Q A__4_SBX-1_RFP_16R3101.pdf

PDF 23 KB Posted

Attached to
Sea-Based X-Band Radar (SBX-1) Operation & Maintenance
Solicitation number
N32205-16-R-3101
Issued by

About this file

Questions Answers 4

View the file

Other files

File Type Posted
Q_AND_A__8.pdf PDF
N32205-16-R-3101_Conformed_thru_Amend_0003.doc DOC document
Forms_A-D_SBX-1_Rev3.xlsx XLSX spreadsheet
N32205-16-R-3101_Amend_0003.doc DOC document
Q_AND_A__7.pdf PDF
Attachment_M_SBX-1_Operations_Manual_Vol_I.pdf PDF
Attachment_A_SBX-1_Tech_Manual_Rev1.pdf PDF
ATTACHMENT_C_DD254_Rev1.pdf PDF
N32205-16-R-3101_Conformed_thru_Amend_0002.doc DOC document
N32205-16-R-3101_Amend_0002.doc DOC document
Forms_A-D_SBX-1_Rev2.xlsx XLSX spreadsheet
Q_AND_A__6.pdf PDF
Q_AND_A__5.pdf PDF
Forms_A-D_SBX-1_Rev1.xlsx XLSX spreadsheet
Attachment_B-2_WD_CBA-2015-8287.pdf PDF
Attachment_B-1_WD_CBA-2010-3962_Rev2.pdf PDF
QA__3_SBX_RFP_16R3101_FBO.pdf PDF
QA2_SBX_RFP_16R3101.pdf PDF
QA1_SBX_RFP_16R3101.pdf PDF
Attachment_H_OVERSIGHT_AND_METRICS.pdf PDF
Attachment_G_-_SF_LLL.pdf PDF
Attachment_B_WD_CBA-2015-8287.pdf PDF
Attachment_E_Hull_Clauses.pdf PDF
ATTACHMENT_I_Inv_Requirements.pdf PDF
Forms_A-D_SBX-1.xlsx XLSX spreadsheet
Attachment_B_WD_CBA-2010-3962_Rev2.pdf PDF
ATTACHMENT_C_DD254.pdf PDF
N32205-16-R-3101.doc DOC document
ATTACHMENT_F_GFP.pdf PDF
Attachment_A_SBX-1_Tech_Manual.pdf PDF
Attachment_J_-_MECSP_Worksheet.doc DOC document
Attachment_K_Past_Performance_Narrative.docx DOCX document
Attachment_L_Award-Fee_Plan_SBX-1.pdf PDF
ATTACHMENT_D_P I_Guidelines.pdf PDF
N32205-16-R-3101_SBX_Draft_RFP_040616.pdf PDF
SBX1_Sections_L M_Draft.pdf PDF
16R3101Draft_PWS_FBO.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-R-3101 SBX-1 Operation & Maintenance

QUESTIONS AND ANSWERS # 4

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

1. On page 163 of the RFP, both (j) Budget and Financial Management and (n) Offeror shall indicate whether or not it currently has Government-approved purchasing/accounting system(s). Seems redundant. Do you want us to list same information in both places?

Answer: Paragraph L-8 (A)(n) was deleted in its entirety and marketed RESERVED in solicitation amendment 0001, which was posted to FEDBIZOPPS on 06 MAY 2016.

2. On page 164 C. Small Business Participation Proposal of the RFP, the following note: THIS FACTOR

IS DISTINCT FROM THE SMALL BUSINESS SUBCONTRACTING PLAN AND IS REQUIRED OF

ALL OFFERORS REGARDLESS OF SIZE STATUS. However, I do not see a section where they want us to provide a small business subcontracting plan. Do we just insert this plan in this section?

Answer: The Small Business Subcontracting Plan requirement and associated clauses were added to solicitation in amendment 0001. Subcontracting plans are not required from small business concerns.

3. Can we expect the CBAs soon? If not, will the date to accept proposal be extended?

Answer: Revised CBA’s were included in amendment 0001.

4. H.5 (a) INSURANCE

While this is a normal cover within the P & I entry for a normal cargo carrying vessel, we are required to advise the P&I Club what the exposure is. We certainly do not think SBX- 1 is carrying "cargo" from A to B for third parties and issuing Bills of Lading etc. Further, we note equipment on board is not deemed as cargo and would fall outside Club cover where it is owned by or leased by an assured or joint assured.

Please advise:

A. What contracts of carriage are issued?

B. How would package limitation under COGSA be assessed - Weight or Package?

C. Assuming cargo coverage can be provided within Club Rules, what is the deemed inventory of Cargo and respective values?

D. Are any of the items containerized?

E. Does the U.S. Government own said items?

Answer: This question has been previously answered. See Q&A #2, Question 1 answer.

5. C.1.4.8 MEDICAL SUPPLIES

Is the supply of medical supplies consumed (or expired) during the course of the contract reimbursable, provided the total quantity on board doesn't exceed twice the AMAL?

Answer: The question has been previously answered. See Q&A #2, Question 23 answer.

6. C 1.6.2 CREW VENDOR & TRANSIENT VETTING. This item discusses requirements for crew members and shore-side staff but doesn't discuss venues and transients. Please clarify.

Answer: Per section C-1.6.2 "All personnel shall be resubmitted and re-screened upon a change in contract or contractor, and at least once in each 12-month period a similar procedure shall be followed for all other Contractor personnel for whom unescorted access to the vessel is required." - this covers vendors and transients. This answer will be incorporated into the section C-1.6.2 in a forthcoming solicitation amendment.

7. C 1.7.2 Shipboard Personnel. SECRET Security Clearances required prior to assignment - all Deck Officers, Boatswain, Able Bodied and Ordinary Seamen, the Chief Engineer and Frist Assistant Engineer.

C1.7.8 Key Shipboard Personnel. This item indicates that the MDR and the Independent Storekeeper are Key Shipboard Personnel and includes a statement that all shipboard personnel are required to hold a SECRET Security clearance prior to assignment. Please clarify who needs to have a SECRET Security Clearance and when.

Answer: All shipboard personnel are required to hold a SECRET Security clearance prior to assignment per C1.7.8. Section C-1.7.2 will be amended in a forthcoming solicitation to state "All Crewmembers may come into contact with sensitive information in the course of their duties, such as voyage planning, navigation and ship's position and are therefore required to hold a SECRET security clearance prior to assignment, regardless of vessel status (FOS or

ROS).”

8. C1.8.11 Anti-Terrorism Officer (ATO). ATO shall have successfully completed MSC's Anti- Terrorism Course within the last five (3) years. Is this a 5 year or a 3 year requirement?

Answer: Section C1.8.11 will be modified in a forthcoming solicitation amendment to state "MSC's Anti-Terrorism Course within the last three (3) years". The periodicity is in accordance with COMSCINST 5530.3 (series).

9. C1.8.9 High Voltage Electrical Safety. This specific training requirements list the course as a Calhoun/MEBA course. Please confirm that alternate courses will be acceptable.

Answer: The question has been previously answered. See Q&A #2, Question 33.

10. In the second to last sentence of Section C - 2.7 SHIPYARD AVAILABILITY PROCUREMENT, MANAGEMENT, AND CLOSEOUT the RFP references section C - 4.3 Directly Funded Items. Later in Section C - 4 BUDGET AND FINANCIAL MANAGEMENT, this same reference is noted again for submission of annual O&M budgets. Sections C - 4.2.2.1 Annual O&M Budget Format, as well as C -

4.2.2.3 Accompanying Narrative, require the contractor to provide budget detail for each of the items listed in section C - 4.3.1 Section C - 4.3 is listed as "RESERVED" in the current RFP.

Answer: The reference to C-4.3 within section C-2.7 will be changed to C-4.2.3 List of Annual O&M Budget Items in a forthcoming solicitation amendment.

11. Kindly request that MSC review the government provided answer to Question 47 included as part of "SBX-1 QUESTIONS AND ANSWERS # 2". The response of "Answer: See answer to question 5 above" does not appear to answer the question.

Answer: The answer to Q&A #2, Question 47 incorrectly references question 5. The answer for Q&A #2, Question 47 should say, “See answer to Q&A #2, question 51 below.”

12. We have reviewed the DD 254 and contract information from the subject RFP and can’t see anything that would indicate that the contractor employees would need to have access to “Restricted Data” (item 10b) or “TEMPEST” (item 11i) requirements as reflected on the DD 254. Please clarify these requirements.

Answer: TEMPEST (item 11i), and Restricted Data (item 10b), will not be requirements of the SBX-1 DD254. The DD254 will be revised in a forthcoming solicitation amendment to reflect this answer.

File details come from the government source that posted it. Updated .