USNS SBX-1 OPERATIONS MANUAL
Stability Criteria, Operating Procedures
And System Information
Volume I
Revision 2
January 23, 2014
21, 26, 28
Electronically published by ABS Houston.
Reference T1374991, dated 02-JUL-2015.
SBX 1 OPERATIONS MANUAL
VOLUME I
REVISION HISTORY
04 December 2006 - Manual was updated to reflect actual configuration of vessel.
1. Section 7.4.4 was updated to exclude LED lights which do not exist, and include the local IMAC display.
2. Section 7.4.6 was updated to reflect actual configuration of Valve Solenoids on
Uninterruptible Power Supply (UPS)
3. Section 7.5.6 was also updated to reflect actual configuration of Valve Solenoids on Uninterruptible Power Supply (UPS)
4. Section 13.2 was updated to reflect actual configuration of Hydraulic Power Units
(HPU) separately on the Main and Emergency Power busses
17 November 2006 - As per Glosten Recommendations after the installation of
WAVEX (wave extractor)
1. Section 12.4.3 was updated to give vessel operating limits for remaining at
Transit draft under the following 3 conditions.
a. Wavex not operable 2.4 meter seas transit draft limit
b. Wavex operable wave period less than 9 seconds and greater than
16seconds, 3.3 meter seas transit draft limit.
c. Wavex operable wave period between 9 seconds and 16 seconds, 3.3 meter seas transit draft limit with waves on the bow or stern, 2.4 meter seas transit draft limit with waves on the beam.
June 2012 - Reformatting in entirety and updating of manual to include:
1. UPDATE SBX Mission Organization Matrix
2. Updates to Vessel Characteristics to reflect Jan 2010 Stability Booklet (ABS
Approval 15 Mar 2010)
3. Update to Vessel Loading, Capacities and Stability information to reflect Jan
2010 Stability Booklet (ABS Approval 15 Mar 2010)
4. Review and update of Vessel Machinery List
5. Update to Ballast Procedures
6. Update to Dynamic Positioning and Autopilot information and related references
7. Reformatting of Main Propulsion Section
8. Addition of Shore Power and procedures
9. Update to Rescue Boat designation
10. Addition of Fast Rescue Boat and Davit
11. Addition of Fast Rescue Boat Launching/Recovery Procedures
12. Addition of Port Crane
13. Update capabilities of Stbd Crane
14. Removal of references to the FROG
15. Update Emergency Radome Presurized System information
16. General updates to navigation and communications equipment
Table of Contents
1 ABBREVIATIONS
2 FOREWORD
2.1 SBX MISSION ORGANIZATION MATRIX
2.2 VESSEL TO SHORE RELATIONSHIP
3 GENERAL INFORMATION AND VESSEL CHARACTERISTICS
3.1 Introduction
3.2 VESSEL PARTICULARS
3.2.1 Lightship condition
3.2.2 Mean Lightship Operating Condition (Section Replaced)
3.2.3 Drafts (Entire Section Updated)
3.2.4 Table of Hydrostatic Properties (Section Replaced)
4 Vessel Loading, Capacities and Stability
4.1 General Loading Information
4.2 Allowable VCG (Section Replaced)
4.3 Tank Capacity Tables (Section Replaced)
5 VESSEL MACHINERY LIST
6 BALLAST & BILGE SYSTEM
6.1 Design Philosophy
6.2 Ballast System Description
6.3 Ballast System REQUIRED Operation
6.4 Ballast Electrical and Control System
6.4.1 Control System
6.4.2 Centralized Control Station
6.4.3 Independent Local Control
6.4.4 Remote Input / Output Modules
6.4.5 Disconnects
6.4.6 Valve Controls
6.4.7 Ballast System Alarms
6.4.8 Vent and Sounding System
6.4.9 Limitations to SBX Operations
6.4.10 Ballasting Preparation/Guidelines
6.4.11 Deballasting Preparations/Guidelines
6.4.12 Ballasting Sequence
6.4.13 Emergency Procedures When Flooding (ballasting) Or De-Ballasting
6.5 Bilge System
6.5.1 Description
6.5.2 Mechanical
6.5.3 Electrical & Instrumentation
6.5.4 Piping
6.5.5 Oily Water Separator
6.5.6 Alarms
7 ELECTRICAL POWER AND CONTROL SYSTEMS
7.1 Introduction
7.2 High Voltage (HV) Power Generation
7.2.1 Diesel Generators
7.2.1.1 Fuel Oil System
7.2.1.2 Lubricating Oil System
7.2.1.3 Sea Water Cooling Systems
7.2.1.4 Fresh Water Cooling Systems
7.2.1.5 Compressed Air Systems
7.2.1.6 Ventilation Supply and Exhaust from Engine Rooms
7.2.1.7 Emergency Shutdown and Emergency Stops
7.3 Power Distribution
7.3.1 High voltage (11kV)
7.3.2 Low Voltage (LV) (480V)
7.3.3 Low Voltage Main and Emergency (208/120V)
7.3.4 DC Voltage (24V)
7.3.5 Uninterruptible Power Supplies (UPS)
7.4 Propulsion Thrusters
7.4.1 Azimuth Thrusters
7.5 Dynamic Positioning and Autopilot (Updated Section)
7.5.1 Introduction
7.5.2 Dynamic Positioning
7.5.3 Modes for the DP system
7.5.4 Auto Pilot
7.5.5 Built-In Trainer
7.5.6 Thruster, Propeller and Power Plant Interfaces
7.6 IMAC & Power Management
7.6.1 Power Management System (PMS)
7.6.1.1 Load Sharing
7.6.1.2 Load Limiting
7.6.1.3 Load Shedding
7.6.1.4 Operating Scenarios (Restrictions)
7.6.1.5 Emergency Switchboard Back-feed Limitations
7.7 Main Propulsion
7.7.1 FUNCTIONAL DESCRIPTION
7.7.1.1 Control Modes
7.7.1.2 Operation Modes
7.7.2 Interlocks. / Automation
7.7.3 Indicating functions
7.7.4 INTERFACE LIST
7.7.5 Trouble Shooting
7.7.6 Documentation and Drawings
7.7.7 Thrusters/General
7.8 Power Management
7.8.1 The Electric Power Plant
7.8.2 HV Bus-Local operation philosophy
7.8.2.1 Feeder Breaker Control
7.8.2.2 Tie Breaker Control
7.8.2.3 Generator Breaker Control
7.8.2.4 Propulsion Bus/Switchboard No. 1:
7.8.3 Generator Breaker Control
7.8.3.1 Generator breaker connection:
7.8.3.2 Generator breaker disconnection
7.8.3.3 Load Dependent Start/Stop
7.8.3.4 Start Blocking of Heavy Consumers
7.8.4 Blackout Restart
7.8.4.1 11 kV switchboard reconnection
7.8.4.2 HV / LV switchboard reconnection
7.8.5 Bus tie Breaker Control
7.8.5.1 HV switchboard bus tie control
7.8.6 Power limitation of thruster drives
7.8.6.1 Power limitation of thrusters
7.8.7 LV Switchboard Control, local operation
7.8.8 LV Switchboard Control – remote Operation
7.8.8.1 LV Breaker operation
7.8.8.2 Short time paralleling – transfer
7.8.9 Emergency Generator Back-feed
7.8.10 Shore Power (Updated Section)
7.8.10.1 Procedure for switching to Shore Power
7.8.10.2 Procedure to restore ships power
7.8.10.3 Shore Supply Interlock
7.9 Ship Service Diesel Generators
7.9.1 Diesel engine control and monitoring
7.9.2 Local Control Unit
7.9.3 Diesel Engine Start
7.9.4 Diesel Engine Stop
7.9.5 Diesel Engine Start Blocking
7.9.6 Diesel Engine Alarm Start
7.9.7 Diesel Engine Safety System
7.9.8 Auxiliary Equipment Control
7.9.9 Diesel Engine General Parameters
7.9.10 Diesel Engine Alarm & Monitoring
8 EMERGENCY PROCEDURES
8.1 Intent
8.2 Fire Procedure
8.3 Emergency Evacuation Procedure
8.3.1 Applicable Conditions
8.3.2 Means of Abandonment
8.3.3 Order of Abandonment
8.3.4 General Abandonment Procedure
8.3.5 Skeleton Crew
8.3.6 Alarm
8.3.7 Assembly
8.3.8 Communication with Rescue Personnel
8.3.9 Securing Equipment
8.3.10 Transmission of Emergency Signal
8.4 Lifesaving Equipment
8.4.1 Life Boats
8.4.2 Standard Operating Instructions
8.4.3 Life Rafts
8.4.4 Rescue Boats
8.4.4.1 Lifeboat / Rescue Boat #2:
8.4.4.2 Fast Rescue Boat
(New Section)
8.5 Helicopter Emergency Procedure
8.6 Man Overboard Procedure
8.7 Emergency Escape Routes
8.7.1 Living Quarters
8.7.2 Engine Room
8.7.3 Fore and Aft Pump Rooms
8.8 DAMAGE FLOODING COUNTERMEASURES
8.8.1 General Procedure for De-ballasting or Counter-flooding in the Event of
Damage to a Hull Compartment
8.8.1.1 General Procedures
8.8.1.2 Actions To Be Taken Immediately After Damage
8.8.2 Guidance on the Potential Effects of Corrective Measure
8.9 Emergency Towing
9 MEASURES FOR SAFE OPERATION
9.1 General
9.2 Measures for Safe Operation and Severe Storm
9.2.1 Watertight Integrity
9.2.2 Lightning:
9.3 Changes in Loading – General
9.4 Changes in Loading and Related Measures for Severe Weather
9.4.1 Severe Storm Measures for all Conditions
9.4.2 Severe Storm Measures – Ballasted on Location Only
9.4.3 Severe Storm Measure – While in Transit
9.4.4 Ice Load Information
9.4.4.1 Ice Types
9.4.4.2 Snow
9.4.4.3 Ice and Snow Combination
9.4.4.4 Calculation of Ice Loads
9.4.4.5 General Precautions During Icing
9.5 Standard Procedures While a Support Vessel is Alongside
9.6 CO2 System Safety – IAS Policy
9.7 Hypothermia and Severe Cold
9.8 Underwater Repair Work
9.8.1 General
9.8.2 Diver Assisted Repairs
9.9 Topside Grounding and Bonding Practices for the SBX
9.10 Radiation Hazards
9.11 Dangerous Materials Stowage
9.12 Under Tow
9.12.1 Transiting Preparation
9.12.2 Procedure for Towing Without the Use of the Azimuth Thruster(s)
9.12.3 Alternative Procedure
9.12.4 Towing Equipment
10 Manual Start-up Procedures for Vessel Systems
10.1 Fuel Oil Bunkers
10.2 Fuel Oil Transfer
10.3 Lube Oil Transfer
10.4 Salt Water Cooling System
10.5 Thruster Salt Water Cooling
10.6 Fresh Water Cooling System
10.7 Thruster Fresh Water Cooling
10.8 Chiller Water System
10.9 Breaker Locations
10.10 Refrigeration system
10.11 F.O. Purifier
10.12 Watermaker R/O Unit
10.13 OILY WATER SEPARATOR PROCEDURE
10.14 MSD ORCA UNIT
10.15 Main Engine
10.16 Emergency Generator
11 VALVE HYDRAULIC SYSTEM
11.1 System Overview
11.2 Hydraulic Power
11.3 Valve Control Stations
12 FUEL OIL STORAGE/TRANSFER/SERVICE SYSTEM
12.1 Fuel Oil Storage
12.2 Fuel Oil Transfer
12.2.1 Preparation for Fueling
12.2.2 Fueling Guidelines
12.2.3 Fuel Oil Transfer Stations
12.2.4 Fuel Oil Overflow System
12.2.5 Fuel Oil Transfer – Internal
12.3 Fuel Oil Service System
12.3.1 Fuel Flow
12.3.2 Electrical and Instrumentation:
12.3.3 System Alarms
13 EMERGENCY POWER
13.1 Emergency Power System
13.1.1 Engine Data
13.1.2 Alarm and Shutdown Functions
13.2 Emergency Switchboard
13.3 General Alarm System
13.4 Emergency Lighting System
13.5 Fog Horn
13.6 Radio
13.7 UPS Equipment
14 FIRE FIGHTING SYSTEMS
14.1 Fire Detection and Alarm System
14.2 Fire Water System
14.2.1 Mechanical
14.2.2 Piping
14.2.3 Electrical and Instrumentation
14.2.4 Alarms
14.2.5 International Shore Connections
14.3 Fixed CO2 System
14.4 Hi-Fog Water Spray System
14.4.1 Fire Instruction
14.5 Foam System
14.5.1 Alcohol Resistant AFFF Extinguisher
14.6 Portable Fire Extinguishers
14.7 Generator CO
Suppression System
14.8 Fire Zone Boundaries
15 Helicopter Deck
15.1 Descriptive Data
15.2 Helicopter Operations
15.3 Arrangement of Helicopter Deck
15.4 Fixed Foam System
15.4.1 System Components
15.5 SBX Helicopter Operations Limitations
16 AUXILIARY SYSTEMS
16.1 Compressed Air System
16.2 Dirty Drain Collections and Processing System
16.3 Main Sea Water Cooling System
16.4 Sea Water Service System
16.5 Engine Exhaust and Crankcase Vent System
16.6 Lube Oil System
16.7 Gray/Black Water System
16.8 Potable Water System
16.9 Glycol Recovery System
16.10 Impressed Current Cathodic Protection (ICCP)
16.11 Fresh Water Cooling System
17 VENTILATION
17.1 General
17.2 Platform Ventilation
17.3 Accommodation Module HVAC
17.4 Machinery Module HVAC
17.5 XBR Module HVAC
18 Lifting and Handling Equipment
18.1 Deck Crane
18.1.1 Personnel Transfer with Deck Crane
18.2 Machinery Handling Trolley Hoists
18.3 Elevators
18.3.1 Design Parameters
18.3.2 Control Systems
19 PAYLOAD AUXILIARY EQUIPMENT (Payload Mission Equipment)
19.1 The XBR Liquid Cooling and Circulating System (LCCS)
19.2 The Radome Pressurization
19.3 The Radome Dehumidification System
19.4 SBX Door Closures
19.5 The Weather/Air Search Radar (WXASR)
20 NAVIGATION
20.1 Navigation Lights and Shapes
20.2 RADAR SYSTEMS
20.3 DGPS SYSTEMS
20.4 EPIRB AND SARTS
20.5 FATHOMETER
20.6 DOPPLER SPEED LOG
20.7 MAGNETIC COMPASS
20.8 GYRO COMPASS
20.9 Automatic Identification System
20.10 Anemometer
20.11 VOYAGE DATA RECORDER
20.12 NAVTEX
20.13 WEATHER FAX
21 COMMUNICATIONS SYSTEMS
21.1 GLOBAL MARITIME DISTRESS SAFETY SYSTEM
21.1.1 VHF RADIOS
21.2 AIRCRAFT COMMUNICATIONS
21.3 DIAL TELEPHONE SYSTEM
21.4 INTEGRATED PA/GA ENTERTAINMENT SYSTEM
21.5 TALKBACK SYSTEM
21.6 SOUND POWERED PHONE SYSTEM
21.7 LAN SYSTEM
21.8 CLOSED CIRCUIT TELEVISION SYSTEM (CCTV)
21.8.1 SECURITY CAMERAS
21.8.2 NAVIGATION CAMERAS
22 MOORING
ABBREVIATIONS
ABS
American Bureau of Shipping
AC
Alternating Current
A/C Air Condition
ACC
Automated Centralized Control
AHU
Air Handling Units
AMOT
Automatic Motor Operating Throttling
AP
Automatic Pilot
ARPA
Automatic Radar Plotting Aid
ATS Automatic Transfer Switch
AVR
Automatic Voltage Regulator
BALFS
Ballast Field Station
BFS
Back Feed Switch
BIST Built-In System Test
BITE
Built-In Test Equipment
BMR
Ballast Machinery Room
BOS Bridge Operating System
C/B Circuit Breaker
CCS
Centralized Control Station
CS
Control Switch
DARPS
Differential Absolute and Relative Positioning Sensor
DC Direct Current
DG Diesel generator
DGPS
Differential Global Positioning System
DIGITRIP
Digital Trip
DNV
Det Norske Veritas
DP
Dynamic Positioning
DPC
Dynamic Positioning Controller
DSLC Digital Synchronizer and Load Control
EBL
Electronic Bearing Line
ECDIS
Electronic Chart Display and Information System
ECR Engine Control Room
ECS
Engine Control Switch
EED
Electromagnetically Initiated Explosive Device
EGB
Electronic Governor Ballhead
ELP
Emergency Lighting Panel
EOS Engine Operator Station
ESD
Emergency Shut Down
FDS
Fire Damper Detection System
FO Fuel oil
FU
Follow Up
FW Fresh water
FSU
Floating Storage Unit
GMDSS
Global Maritime Distress & Safety System
GPS
Global Positioning System
HMI
Human-Machine Interface
HPU
Hydraulic Power Units
HT High Temperature
HV
High Voltage
IAS
Integrated Automation System
IAS
Interocean American Shipping
IHO
International Hydrographic Organization
INCB
Incoming Circuit Breaker
I/O Input/Output
IMAC Integrated Monitoring and Control System
IMO
International Maritime Organization
INCOM Industrial Communications (Cutler-Hammer)
I/O Input/Output
ISM International Safety Management
ISO
International Organization for Standards
ISS
Incomer Selector Switch
I.W.O.
In Way Of
JS
Joy Stick
KFDD
Kongsberg Function
KG
Kilogram
KM Kongsberg Maritime
LAN
Local Area Network
LCCS Liquid Conditioning and Cooling System
LMP
Lips Micro Processor
LO Lubrication oil
LONWORKS Local Operating Network using Echelon Lon Works network technology
LOS
Local Operating Station
LP
Lighting Panel
LT Low temperature
LV Low voltage (480V, 208/120 V systems)
MAS
Medical Advisory Service
MCC
Motor Control Center
MMINT Modbus Master Incon Network Translator
MODU Mobile Offshore Drilling Units
MPC
Model Predictive Control
MRU
Motion Reference Unit
MSC
Maritime Safety Committee
MSLC Master Synchronizer and Load Control
NDU
Network Distribution Unit
NFU
Non Follow Up
OMV
Operations Manual - Vessel
OS Operator Station
OT
Operator Terminal
PDG
Port Diesel Generator
PFD
Personal Floatation Device
PFO
Port Fuel Oil
PFS Power Field Stations
PGB
Propulsion Gear Box
PGV
Port Generator Ventilation
PIC
Person in Charge
PLC
Programmable Logic Controller
PMS
Power Management System
PP
Power Panel
PPE
Personal Protective Equipment
PPM Power Pack Module
PS Process Station, Process Control Cabinet
QCV Quick Closing Valve
QCC
Quick Connect Clutch
QMS Quality Management System
RAO
Response Amplitude Operator
RI/O
Remote Input/Output
ROT
Rate of Turn
ROV Remotely Operated Valve
RPM
Revolutions Per Minute
RDS
Radome Dehumidification System
RPS
Radome Pressurization System
RSS
Radar Support Structure
SAL Single Anchor Loading
SBC Single Board Computer
SDG
Starboard Diesel Generator
SGV
Starboard
SFO
SIFT
Software Implemented Fault Tolerance
SPS
Shore Power Switch
SSDG
Ships Service Diesel Generator
STBD
STL
Submerged Turret Loading
SVC Simrad Vessel Control System
SW Sea water
SWBD
Switchboard
TC
Terminal Connector
TMR
Triple Modular Redundancy
TSS
Transformer Selector Switch
UGB
Upper Gear Box
UPS
Uninterruptible Power Supply
USCG
United States Coast Guard
UTM
Universal Transverse Mercator
VCG Vertical Center of Gravity
VDU Video Display Unit
VRS Vertical Reference Sensor
VWC
Variable Watch Circle
WT Water Tight
WXASR Weather/Air Search Radar
FOREWORD
This manual has been prepared for the shipboard personnel and serves as a method of rapid familiarization with the vessel’s construction, classification and operating systems.
The manual is divided into three volumes:
Volume I: STABILITY CRITERIA, OPERATING PROCEDURES AND SYSTEM
INFORMATION
Volume II: SAFETY PLAN AND SYSTEMS DRAWINGS
Volume III: STABILITY ANALYSES, CAPACITY TABLES, IMAC LIST and ROV LIST
This manual is not intended to replace existing manuals supplied by the shipyard and the various vendors but is to be used in conjunction with these manuals.
All actions and operations performed on the vessel are to conform to TOTE Services
Inernational Safety Management and ISO 9002 Quality System.
The complete sets of IAS manuals covering the above systems have been placed aboard.
The Master of the vessel has the overriding responsibility for the safe operation of the vessel, and the authority and discretion to take whatever action he considers in the best interests of the crew, vessel, and marine environment. The overall responsibility for supervision, budgetary control, technical and supportive services is with the Company and to establish, implement and review (semi-annually) the Quality Management System (QMS), safety and environmental protection programs contained therein. The Master has the primary responsibility to ensure that the crew is motivated in the observation and accomplishment of policies laid out in the quality management documentation.
2.1
SBX MISSION ORGANIZATION MATRIX
The SBX Mission Crew, under the supervision of the SBX Site Manager, is responsible for the execution of SBX Missions. The SBX
Site Manager is also responsible for management of the payload SBX Mission Crew. The Site Manager coordinates all “sea-going” activities and management of the vessel with the Vessel master. The Vessel master is responsible for supporting the SBX Site Manager, but has full responsibility for the vessel marine crew, sea-going day-to-day activities, and safe sea-going operation of the vessel. The vessel marine crew and the SBX Mission crew are organized into departments under the Site Manager as follows:
Site Manager
Mission Director
Test Staff
XBR
GCN
O&S Manager
Vessel
Superintendent
Safety Lead
Tech/
Admin/Log Lead
Tech/
Admin/Log Lead
Security Deck Eng Verification Lead
Staff
GMX COTR
Platform
NMC
OSSC
FSO
Steward
2.2
VESSEL TO SHORE RELATIONSHIP
VP HUMAN RELATIONS SBX OPS
ISM DESIGNATED
PERSON
VP GENERAL
MANAGER
PERSONNEL & INSURANCE SAFETY/ENVIRONMENTAL TECHNICAL OPERATION
MASTER
PORT
ENGINEER /
PORT
CAPTAIN
CHIEF ENGR
FIRST ASST
THIRD ASSTs
SECOND
ASST
QMED
WIPER
SECOND MATE
THIRD MATEs
BRIDGE WORK
DECK WORK
BOSUN
ABs & OSs
CHIEF
STEWARD
STEWARD
ASST
CHIEF MATE
PWR PLANT
ELECTRICIAN
CHIEF COOK
SECOND
COOK/BAKER
ASST COOK
ELECTRONIC
TECHNICIAN
STORE
KEEPER
QMED
ELECTRICIAN
GENERAL INFORMATION AND VESSEL CHARACTERISTICS
3.1 Introduction
The SBX 1 vessel is a semi-submersible unit with three pairs of columns and one pair of pontoons. The unit is also equipped with (4) four Azimuth Thrusters. The unit was designed by Moss Maritime as a bare deck multipurpose platform capable of carrying a topside load of 20,000 metric tons.
The initial modification work was directed by Glosten Associates, Inc. and carried out by
AMFELS shipyard Brownsville, Texas.
The United States Coast Guard (USCG) has determined that the vessel will be documented and certificated as a cargo and miscellaneous vessel. ABS will class it as a MODU, so there is a need to demonstrate equivalent compliance in many areas. The vessel is certified under the Alternate Compliance Program (ACP) of the USCG. The regulatory compliance matrix that applies for the ACP enrollment is found in 1.5 of this section. The vessel is classed A1, Column Stabilized Unit, AMS, ACC.
References through this volume will identify drawings, produced by the following:
The Glosten Associates, Moss CS50 drawings and AMFELS.
3.2
VESSEL PARTICULARS
ABS ID Number 02-136801
U.S.C.G. Number 722205
Hull Number 732057
Vessel Dimensions
Pontoons
Length Overall 118.56 m 388.98 ft
Breadth 14.45 m 47.41 ft
Depth 10.5 m 33.30 ft
Bilge Radius 1.90 m 6.23 ft
Pontoon Spacing (From Centerline) 58.00 m 190.29 ft
Beam Including Bolsters 84.00 m 275.6 ft
Column, Braces and Diagonals
Corner Column Square 12.8 x 12.15 m 41.98 x 39.88 ft
Midship Column Square 11.52 x 12.16 m 37.79 x 39.88 ft
Corner Column Height 28.00 m 91.86 ft
Midship Column Height 28.00 m 91.86 ft
Column Radii Outboard 2.50 m 8.20 ft
Corner Column spacing: Longitudinal 35.20 m 115.46 ft
Diameter of Trans. Horizontal Trusses 3.00/3.60 m 9.84/11.81 ft
Diameter of Horizontal Diagonal Trusses 3.00 m 9.84 ft
Diameter of Vertical Trusses 1.92 m 6.30 ft
Upper Hull (Main Deck)
Length of Deck 83.20 m 272.97 ft
Breadth of Deck 70.16 m 230.12 ft
Height to Double Bottom 38.15 m 125.13 ft
Height to Main Deck 40.65 m 133.37 ft
Air Draft – To top of lights on Radome 284’ 2 ¾” abl 86.64 m
(Not including lightning rod)
3.2.1 Lightship condition
Lightship Displacement 24,015.76 LT
LCG (+) AFT Frame 32 3.19 ft
TCG (+) STBD of CL 1.24 ft
VCG (+) above BL 97.90 ft
The above lightship characteristics are valid for the unit in the following configuration:
Liquids in machinery, piping, and systems at their normal operating levels;
Crane jib, elevators, and thrusters in their stowed positions;
Radar array stowed with face oriented towards starboard at zero elevation;
Anchors stowed on bolsters.
The following items are excluded from the lightship:
Crew and effects, stores, consumables;
Liquids in tanks such as ballast, fresh water, fuel, lube oil storage and waste, sludge, bilge water, and sewage;
Helicopter;
Fixed mooring system lines;
Marine growth.
3.2.2 Mean Lightship Operating Condition (Section Replaced)
The Mean Lightship Operating Condition (MLOC) includes the vessel’s lightship weight along with the weight of all items normally present aboard the vessel. Variable weights such as crew, stores and provisions are included in MLOC for convenience. Additionally, the emergency generator, glycol and sewage tanks, which are not listed in the tank tables, are included in
MLOC. These weights and tanks remain relatively constant and are a small portion of the total
MLOC weight. If significant weight changes occur, the MLOC weight should be adjusted to correct for the loading condition. A specific list of weights is included in the ABS approved
Stability Booklet.
Mean Lightship Operating Displacement 24,204.47 LT
LCG (+) AFT Frame 32 4.00 ft
TCG (+) STBD of CL 1.33 ft
VCG (+) above BL 98.25 ft
3.94
1.25
3.2.3 Drafts(Entire Section Updated)
The transit operational and survival drafts and displacements for the platform are summarized below:
Transit Draft 9.65m 31.7ft
Transit Draft Displacement 31,621 MT 31,122 LT
Operational Draft (Loadline) 23.5m 77.1ft
Operations Draft Displacement 50,000 MT 49,213 LT
Survival Draft 21.5m 70.5ft
Survival Draft Displacement 48,103 MT
47,343 LT
Air Draft (Above Baseline) 86.2m 282.8 ft
3.2.4 Table of Hydrostatic Properties (Section Replaced)
Below are the Hydrostatic Tables for the SBX-1 excerpted in the ABS Approved
Stability Booklet. The Displacements are listed for salt water with a SG of 1.025.
The following coordinate system is used for all hydrostatics: the longitudinal origin is Frame 32 positive aft, the transverse origin is the vessel centerline positive starboard, the vertical origin is the vessel baseline positive upwards.
General Hydrostatics (GHS) version 11.38C by Creative Systems was used to obtain the hydrostatic properties and tank tables (Reference 9) presented in this document. Data was derived from geometry file SBX_REVH.
Draft
(ft)
Displacement
SG = 1.025
(LT)
TPI
MTI
(LT-ft)
LCB
+Aft Fr
32 (ft)
KB
+Abv
BL (ft)
LCF
+ Aft Fr
KMT
KML
0 19252.9 84.83 2625 6.38 10.34 6.30 498.53 635.56
21 20270.8 84.83 2629 6.38 10.85e 6.30 474.53 604.67
22 21288.8 84.83 2634 6.38 11.36 6.30 452.87 576.79
23 22306.7 84.83 2639 6.37 11.87 6.30 433.23 551.50
24 23324.6 84.83 2644 6.37 12.38 6.30 415.35 528.45
25 24342.6 84.83 2649 6.37 12.88 6.30 399.00 507.38
26 25360.5 84.83 2655 6.36 13.39 6.30 384.01 488.04
27 26378.5 84.83 2661 6.36 13.90 6.30 370.22 470.23
28 27396.4 84.83 2667 6.36 14.40 6.30 357.48 453.78
29 28414.4 84.83 2673 6.36 14.91 6.30 345.70 438.54
30 29432.3 84.83 2679 6.35 15.41 6.30 334.76 424.40
31 30450.3 84.83 2686 6.35 15.92 6.30 324.59 411.23
32 31468.3 84.83 2693 6.35 16.42 6.30 315.11 398.94
33 32486.2 84.83 2700 6.35 16.92 6.30 306.25 387.46
34 33052.5 30.99 962 6.30 17.21 0.21 122.29 135.63
35 33424.2 30.97 964 6.23 17.40 0.21 121.24 134.50
36 33795.8 30.93 967 6.17 17.60 0.21 120.17 133.35
37 34165.6 30.70 964 6.10 17.80 0.21 118.47 131.59
38 34532.6 30.47 962 6.04 18.01 0.21 116.81 129.89
39 34896.9 30.24 960 5.98 18.22 0.21 115.21 128.24
40 35258.4 30.00 958 5.92 18.44 0.21 113.65 126.64
41 35593.6 26.74 777 5.86 18.65 0.00 101.43 101.83
42 35912.9 26.49 775 5.81 18.85 0.00 100.08 100.60
43 36241.4 28.64 853 5.76 19.07 0.00 102.46 109.76
44 36603.5 34.05 1007 5.70 19.31 0.00 103.73 128.30
Draft
(ft)
Displacement
SG = 1.025
TPI
MTI
(LT-ft)
LCB
+Aft Fr
KB
LCF
+ Aft Fr
KMT
KML
45 37043.2 42.49 1165 5.63 19.61 0.00 108.55 146.65
46 37587.1 47.36 1289 5.55 19.98 0.00 109.17 159.85
47 38172.0 49.77 1351 5.47 20.39 -0.06 108.63 165.02
48 38777.8 51.01 1390 5.38 20.81 0.32 107.62 167.05
49 39393.4 51.49 1408 5.30 21.25 -0.04 106.35 166.57
51 40627.3 50.85 1406 5.14 22.12 -0.05 103.35 161.29
52 41231.7 49.80 1389 5.06 22.55 -0.05 101.6 157.04
53 41816.0 47.64 1341 4.99 22.97 0.00 99.68 149.45
54 42365.6 43.50 1240 4.93 23.36 0.00 97.05 136.41
55 42832.1 33.90 1075 4.87 23.70 0.00 90.40 117.04
56 43202.3 27.77 917 4.83 23.98 0.00 87.75 98.91
57 43521.0 25.17 836 4.80 24.21 0.00 84.25 89.50
58 43805.2 23.58 786 4.76 24.43 0.00 81.76 83.60
59 44087.8 23.53 789 4.73 24.65 0.00 81.53 83.43
60 44369.9 23.48 793 4.70 24.87 0.00 81.31 83.27
61 44651.3 23.43 796 4.67 25.09 0.00 81.10 83.11
62 44932.1 23.38 799 4.64 25.32 0.00 80.92 82.95
63 45212.9 23.41 804 4.62 25.55 0.00 80.87 82.90
64 45494.0 23.44 809 4.59 25.79 0.00 80.82 82.86
65 45775.4 23.46 813 4.56 26.03 0.00 80.77 82.81
66 46057.2 23.50 818 4.53 26.27 0.00 80.73 82.79
67 46339.4 23.54 823 4.50 26.51 0.00 80.70 82.81
68 46622.2 23.59 828 4.48 26.76 0.00 80.67 82.84
69 46905.4 23.63 834 4.45 27.01 0.00 80.65 82.87
70 47189.3 23.68 839 4.42 27.27 0.00 80.63 82.91
71 47473.7 23.72 845 4.40 27.53 0.00 80.62 82.95
72 47758.6 23.76 850 4.37 27.79 0.00 80.61 83.00
73 48043.9 23.78 855 4.34 28.05 0.00 80.57 82.98
74 48329.3 23.78 860 4.32 28.32 0.00 80.50 82.91
75 48614.5 23.77 864 4.29 28.59 0.00 80.44 82.83
76 48899.6 23.75 868 4.27 28.87 0.00 80.37 82.75
77 49184.5 23.73 872 4.24 29.14 0.00 80.31 82.66
78 49469.2 23.71 876 4.22 29.42 0.00 80.26 82.59
79 49753.7 23.70 881 4.19 29.70 0.00 80.21 82.53
80 50038.0 23.68 885 4.17 29.99 0.00 80.18 82.48
Vessel Loading, Capacities and Stability
4.1 General Loading Information
When loading the vessel consideration must be made for trim, stability, bending stresses, deck stresses and general vessel safety. Reference the ABS Approved
Stability Booklet for specific information and calculations for the safe loading of fuel, ballast and deck loads including sounding tables and vessel loading forms.
Due to the nature of the SBX-1, the configuration of loads on deck does not change significantly during normal operations. The most common changes in vessel load condition and stability are the result of ballasting, de-ballasting and fuel transfer and loading. The processes these operations are detailed in following sections.
4.2 Allowable VCG (Section Replaced)
The maximum allowable VCGcorr.Curve and several sample loading conditions are plotted on the chart included in the ABS Approved Stability Booklet. VCG calculation must be corrected for free surface prior to comparing to the allowable
VCGcorr Curve.
The following table lists the maximum allowable VCGcorr.
Draft Max VCGcorr.
(ft) Abv BL (ft) Abv BL
26.25 192
32.81 113
33.89 108.79
41.99 99.28
58.01 81.12
66.93 78
70.54 76.5
77.1 75.5
4.3 Tank Capacity Tables (Section Replaced)
The following pages include tables that can also be found in the ABS Approved Stability
Booklet. These tables are for reference only, the ABS Approved Stability Booklet should be used for all stability calculations.
Tank
SG Volume Weight LCG TCG VCG
Max FSM
Trans. Long.
(ft3/LT) (ft3) (bbls) (LT) (ft) (ft) (ft) (ft‐LT) (ft‐LT)
BW ‐Pontoon Port
BW_1.P 35 24333 4334 695.2 ‐173.45 ‐95.15 18.56 2970 01 1003
BW_3.P 35 19868 3539 567.7 ‐150.44 ‐83.15 16.61 835 1114
BW_4.P 35 20211 3600 577.5 ‐125.98 ‐106.42 26.52 652 511
BW_5A.P 35 13987 2491 399.6 ‐99.25 ‐109.57 16.89 498 743
BW_5.P 35 24113 4295 688.9 ‐72.44 ‐106.88 16.81 979 1729
BW_6.P 35 27124 4831 775 ‐75.59 ‐83.09 17.21 1174 2986
BW_8.P 35 37966 6762 1084.7 ‐28.71 ‐108.12 15.65 2167 23533
BW_17.P 35 33366 5943 953.3 62.83 ‐108.23 15.4 2066 18153
BW_17A.P 35 13987 2491 399.6 99.25 ‐109.57 16.89 498 743
BW_19.P 35 20211 3600 577.5 125.98 ‐106.42 26.51 652 512
BW_21.P 35 29510 5256 843.1 156.78 ‐83.23 16.68 1227 3484
BW_22.P 35 24330 4333 695.2 186.05 ‐95.15 18.56 2959 1003
BW ‐Pontoon Stbd
BW_1.S 35 24333 4334 695.2 ‐173.45 95.15 18.56 2970 1003
BW_3.S 35 19868 3539 567.7 ‐150.44 83.15 16.61 835 1114
BW_4.S 35 20211 3600 577.5 ‐125.98 106.42 26.52 652 511
BW_5A.S 35 13987 2491 399.6 ‐99.25 109.57 16.89 498 743
BW_5.S 35 24113 4295 688.9 ‐72.44 106.88 16.81 979 1729
BW_8.S 35 37966 6762 1084.7 ‐28.71 108.12 15.65 2167 23533
BW_9.S 35 27117 4830 774.8 ‐37.8 83.09 17.21 1174 2984
BW_13.S 35 25062 4464 716.1 ‐0.78 82.6 18.25 1174 2986
BW_17.S 35 33366 5943 953.3 62.83 108.23 15.4 2066 18153
BW_17A.S 35 13987 2491 399.6 99.25 109.57 16.89 498 743
BW_19.S 35 20211 3600 577.5 125.98 106.42 26.51 652 512
BW_21.S 35 29510 5256 843.1 156.78 83.23 16.68 1227 3484
BW_22.S 35 24330 4333 695.2 186.05 95.15 18.56 2959 1003
Total BW in Pontoons 603066 107411 17230
BW ‐Column Tanks Port
BW_50.P 35 35636 6347 1018.2 ‐115.84 ‐93.62 44.72 9835 7587
BW_60.P 35 32188 5733 919.6 ‐115.72 ‐85.27 77.25 777 3444
BW_52.P 35 35636 6347 1018.2 115.84 ‐93.62 44.72 9835 7586
BW_62.P 35 32188 5733 919.6 115.72 ‐85.27 77.25 777 3444
BW ‐Column Tanks
Stbd
BW_50.S 35 35636 6347 1018.2 ‐115.84 93.62 44.72 9835 7587
BW_60.S 35 32188 5733 919.6 ‐115.72 85.27 77.25 777 3444
BW_52.S 35 35636 6347 1018.2 115.84 93.62 44.72 9835 7586
BW_62.S 35 32188 5733 919.6 115.72 85.27 77.25 777 3444
Total BW in Columns 271294 48319 7751
Fuel Oil ‐Pontoon Port
FO_9.P 42.23 27117 4830 642.1 ‐37.8 ‐83.09 17.21 996 2533
FO_10.P 42.23 18601 3313 440.5 0.91 ‐104.95 19.2 462 1770
FO_11.P 42.23 25062 4464 593.5 ‐0.78 ‐82.6 18.25 996 2535
FO_14.P 42.23 19833 3532 469.7 37.64 ‐104.59 19.22 509 2070
FO_16.P 42.23 27117 4830 642.1 37.8 ‐83.09 17.21 996 2533
FO_18.P 42.23 27124 4831 642.3 75.59 ‐83.09 17.21 996 2535
Fuel Oil ‐Pontoon Stbd
FO_11.S 42.23 18601 3313 440.5 0.91 104.95 19.2 462 1770
FO_14.S 42.23 19833 3532 469.7 37.64 104.59 19.22 509 2070
FO_16.S 42.23 27117 4830 642.1 37.8 83.09 17.21 996 2533
FO_18.S 42.23 27124 4831 642.3 75.59 83.09 17.21 996 2535
Total FO in Pontoons 237530 42306 5625
FW ‐Pontoon Stbd
FW_6.S 35.9 13562 2415 377.8 ‐85.04 83.09 17.21 573 364
FW_7.S 35.9 13562 2415 377.8 ‐66.14 83.09 17.21 573 364
Total FW in Pontoons 27124 4831 756
Machinery Module Port
FO_DAY.P 42.23 2903 517 68.7 128.09 ‐97.24 140.37 67 118
FO_SETT.P 42.23 2661 474 63 128.09 ‐109.32 140.37 51 108
LO_CLEAN.P 42.23 726 129 17.2 148.03 ‐95.14 140.37 8 4
LO_USED.P 42.23 363 65 8.6 148.03 ‐101.44 140.37 1 2
Machinery Module Stbd
FO_DAY.S 42.23 2903 517 68.7 128.09 97.24 140.37 67 118
FO_SETT.S 42.23 2661 474 63 128.09 109.32 140.37 51 108
OWHT.S 42.23 726 129 17.2 148.03 95.14 140.37 8 4
SLUDGE.S 42.23 363 65 8.6 148.03 101.44 140.37 1 2
Hull Slop Tanks (Not Used)
SLOP_1.S N/A 10423 1856 N/A ‐9.45 85.17 111.06 N/A N/A
Slop‐2.S N/A 4387 781 N/A 9.45 90.95 111.06 N/A N/A
Slop_3.S N/A 6036 1075 N/A 9.45 80.97 111.06 N/A N/A
Dry Bulk Tanks (Not Used)
CEMENT I N/A 3567 635 N/A 9.45 1105.12 74.11 N/A N/A
CEMENT II N/A 3567 635 N/A ‐9.45 ‐85.17 74.11 N/A N/A
CEMENT III N/A 3567 635 N/A 9.45 ‐105.12 74.11 N/A N/A
BENTONITE IV N/A 3567 635 N/A 9.45 ‐85.17 74.11 N/A N/A
BARYTE V N/A 3567 635 N/A ‐9.45 105.12 74.11 N/A N/A
BARYTE VI N/A 3567 635 N/A ‐9.45 85.17 74.11 N/A N/A
BARYTE VII N/A 3567 635 N/A 9.45 105.12 74.11 N/A N/A
BARYTE VIII N/A 3567 635 N/A 9.45 85.17 74.11 N/A N/A
-105.12
VESSEL MACHINERY LIST
SBX1 Equipment List
System Name (Serial #) Equipment Name Equipment Description (From Proposal Drawings) Equipment Location
Power Generation
S/N:S2B00105 AR:2322466 Emergency Generator Caterpillar 3508B 910kw (1219 HP) 480 Volt
Emergency Generator
Room
9RC00405 SSDG #1
Caterpillar 3612 3460kw (4640 HP) @ 900 RPM 11,000 Volt 215 gph fuel
Stbd Machinery Room
9RC00406 SSDG #2
Port Machinery Room
9RC00404 SSDG #3
9RC00408 SSDG #4
9RC00403 SSDG #5
9RC00409 SSDG #6
Propulsion
S/N T07568 Thruster #1
Wartsila Propulsion Netherlands B.V. LIPS FS2510-563/2500MNR
3,400kw (4,555 HP) 900 RPM Input, 192 RPM Prop, 2 RPM Steering, 6 min Retraction
Stbd Fwd Thruster
S/N T07569 Thruster #2
Port Fwd Thruster
S/N T07570 Thruster #3
Stbd Aft Thruster
S/N T07571 Thruster #4
Port Aft Thruster
NRN25413600010 MU488191B
Voltage Source
Converter #1
Siemens 6SE8045-2CA01-Z 60Hz input, 0-100Hz output 1,100V input, 635Amp
Stbd Fwd Pump Room
NRD02413600024 MU491935A
Converter #2
Port Fwd Pump Room
NRN25413600009 MU488191A
Converter #3
Stbd Aft Pump Room
NRD02413600025 MU491935B
Converter #4
Port Aft Pump Room
Ships Service Air
403170014 Start Air Comp #1 Ingersoll-Rand 15TX20 Reciprocating, 58 cfm @ 250 psig 20 hp Stbd Machinery Room
403170013 Start Air Comp #1 Ingersoll-Rand 15TX20 Reciprocating, 58 cfm @ 250 psig 20 hp Port Machinery Room
PX4756U05059
Ship's Service Air
Compressor
Ingersoll-Rand UP6-30-125 Rotary, 125 cfm @ 125 psig 30 hp Stbd Machinery Room
PX4756U05059
Ship's
Service Air
Compress or
Ingersoll-Rand UP6-30-125 Rotary, 125 cfm @ 125 psig
30 hp
Port
Machinery
221270 SS Air Receiver #1 1060gal 300 MAWP Hanson Manufacturing Stbd Machinery Room
221253 SS Air Receiver #2 1060gal 300 MAWP Hanson Manufacturing Port Machinery Room
BU0903170093
Rig Air
Compress or
Quincy Model QGB-60
Water
Processin g Rm
Lube Oil System
0104-4209B
Clean Lube Oil
Transfer Pump
Ingersoll-Dresser Model 2GASM1D0 1 hp 1,800 rpm 9 gpm @ 50 psi
Port Oil Processing
Rm
0304-7349
Used Lube Oil
Ingersoll-Dresser Model: 6GASM1B0 5 HP 1800rpm
240137
Clean Lube Oil Hand
Pump
Blackmer BR210A (Repair Kit # 10049)
Dirty Drain Collection Sys
Dirty Drain Xfer Pump
#1
Edson 220 ELB-10-150 Compact Electric Diaphragm Pump, Skid
Mounted, Aluminum, 1.5" MNPT Inlet and 1.5" FNPT Discharge
Dirty Drain Xfer Pump
#2
0104-4213
Dirty Drain Offload
Ingersoll-Dresser Model 6GASM1D0 5 hp 1,800rpm 55gpm @ 50 psi
Stbd Oil Processing
Collection Well Xfer
Pump #1
Aux Machinery Room
Pump #2
Pump #3
ST-40084 Oily Water Seperator
Sigma Model S2-8 USCG Approved 115Vac W/Oil Content Meter
8gpm
Fuel Oil System
0104-4329
F.O. Day Tank
Ingersoll-Dresser Model 3GASM1D0 2 hp 1,800 rpm 16 gpm @ 50 psi
4130737 F.O. Purifier #1 Alfa-Laval SU-845 8,400L/hr (36gpm) Auto, Self-Cleaning
4130738 F.O. Purifier #2 Alfa-Laval SU-845 8,400L/hr (36gpm) Auto, Self-Cleaning
Q.06/5025767/2005 F.O. Transfer Pump #1 Allweiler TRILUB440R46W115 Triple Screw Stbd Aft Pump Room
L42353/2 F.O. Transfer Pump #2 Allweiler TRILUB440R40W115 Triple Screw Stbd Aft Pump Room
Q.06/5025766/2005 F.O. Transfer Pump #3 Allweiler TRILUB440R46W115 Triple Screw Port Aft Pump Room
L42353/1 F.O. Transfer Pump #4 Allweiler TRILUB440R40W115 Triple Screw Port Aft Pump Room
Fresh Water Cooling System
02046337B
Jacket Water Xfer
Flowserve Model: 2X1X8T D800 10gpm @ 50ft Head 1 HP
1750rpm
Stbd Engine Room
02046337A
Jacket Water Xfer
Flowserve Model: 2X1X8T D800 10gpm @ 50ft Head 1 HP
Port Engine Room
0304-7395A
Machinery Room
Pump #1A
Carver 5X4X7L-BF Centrifugal 452gpm 150 ft Head 30 HP
Mechanical Seal, Cast Iron/Bronze
0304-7395B
Pump #1B
0304-7395C
Pump #2A
0304-7395D
Pump #2B
0304-7397A
Thruster Cooling
Flowserve 2K4x3V-13RV M3V, 350gpm @ 90 ft Head, 20 HP
0304-7397B
Flowserve 2K4x3V-13RV M3V, 350gpm @ 90 ft Head, 20 HP
0304-7397C
Pump #3
Flowserve 2K4x3V-13RV M3V, 350gpm 90 ft Head, 20 HP 1750rpm
0304-7397D
Pump #4
Flowserve 2K4x3V-13RV M3V, 350gpm 90 ft Head, 20 HP 1750rpm
30107-99456
Mach Room
Exchanger #1
Alfa-Laval M15-BFG Plate Exchanger 500/452gpm 2,343,680
BTU/Hr
30107-99457
Mach Room
Exchanger #2
Alfa-Laval M15-BFG Plate Exchanger 500/452gpm 2,343,680
30107-99465 F.O. Exchanger #1 Alfa-Laval M6-MDFG Plate Exchanger 76/75gpm 300,480 BTU/Hr
30107-99466 F.O. Exchanger #2 Alfa-Laval M6-MDFG Plate Exchanger 76/75gpm 300,480 BTU/Hr
30107-99458
Thruster SW
Exchanger #1
Alfa-Laval M10-BFG Plate Exchanger FW-350gpm 1,090,000
30107-99460
Exchanger #2
30107-99459
Exchanger #3
30107-99461
Exchanger #4
Thrust UGB Exchngr
Wartsila Double-Pass Shell/Tube Exchanger FW-58gpm 288,000
#3
#4
Thrust PGB Exchngr
Wartsila Double-Pass Shell/Tube Exchanger FW-22gpm 108,000
Thrust Hyd Exchanger
Wartsila Double-Pass Shell/Tube Exchanger FW-40gpm 198,000
Thrust Motor
Exchanger #1A
Wartsila (Siemens Motor) Double Tube/Fin FW-176gpm 430,2000
Exchanger #1B
Exchanger #2A
Exchanger #2B
Exchanger #3A
Exchanger #3B
Exchanger #4A
Exchanger #4B
Converter Exchanger
Tranter GL-13PI*24 FW-53gpm 215,000 BTU/Hr
Potable Water System
12501 Water Maker #1
Village Marine PW7000 Reverse Osmosis 7,000 gal/day (@77F Sea
Temp) 480V 3Ph 60 Hz
Watermaker Room
12499 Water Maker #2
12500 Water Maker #3
12512 Pre Filter Skid Village Marine Watermaker Room
12513 Pre Filter Skid Village Marine Watermaker Room
12514 Pre Filter Skid Village Marine Watermaker Room
12528 Post Filtration Skid 4x Model S2400C Ultra Violet Purifiers 4x Guardian UV Moniters Watermaker Room
L.09223/001
Potable Water Pump
Allweiler NB2/32-200 Ø205 U3.1D-W19-ME3-42/350 30 m3/hr 3530 rmp 16.6 kw 100 m head Order# 65993-3/01
L.09223/002
Potable Water Pump
Allweiler NB2/32-200 Ø205 U3.1D-W19-ME3-42/350 30 m3/hr 3530 rmp 16.6 kw 100 m head Order# 65993-3/01
Hot Water Circ Pump
Bell and Gossett, model DVJ 48T17D173BP
Hot Water Circ Pump
Bell and Gossett, model DVJ 48T17D173BP Aux Machinery Room
304112641 Hot Water Heater #1 Durawatt Electric 250 gal Model # 490 P 250A-E 99 kw Aux Machinery Room
304112640 Hot Water Heater #2 Durawatt Electric 250 gal Model # 490 P 250A-E 99 kw Aux Machinery Room
E.R. Water Heater Statesman Model #SSE3091FEASME 30 gal
ER Cleaning Gear
Locker
Diswasher Booster
Heater
Electric 15 kw 208V 1-Phase 60 Hz Galley
Salinity Meter 120V 1-Phase 60 Hz, Tank Salinity Monitor
Stbd Forward Pump
Sea Water Cooling System
254C612
Main SW Cool Pump
Goulds Model # 3410 10X12-17 Variable Speed, 4,500 gpm @ 200 ft head
(Fwd)
254C611
(Aft)
254C604
(Fwd)
254C605
(Aft)
0304-7395A
Thruster Cool Pump
#1A
Flowserve Model: 2K4x3-10HRV M3 ST 400gpm @ 56 ft head 10
HP, 1750rpm
0304-7395B
#1B
0304-7395F
#2A
0304-7395E
#2B
0304-7395C
#3A
0304-7395D
#3B
0304-7395G
#4A
0304-7395H
#4B
Sea Water Service System
0304-7394A
Seawater Svc Pump
Flowserve Model: 2K3x2-10ARV M3 ST 300gpm @ 240ft 40 HP
3550rpm
0304-7394B
Seawater Svc Pump
Flowserve Model: 2K3x2-10ARV M3 ST 300gpm @ 240ft 40 HP
3550rpm
Fire Main
L.09227/001 Main Fire Pump #1
Allweiler MA200-500/02 Ø480 U3.19D-S-W3 500 m3/hr 1785rpm, 231 kw 120m head, Order # 65993-10/01
29.05629/01 Fire/Deluge Pump #1A
Allweiler CNH-B 100-250 G-WX 200 m3/hr 3500 rpm 100.4 kw
119.3 m head Order # 65993-5/01
L.09228/001
Jockey Pump / Fire
Main #1
Allweiler NB2/40-250 Ø179 U3.1D-W3-ME3-55/400 30 m3/hr 3540 rpm 26.4 kw 120 m head Order # 65993-12/01
L.09227/002 Main Fire Pump#2
Allweiler MA200-500/02 Ø480 U3.19D-S-W3 500 m3/hr 1785rpm, 231 kw 120m head, Order # 65993-10/01
Port Forward Pump
29.05629/02 Fire/Deluge Pump #2A
Allweiler CNH-B 100-250 G-WX 200 m3/hr 3500 rpm 100.4 kw
119.3 m head Order # 65993-5/01
L.09228/002
Jockey Pump / Fire
Main #2
Allweiler NB2/40-250 Ø179 U3.1D-W3-ME3-55/400 30 m3/hr 3540 rpm 26.4 kw 120 m head Order # 65993-12/01
Chill Water System
Chill Water Pump #1
Aurora 340/360 5X6X12 Enclosed 12" Impeller Centrifugal 750gpm
@ 145 ft head 40 HP 1750 rpm
Chill Water Room
Chill Water Pump #2
Aurora 340/360 5X6X12 Enclosed 12" Impeller Centrifugal 750gpm
@ 145 ft head 40 HP 1750 rpm
Chill Water Room
1804Q03837 A/C Chiller #1 Carrier Model 30HXS171P-6-KA-MAR, Chill Water Room
1804Q03836 A/C Chiller #2 Carrier Model 30HXS171P-6-KA-MAR Chill Water Room
1804Q03827 A/C Chiller #3 Carrier Model 30HXS136-P-6-KA-MAR Chill Water Room
1804Q03829 A/C Chiller #4 Carrier Model 30HXS136-P-6-KA-MAR Chill Water Room
Air Handlers (X20) Varies: 2.4 Tons to 33.1 Tons Various
Deck Crane
2066 Deck Crane
Allied Marine Crane DTH 300-100/20 100' Boom with 35' Extension
Jib. Main Hoist SWL: 60,000 lbs, Whip Line SWL: 10,000 lbs
Stbd Main Deck
2151 Deck Crane
Allied Marine Crane DTH 300-100/20 100' Boom with 35' Extension
Jib. Main Hoist SWL 60,000, Whip Line SWL: 10,000 lbs
Port Main Deck
Anchor & Mooring System
18830-1 Anchor Windlass #1
Markey type WYS-60-RH Hydraulic Anchor Windlass. Spur Type input gearbox. Sized for 3-3/4" Anchor chain. 340,000lb capacity.
Stbd Forward Deck
18830-2 Anchor Windlass #2
Markey type WYS-60-RH Hydraulic Anchor Windlass. Spur Type input gearbox. Sized for 3-3/4" Anchor chain. 340,000lb capacity.
Port Forward Deck
16952 Chain Stopper #1 Smith Berger Model: CS-60-DP for 3-3/4" Anchor Chain Stbd Forward Deck
16953 Chain Stopper #2 Smith Berger Model: CS-60-DP for 3-3/4" Anchor Chain Port Forward Deck
16872 Fairleader #1 Smith Berger Model: C-462 for 3-3/4" Anchor Chain Stbd Forward Column
16873 Fairleader #2 Smith Berger Model: C-462 for 3-3/4" Anchor Chain Port Forward Column
Lifesaving Equipment
Lifeboat #1 Norsafe GES 40 (50 Person Capacity) With 4 HD-40 Davits Stbd Fwd
Lifeboat #2 Norsafe GES 40 (50 Person Capacity) With 4 HD-40 Davits Port Fwd
Lifeboat #3 Norsafe GES 40 (50 Person Capacity) With 4 HD-40 Davits Stbd Aft
Lifeboat #4 Norsafe GES 40 (50 Person Capacity) With 4 HD-40 Davits Port Aft
Fast Rescue Boat
Norsafe 615 Merlin Fast Rescue Boat (15 person capacity plus room for strathcer) with Single Point Davit
Port Main Deck
Liferafts (x8) Viking 25 Man Deck
Remote Valve Control System
51400538-1
Hydraulic Power Unit
Womack Systems L.C. Model # HN-15299R3-H
Stbd Aft Ballast Mach.
51400538-2
Hydraulic Power Unit
Womack Systems L.C. Model # HN-15299R3-H
Port Aft Ballast Mach.
Water Tight Door #1-
IMS Model 280 Electro-Hydraulic Pontoons
Sewage & MSD System
RCP04053-ME
Sewage Treatment
Unit
ORCA IIA-330 Type II USCG/IMO Certified 10,000 gal/day Aux Machinery Room
G63005
Surge Tank Xfer Pump
Hydromatic Model # PGL200M Aux Machinery Room
G63007
Surge Tank Xfer Pump
Hydromatic Model # PGL200M Aux Machinery Room
Lift Station Xfer Pump
Macerator Type 30gpm @ 50 ft head 3 HP 1,750rpm
Engine Room Sub
Floor
443500
Goulds 2GA31K4DD Submerged Macerator Tye 120gpm @ 50 ft head 7.5 HP 1,750rpm
Accomodations Lift
443530
Goulds 2GA31K4DD Submerged Macerator Tye 120gpm @ 50 ft head 7.5 HP 1,750rpm
Accomodations Lift
Chlorination Unit ORCACLOR Model 588B Electrolytic Chlorination Unit Aux Machinery Room
Glycol Recovery System
0104-55777
Glycol Recovery
2" Husky Air Diaphragm Pump, Model 2150 105 gpm @ 32.5 psi LCCS Space
Ballast System
L.109225/001 Ballast Pump #1
Allweiler MA150-315/01 Ø330 U3.19D-W3-80/660 600 m3/hr 100 kw
1790 RPM 50 M head ORDER# 65993-6/01
Stbd Fwd Emerg
Pump room
L.109225/002 Ballast Pump #2
L.109225/003 Ballast Pump #3
L.109225/004 Ballast Pump #4
Port Fwd Emerg
Pump Room
L.109225/005 Ballast Pump #5
Stbd Aft Emerg Pump
L.109225/006 Ballast Pump #6
L.109225/007 Ballast Pump #7
L.109225/008 Ballast Pump #8
Allweiler MA150-315/01 Ø330 U3.19D-W3-80/660 600 m3/hr 100 kw 1790 RPM 50 M head ORDER# 65993-6/01
Port Aft Emerg Pump
24855
Bilge/Ballast Strip
Ejector #1
MOSS DRAWING 2442-56 thru 61
24856
Ejector#2
24854
Ejector #3
24853
Ejector #4
741640.1 Bilge Pump #1
Goulds Model # 3796 MTX 3x3-13, 176 gpm, 140 ft discharge head,
15.4 HP, 63 gpm.
741640.2 Bilge Pump #2
741640.3 Bilge Pump #3
741640.4 Bilge Pump #4
NO: 7208682/1
Bilge Transfer Pump
Allweiler TECFLOW 101 Q:83 l/min n: 376 l/min @4 bar Stbd Fwd Pump Room
NO: 7208682/4
Allweiler TECFLOW 101 Q:83 l/min n: 376 l/min @4 bar Port Fwd Pump Room
NO: 7208682/2
Allweiler TECFLOW 101 Q:83 l/min n: 376 l/min @4 bar Stbd Aft Pump Room
NO: 7208682/3
Allweiler TECFLOW 101 Q:83 l/min n: 376 l/min @4 bar Port Aft Pump Room
Ventilation Machinery Mod
Fans (X33) Varies: 200 CFM to 45,000 CFM Machinery Rooms
Air Handlers (X2) Varies Machinery Rooms
Fire Dampers
Ventilation Accom Module
Fans (X9) Varies: 400 CFM to 5,000 CFM Accomodations
Air Handlers (X4) Varies Accomodations
Reheaters Various
(X96)
Varies Accomodations
Ventilation Platform
Fans Various (X24) Varies: 200 CFM to 7,400 CFM Varies
Heaters Various (X56) Varies Varies
Column Elevators
B03P1890
Port Personnel
Elevator
Champion Port Aft Column
B03P1889
Stbd Personnel
Elevator
Champion Stbd Aft Column
Refrigeration System
CF04083 Reefer Compressor #1 Carrier Model # 90YR28NSF4NF6K9R Chiller Room
CF04082 Reefer Compressor #2 Carrier Model # 90YR28NSF4NF6K9R Chiller Room
BALLAST & BILGE SYSTEM
6.1 Design Philosophy
The following is a description of the overall design and operational philosophy of the
SBX1 ballast system. This philosophy provides an overview of the application of the
Rules to the SBX1 in accordance with the American Bureau of Shipping, Mobile
Offshore Drilling Units, 2001, Rules for Building and Classing. The SBX1 is a column-stabilized unit and as such, the following regulations were reviewed and applied as applicable.
ABS, Steel Vessels, 200, Rules for Building and Classing.
IMO, Safety of Life at Sea (SOLAS) Consolidated Edition 2001 (as amended by
SOLAS Amendment 2000 IMO)
U.S. Supplement to ABS Rules for Steel Vessels for vessels on International
Voyages, 1 November 1999
U.S. Supplement to ABS Rules for Building and Classing Mobile Offshore Drilling
Units and the 1989 IMO MODU Code Rev. 0,1 November 1998
SBX Platform Modifications, Volume II, Specifications, The Glosten Associates
Inc. 30 June 2003.
The application of these rules is detailed in the series of drawings Moss CS50 2442-058 through 2442-074 and SBX Platform Drawings by Glosten Associates 02100 –320-01, 431-01, 591-01, 593-01.
6.2 Ballast System Description
A detailed drawing of the vessels ballast system drawing # R137-522-02 is located in
Volume II of this manual.
Each pontoon is serviced by an independent system, with a common main running fore and aft. A ballast main isolation valve is provided at midship permitting separation of each quadrant.
With the exception of the upper column tanks (BW 60 P/S, BW62 P/S – one tank per quadrant), ballasting is accomplished by gravity flooding of tanks. Ballasting of the upper column tanks is by powered pumps. Deballasting of all tanks is by powered pumps. In general, one tank per quadrant will be ballasted or deballasted at a time.
Each quadrant is provided with two identical, dedicated ballast pumps. Each pump is located in a separate watertight compartment. Each pump is capable of ballasting the upper column tank and deballasting any tank in its quadrant. By means of opening the ballast main isolation valve, each pump is capable of deballasting any tank in the pontoon under normal conditions.
Ballast tank stripping lines are interconnected between the fwd and aft pontoon pump rooms on both sides of the vessel. Each pump room has a ballast stripping and bilge ejector that is used to remove (residual) water from the various ballast tanks.
The ballast main isolation valve, which connects the forward and after pump rooms is located amidship in the access tunnel.
The cross connection valves between the ballast, bilge and ejector system are located in each pump room.
See Moss Maritime drawings No. 2442-058, 059, 060 and 061 for piping arrangement.
These drawings are located in Volume II of this manual.
6.3 Ballast System REQUIRED Operation
As per ABS Mobile Offshore Drilling Units, 2001 Rules for B & C Attachment 1 demonstrates compliance with Reference 1, 4-2-3/13/1 requirement for minimum deballasting time.
Attachment 2 illustrates compliance with Reference 1, 4-2-3/13.1 requirement for operations under conditions listed in 3-3-1/1.32(a) with any one pump inoperable and 3-
3-1/1.3.2(b). A summary of this analysis is as follows:
Loss of a Single Compartment – System Functional. There are two pumps per quadrant, of which only one is required to meet the above requirements.
Each is located in a separate watertight compartment. Controls and power supplies to each are diversely located and independent.
Flooding/damage Worst Case – System Functional. With any one pump inoperable the system remains functional under the above-specified conditions.
The following, details these considerations:
o Pump Impellers Remain Flooded. In order for pumps to gain suction, they require flooded suctions. As per Attachment 2, Transit Case I presents the worst condition. As per Attachment 2, pump impellers remain flooded.
o Pump Suction Head Available – Satisfactory When Ballasting. In order for the system to remain fully operational, a minimum net positive suction head required must be available to the pump. In this case the pump is drawing suction from the sea. As per Attachment 2, Transit Case I presents the worst condition. As per Attachment 2, the required pump suction head is available.
o Pump Suction Head Available – Satisfactory When Deballasting. In order for the system to remain fully operational, a minimum net positive suction head required must be available to the pump. As per Attachment 2, Transit
Case I presents the worst condition. In this case, the pump in the aft pump room needs to dewater the aft most ballast tank. In this case, the pump is considerable higher than the bottom of the ballast tank. Attachment 2 illustrates the head difference, as well as the head required, and the resulting available head. As per Attachment 2, the required pump suction head is available.
6.4 Ballast Electrical and Control System
Of each pair of ballast pumps in a given quadrant, one is powered from one of the main switchboards, and one is powered off the emergency switchboard.
6.4.1 Control System
All components of the control system are powered on a distribution system from a single uninterruptible power supply (UPS), located in the computer/network room, which is above the damage waterline. This UPS is powered from the emergency switchboard, which has more than one source.
The ballast system will normally be operated at the centralized control station (IMAC) on the navigation bridge. Also, ballast operations can be controlled at any one of the independent (IMAC) local control stations. In the event of IMAC failure ballast control can be accomplished at the remote ballast machinery rooms (BMR) located at the top of the columns in each quadrant.
6.4.2 Centralized Control Station
The centralized control station (CCS) is serviced by the vessel machinery control and monitoring (IMAC) system. The portions of the system, which serve the ballast functions, have safety features and independency in accordance with ABS Rules.
The CCS is served by redundant operator workstations, each capable of serving all system functions. The sensors in the system are described in the Section 7.4.4 below.
The topology which shows the connection of the RIOs to the CCS is detailed in Drawing
02100-431-01 by the Glosten Associates, Inc.
This is the start of the file's text. The full file is on GovTribe.