenance

Cargo Refrigeration Plant Compressors Overhaul

AHU Heaters Replacement and Berps Installation

Shipyard Support for HVAC Variable Speed Drive Installation (iHVAC) (T-ALT 319)

Shipyard Support for Chiller Variable Speed Drive Installation (iHVAC) (T-ALT 319)

Galley HVAC Modifications (T-ALT 330)

SECTION 900 DRYDOCKING AND UNDOCKING

CATEGORY “A” WORK ITEMS

Dry-Docking and Undocking

Propeller Shaft and Stern Tube Inspection (Includes reference Cells Removal and Tube Recoating)

Stern Tube Seal Inspection

Bow Thruster 5-Year Maintenance

Bow Thruster Propeller Polish

Zinc Anode Renewals in Seachests, Rope Guard and Bow Thruster

Range and Paint Ground Tackle

Sea Valves Overhaul and Testing

Inspect and Repair Cathodic Protection

Shaft Grounding Preventive Maintenance

Waster Sleeves Renewal

Bilge Keel Stabilizers Inspection and Float Coat

Underwater Hull Cleaning and Painting – Full blast

Freeboard Cleaning and Painting – Full Blast

Bow Thruster Cooling Regulator Installation (T-ALT 227)

Propeller Boss Cap Replacement (T-ALT 325)

Bow Thruster Tunnel Grating Repairs

CATEGORY “B” WORK ITEMS

Dry-Docking and Undocking

SECTION 1000 UNREP GEAR

CATEGORY “A” WORK ITEMS

Hello Deck Safety Nets Refurbishment, Rewiring and Load Testing

RAS Station Sliding Block Drive Chain Replacement and Guide Rail Refurbishment

Section D - Packaging and Marking

CLAUSES INCORPORATED BY FULL TEXT

WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS

In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government
0007
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

252.217-7005
Inspection and Manner of Doing Work
JUL 2009
252.217-7006
Title
DEC 1991
252.217-7013
Guarantees
DEC 1991

Section F - Delivery and Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A
0002
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A
0003
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A
0004
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A
0005
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A
0006
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A
0007
POP 31-OCT-2016 TO

09-FEB-2017

N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984

52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $86,456.00 per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.

(End of clause)

F-1

SHIP AVAILABILITY PERIOD

It is anticipated that ship will arrive at Contractor’s yard on or about 31 October 2016. All work shall be completed in no more than 102 calendar days from actual start date designated by the Government at time of contract award.

F-2

PLACE OF PERFORMANCE

The place of performance for this contract shall be the contractor’s facility Section G - Contract Administration data

CLAUSES INCORPORATED BY REFERENCE

252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through

WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMMERCIAL INVOICE

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

GOVERNMENT

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF

Data to be entered in WAWF

Pay Official DoDAAC

N32205 Issue By DoDAAC

Admin DoDAAC

Inspect By DoDAAC

Ship To Code

N62387 Ship From Code

Mark For Code

Service Approver (DoDAAC)

Service Acceptor (DoDAAC)

Accept at Other DoDAAC

LPO DoDAAC

DCAA Auditor DoDAAC

Other DoDAAC(s)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

NOT APPLICABLE

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

MSCHQ_WAWF@NAVY.MIL

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

ADDENDUM TO 252.232-7006

The following information, at a minimum, must be attached into Wide Area Work Flow (WAWF) and submitted with each and every invoice showing certification with the Onsite Management Team prior to submission:

CLIN #
Contract Price Through Mod P0000x
% Complete
Contract Completed ($)
Less Retainage ($)
Less Prev Payments ($)
Amount due this Invoice ($)
Total Invoiced to Date ($)
0005
Option
0006
Option
0007
Option

Military Sealift Command

Administering Contracting Officer

Military Sealift Command

Ship Yard Representative

Port Engineer

(End of instructions)

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

(End of instructions) Section H - Special Contract Requirements

CLAUSES INCORPORATED BY FULL TEXT

SECTION H CLAUSES

H-1

OPTION FOR INCREASED QUANTITIES

The Government may require the delivery of the numbered line items identified in Section B as option items in any amount up to the unit quantities and at the unit prices stated in the contractor’s Price Breakdown. The Contracting Officer (KO) may exercise the options by giving the contractor written notification or via issuance of standard modification (SF 30). Delivery of option items shall be within the performance period identified in Section F unless the parties otherwise agree.

H-2

PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES

(a) Policy. In compliance with Executive Order Number 11752 (38 F.R. 34793), the policy of the Department of the Navy (DON) is to conform to the provisions of the Federal Water Pollution Control Act, as amended (Title 33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (Title 33 U.S.C. 2701 et seq), insofar as these Acts prohibit the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these Acts pertain specifically to the Naval vessel and shore activities. The prescribed clause is intended to implement that policy with respect to the ship(s) being constructed or undergoing repair and overhaul under this contract.

(b) Definitions. For the purpose of this clause, the terms "oil," "oily mixtures," "hazardous substance," and "discharge" shall have the meanings as defined in the Acts referred to in paragraph (a) of this clause and other environmental statutes.

(c) Trials. Prior to commencement of any dock or sea trials hereunder, the contractor shall assure the Administrative Contracting Officer (ACO)/Contracting Officer Representative (COR) by demonstrations, completed test memoranda, or other means reasonably acceptable to the ACO/COR that all equipment, the function of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the ship, that the contractor shall be required by the specifications to install, are fully operable.

(d) Reports. The contractor shall, as soon as it has knowledge of any discharge of oil, oily substance, or hazardous substance from the ship, immediately notify the ACO/COR thereof and shall immediately take all reasonable steps to prevent further discharge. Within 24-hours thereafter, the contractor shall file with the ACO the "Oil or Hazardous Substance Discharge Report.”

(e) Liability. The contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substance, except that the contractor shall be liable to the Government for all such costs of removal where such discharge was the result of willful negligence or willful misconduct within the privity and knowledge of the contractor.

H-3 ADDITIONAL GOVERNMENT REQUIREMENTS Contract Line Item Number (CLIN 0002)

(a) The Government may utilize CLIN 0002 for and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned work items (WIs), to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently with H-4 (ODC).

(b) As a result of a discrepancy found between the work item and the current conditions or a needed repair found during the open and inspect phase of the work item, the contractor may submit a Condition Found Report (CFR) to the Administrative Contracting Officer (ACO) and the Principle Port Engineer (PPE). As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) days period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the KO to take any of the three options set forth in subparagraph (d) below. AGR proposals shall be priced using the Fully-Burdened Labor Rate (FBLR) set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and will also be used for negotiating changes as required by this clause. As part of the contractor’s proposal submission for AGR, the following shall be included:

- Fully Burdened Labor Rate

- Proposed Labor Mix/Categories

- Proposed Man Hours

- Total Proposed AGR

(c) Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.

(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:

(1) Have the work performed by the Government;

(2) Issue a unilateral modification

(3) Cancel the requirement.

(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.

(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the "Additional Government Requirements" (CLIN 0002). Settlement of “Additional Government Requirements” (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled RFP and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0005 at contract completion shall be de-obligated.

H-4

OTHER DIRECT COSTS (CLIN 0002)

(a) The Government may utilize CLIN 0002 for and not limited to, material and equipment, generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned work items (WIs), to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with AGR, and therefore will be performed concurrently with H-3 (AGR).

(b) As a result of a discrepancy found between the work item and the current conditions or a needed repair found during the open and inspect phase of the work item, the contractor may submit a Condition Found Report (CFR) to the Administrative Contracting Officer (ACO) and the Principle Port Engineer (PPE). As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) days period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the KO to take any of the three options set forth in subparagraph (d) below. As part of the contractor’s proposal submission for Other Direct Costs (ODCs), the following shall be included:

Material

Part number

Order quantity

Unit Price

Total Price

Equipment

Part number

Order quantity

Unit price

Total price

Other Direct Costs not captured above

Travel

Per Diem (lodging, M&IE daily rates)

Subcontractor Proposal Breakdown shall include but not limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (Fully Burdened Labor Rate, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)

Etc.

The General and Administration (G&A) and Profit rates proposed shall be the same as the rates provided under CLIN 0002 in the contract.

(c) Considering, G&A and Profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the costs of the ODCs are fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.

(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:

(1) Have the work performed by the Government;

(2) Issue a unilateral modification

(3) Cancel the requirement.

(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the ODC at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.

(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the "Other Direct Costs" (CLIN 0002). Settlement of “Other Direct Costs” (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled RFP and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0005 at contract completion shall be de-obligated.

H-5

EMPLOYMENT OF NAVY PERSONNEL RESTRICTED

In performing this contract, the contractor will not use as a consultant or employ (on either a full or part-time basis) any active duty Navy personnel (civilian or military) without the prior approval of the contracting officer. Such approval may be given only in circumstances where it is clear that no laws and no DOD or Navy instructions, regulations, or policies are contravened and no appearance of a conflict of interest will result.

H-6

ASBESTOS REMOVAL REQUIREMENTS

(a) During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos containing products. This clause applies to each instance of asbestos removal or disturbance.

(b) The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, State, and Local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

(c) The latest change to the Federal, State and Local Regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the Occupational Safety and Health Administration (OSHA) Action level airborne concentration (currently 0.1 fibers per cubic centimeter (f/cc) of air).

(d) During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

(e) After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

(f) In all respects, the performance of air sampling and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .