QA1_SBX_RFP_16R3101.pdf
PDF 10 KB Posted
- Solicitation number
- N32205-16-R-3101
About this file
Questions Answers 1 in response to questions regarding the SBX-1 RFP.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N32205-16-R-3101 SBX-1 Operation & Maintenance
QUESTIONS AND ANSWERS # 1
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
1. Will MSC be providing the Collective Bargaining Agreements (CBAs) for the unions involved in the current SBX-1 Operations & Maintenance contract?
ANSWER: MSC will obtain copies of the CBAs ASAP for distribution to potential offerors.
2. L-8.D Italicized note at very end of this section states that “narratives shall not exceed 10 pages in length.” It is unclear whether the 10 pages is (1) the complete allowed page length of section D (minus tables for 7. Safety Performance); or (2) the allowed page length for each past technical performance subfactor (7 subfactors total, max 60 pages for 1-6, and tables for 7.
Safety Performance). Please clarify.
ANSWER: The Past Performance Narrative (Attachment K) shall be no longer than 10 pages in length total for subfactors 1 through 6. Data required for Factor 7 (tables and synopsis) - Safety Performance shall not be counted against the 10 page limit.
File details come from the government source that posted it. Updated .