SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION / CONTRACT FORM
The required response date/time has changed from 07-Aug-2015 02:00 PM to 14-Aug-2015 02:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0009 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 112- No. 1 Ballast Tank |
FFP
N0. 1 Ballast Tank Steel Repairs.
1.1 This work item describes the requirements to accomplish steel repairs in the No. 1 Forward Ballast Tank.
FOB: Destination
NET AMT
The following have been modified:
SUMMARY OF CHANGES
A. The following New Work Items are hereby added to this Solicitation:
FUEL SETTLE TANKS REPAIRS AND VALVES REPLACEMENS
A
(VR15-063)-
ADG ENGINE MOUNTS REPLACEMENTS (VR15-045) - NEW
A
CHT & FIRE MAIN PIPING REPLACEMENTS,
(VR14-155, V15-042, 061, 050) – Pictures are attached for reference
U/W HULL PRESERVATION
A
B. The following Work Item 0303 “ENGINE ROOM SWITCHBOARD REPAIR (VRR14-072) “ is hereby cancelled in its entirety. A Revised J-2 is attached for pricing of all new work items and the cancellation of Work Item 0303.
C. Work Item 0112 “No. 1 Ballast Tank Forward Steel Repairs” is hereby changed from a Category “A” work item to a Category “B” work item and is reflected on the Revised J-3 for pricing.
D. The adobe document listing Tank Capacity Tables is attached to assist in steel repair work items.
E. Request for Specification Clarirications:
1. SPECIFICATION ITEM NO.: SF-33 Solicitation Section A, (page 1)
PARAGRAPH / SECTION NO: Section 9
TITLE: BID PROPOSAL SUBMISSION DATE
QUESTION:
Amendment 0005 was released on the afternoon of 7/24/15 which added more workscope for any offeror and altered several other work items that will require new subcontractor quotes and/or additional pricing revisions. The offeror respectfully requests a one (1) week extension to the bid due date (from Aug. 7, 2015 to Aug. 14, 2015) in order to solicit, receive and review prices from subcontractors and integrate these into its proposal.
ANSWER:
In response to the request above, the deadline for all Request For Clarifications (RFC) is hereby extended to 7 August 2015, 2:00 PM (Eastern Time).
In response to a request for an extension of the deadline for submission of proposals in response to Solicitation N32205-15-R-5000, the USNS MERCY (T-AH 19) ROH/DD, the new closing date is 14 August 2015, 2:00 PM (Eastern Time).
2. SPECIFICATION ITEM NO.: 101
PARAGRAPH / SECTION NO: All
TITLE: STEEL REPAIR IN AND AROUND SERVICE ARE NUMBER 4
QUESTION:
During a ship check of this work item, it was noted that there is approximately 400 feet of 4” potable water piping in way of the steel repairs that will require removal, installation, testing, and chlorination.
It was also noted that a side shell access will be required into the anti-roll tank, and one (1)in the swash bhd of the anti-roll tank for steel removal/installation (both 6’x12’).
Please advise if the offeror should include this effort.
ANSWER:
See the revised Work Item 0112, reflected as a Category “B” work item for amount and weights of steel to be replaced under 7.1.
3. SPECIFICATION ITEM NO.: 304
PARAGRAPH / SECTION NO: 3.2 & 7.0
TITLE: FUEL OIL, CHT, FEED AND POTABLE WATER TANKS TLI INSTALLATION
QUESTION:
The offeror request that all TLI “Tank Level Indicator” material required to accomplish work item 0304, be provided by the Government as “GFM”. The offeror requests this change due to the Long Lead Time of 8 weeks – 10 weeks for materials and equipment.
ANSWER:
The offeror who is awarded this contract will be required by the work item to send a panel back to the OEM to be modified and during this time, an offer could be building and installing the foundations for all the I/O panels – during the first part of the Regular Overhaul (ROH). The offeror will need to run wire from each TLI to the I/O panels, allowing for additional time to the offeror to obtain the materials and complete the foundations as annotated above. The materials will remain annotated as Contractor Furnished Material (CFM).
F. All other terms and conditions remain in full force and effect.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
ROH/DD WORK ITEM INDEX
USNS MERCY (T-AH 19)
ITEM
DESCRIPTION CATEGORY
SECTION 000
GENERAL
INTENT, SCOPE, GEN REQUIREMENTS, DEFINITIONS
N
TECHNICAL REPRESENTATIVES
N
APPROACH, BERTH AND MOORING
N
TESTING AND QUALITY ASSURANCE
N
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
N
HEAVY WEATHER PLAN
N
COLD WEATHER PLAN
N
FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)
A
GENERAL SERVICES FOR SHIP (T-AH) - REVISION A
A
TELEPHONE SERVICES
A
PROJECT PLANNING AND PRODUCTION STATUS MONITORING
REPORTS
A
PREPARATION OF WEIGHT AND MOMENT REPORT
A
INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
A
FIRE PROTECTION AND SHIPS SAFETY PROGRAM
A
HANDLING SHIPS STORES
A
DELIVERY AND REDELIVERY OF THE VESSEL
A
SHIPBOARD ACCESS AND SECURITY
A
GAS FREE CERTIFICATES
CLEAN & GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES - A REVISION A
DOCK TRIALS AND SEA TRIALS
A
HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY
A
PHYSICAL SECURITY OF VESSEL
physical security AT PRIVATE CONTRACTOR’S FACILITY B
CONTINUATION OF SERVICES
B
FURNISH OFFICE FOR SMT
B
SECTION 100
HULL, STRUCTURE
STEEL REPAIR IN AND AROUND SERVICE AREA NUMBER 4
A
AC FLAT STEEL REPAIRS
A
SERVICE AREA NUMBER 2 STEEL REPAIRS
A
UT GAUGING
B
WATERTIGHT DOOR REPAIRS (VRR14-093) - REVISION A
A
MOORING ROLLER REPAIRS (VRR14-045)
A
WEATHERDECK VENT CLOSURE REPAIRS
A
FLIGHT DECK RESURFACING
A
AFT PEAK TANK STEEL REPAIRS
A
110 MISCELLANEOUS STEEL REPLACEMENT
B
SERVICE AREA 5 STEEL REPAIRS
A
NO 1 BALLAST TANK FORWARD STEEL REPAIRS
B
– Revision A
CHT, EFFLUENT AND SURGE TANKS COATING - REVISION A
A
SECTION 200
MACHINERY, PROPULSION
MAIN CIRCULATING PUMP AND MOTOR REPLACEMENT
(VRR14-051)
AUTOMATION SYSTEM GROOM - REVISION A
A
FUEL SETTLE TANKS REPAIRS AND VALVES REPLACEMENS
(VR15-063)- NEW Work Item
SECTION 300
ELECTRICAL
SWITCHBOARD AND GROUP CONTROL CENTER CLEANING
A
TURNING GEAR MOTOR OVERHAUL (VRR15-015)
A
CNX
FUEL OIL, CHT, FEED, AND POTABLE WATER TANK TLI
INSTALL (T-AH-009R & VRR14-099)
SECTION 400
COMMUNICATION AND NAVIGATIONAL AIDS
ANNUAL GMDSS, S-VDR, SASS, AND LRIT SYSTEMS RECERT
ANNUAL RADAR AND ECDIS PREVENTIVE MAINTENANCE
A
NAVMACS UPGRADE SYSTEM SUPPORT
A
SECTION 500
MACHINERY, AUXILIARIES SYSTEMS
SEWAGE PIPING MODIFICATION (T-AH 440 & VRR15-012)
A
FEED PUMP VALVE REPAIRS
A
FIRE/FLUSHING PUMP PIPING MODIFICATION (T-AH 14-043R)
A
OILY WATER SEPARATOR REPLACEMENT
(T-AH 450 & VRR15-011)
OVERHAUL AND SET RELIEF VALVES (VRR15-005)
A
ADG EXHAUST GASKETS AND INSULATION REPAIRS (VRR15-14)
A
PRESSURE & TEMPERATURE GAUGE CALIBRATION (VRR15-018)
A
EDG MAINTENANCE - REVISION A
A
BALLAST PUMP OVERHAUL
A
NOT USED
A
FOREPEAK AND BALLAST TANK NO.1 EDUCATOR PIPING
REPLACEMENT
ADG ENGINE MOUNTS REPLACEMENTS (VR15-045) – NEW Work
Item CHT & FIRE MAIN PIPING REPLACEMENTS – NEW Work Item
(VR14-155, V15-042, 061, 050)
SECTION 600
OUTFITTING, FURNISHINGS AND HABITABILITY
ANNUAL FIRE FIGHTING SYSTEMS INSPECTION
A
ANNUAL SELF-CONTAINED BREATHING APPARATUS INSPECTION
A
SERVICING SCBA COMPRESSOR REFILL STATION
A
NOT USED
ANNUAL ELEVATORS RECERTIFICATION
A
ANNUAL DAVITS INSPECTIONS
ANNUAL CRANES INSPECTIONS (VRR14-019) - REVISION A
A
ANNUAL TENDER AND LIFEBOAT INSPECTIONS
ANNUAL RESCUE BOATS INSPECTION
A
ANNUAL PICKET BOAT INSPECTION
A
ANNUAL UTILITY BOAT INSPECTION
A
SECTION 800
HEATING, VENTILATION, AND AIR CONDITIONING
500 TON AC PLANT 30,000 HOUR MAINTENANCE (VRR14-094)
A
SECTION 900
DRYDOCKING
DOCKING AND UNDOCKING- REVISION A
A
REPLACE GATE VALVES AND TRANSDUCERS ON FATHOMETER
AND SPEED LOG (VRR15-13)
U/W HULL PRESERVATION – NEW Work Item A
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0009:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
SECTION F - DELIVERY AND PERFORMANCE
The following Delivery Schedule item has been added to CLIN 0009:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
POP 16-NOV-2015 TO
29-JAN-2016
| N/A |
| N/A |
FOB: Destination
SECTION J - LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
The following have been modified:
Section J - List of Documents, Exhibits & Other Attachments
CLAUSES INCORPORATED BY FULL TEXT
The following documents, exhibits, and other attachments that will form a part of this contract are as follows:
ATTACHMENT
NUMBER
TITLE/DESCRIPTION
NO. OF PAGES
J-1 Work Item Package (Specifications)
Separate Attachment
J-2 Contractor Price Breakdown - Category A Items
3 – Revison A
J-3 Contractor Price Breakdown - Category B Items
1 – Revision A
J-4 Government Furnished Material List
J-5 Incorporated Subcontracting Plan
J-6 Contract Data Requirements List (CDRL) WI 015
Separate Zip File
J-7 MSC Ship Repair Facility Survey
J-8 Request for Specification Clarification
J-9 Disclosure of Lobbying Activities (SF-LLL)
J-10 Interport Differential
J-11 MSC Dry Dock Evaluation Form
J-12 Past Performance Data Sheet
J-13 Past Performance Questionnaire
J-14 Technical Non- Disclosure Agreement
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
The following have been modified:
L-3
SPECIFICATION CLARIFICATION
Offerors may use the Request for Specification Clarification, provided in Section J-8, to request clarification of any work item specification or contract term. No verbal requests for information will be accepted by the Contracting Officer or his technical representative. Offeror's questions must be submitted to the Contracting Officer in writing. All requests for specification clarification must be received by MSC Norfolk no later than 2:00 p.m. (Eastern Time) on 07 August 2015.
(End of Summary of Changes)