WI 607 - Revision A
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS MERCY
(T-AH 19)
OUTFITTING, FURNISHINGS AND HABITABILITY
N32205-15-R-5000 April 28, 2015
ITEM NO. 607
CATEGORY “A” MSC/STOEGBAUER
ADD 1
ANNUAL CRANES INSPECTION
1.0 ABSTRACT
1.1 Provide services of qualified contractor specialized in general marine repairs to accomplish the annual inspections, repairs and testing of seven (07) ALLIED Systems cranes.
2.0 REFERENCES/ENCLOSURES
2.1 References:
2.1.1
ALLIED DC8600CTS RESCUE BOAT CRANE MANUAL
2.1.2
ALLIED D8800FCTS PICKET BOAT CRANE MANUAL
2.1.3
ALLIED TB35-40 UTILITY BOAT CRANE MANUAL
2.1.4
ALLIED TB30-35 SHIP STORES CRANE MANUAL
2.1.5 RESCUE BOAT CRANE WEIGHT TEST MEMO MERCY
2.1.6 ABS GUIDE FOR CERTIFICATION OF LIFTING
APPLIANCES 2014
2.2 Enclosures:
2.2.1 Rocking Tests (Slew Bearing Installation and Tilt Clearance Check Guidelines)
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity:
3.1.1
RESCUE BOAT CRANE
PORT/STBD 01 LVL FR 76/82 (2)
3.1.2
PICKET BOAT CRANE STBD 01 LVL FR 87 (1)
3.1.3
UTILITY BOAT CRANE PORT/STBD MAIN DECK FR 102 (2)
3.1.4
SHIP STORES CRANE PORT/STBD 04 LVL FR 41 (2)
3.2 Item Description/Manufacturer’s Data:
3.2.1
RESCUE BOAT CRANES/ ALLIED DC8600CTS
3.2.2
PICKET BOAT CRANE/ ALLIED D8800FCTS
3.2.3
UTILITY BOAT CRANES/ ALLIED TB35-40
3.2.4
SHIP STORES CRANES/ ALLIED TB30-35
3.3 Bill of Materials/Contractor Furnished:
3.3.1 30 gal of MobilArma 798 cable grease
NOTE: Quantities are considered estimates. The Contractor shall provide the exact quantities and additional material which are not included in the List of Materials, in order complete the requirements of this work item.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES
4.1 All lubricants will be provided as GFM.
4.2 Paint listed in Para 7.10 will be provided as GFM
5.0 NOTES
5.1 The contractor and all subcontractors, regardless
of tier must consult the General Technical
Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.
5.2 The contractor and all subcontractors, regardless of
tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item
001.
6.0 QUALITY ASSURANCE REQUIREMENTS
6.1 All inspections and repair work shall meet the requirements of SOLAS, ABS Guide for Certification of Lifting Appliances, 46 CFR 199 and applicable sub-parts, as well as USCG NVIC2-92 and 4-07, and manufacturer’s instructions and shall be to the satisfaction of the Inspector.
6.2 The contractor shall successfully perform preliminary tests and inspections to within manufacturer’s design parameters in the presence of the manufacturer's representative, contractor’s representative, Chief Engineer, MSCREP for all regulatory required test and inspections.
6.3 The final tests and inspections shall be performed in the presence and to the satisfaction of the manufacturer's representative, contractor’s representative, Chief Engineer, MSCREP, ABS Surveyor and USCG Inspector, as applicable.
6.4 Notify the MSCREP, USCG Inspector and the ABS Surveyor 48 hours prior to the scheduled regulatory tests and inspections.
7.0 STATEMENT OF WORK REQUIRED
7.1 Provide the services of an Allied Systems manufacturer/Benchmark Industrial Services representative to service the seven (07) ships Allied Systems cranes.
7.2 Contractor shall provide all labor, material, equipment, rigging, staging and tools to accomplish inspections, tests, service and repairs. The contractor shall remove and replace all interferences necessary to accomplish this work item. All material and procedures to be used during this work shall conform to Allied Systems Company, Inc. specifications.
7.3 Contractor shall work with ship’s force to lock-out/tag-out the davits and winch motors identified in 3.1. Upon completion of this work item restore systems to full operation.
7.4 Perform all work on the cranes and davits listed in paragraph 3.1:
7.4.1 Replace all defective grease fittings. Clear and grease all crane gear components. For items to be disassembled and inspected, grease passages shall be flushed with solvent and proven free flowing prior to reassembly.
7.4.2 All winch cables for cranes shall be pressure slushed at the completion of all tests and inspections, use grease Mobilarma 798 (CFM).
7.4.3 Accomplish the requirements for ABS annual survey of cranes per reference ABS Guide for Certification of Lifting Gear, Chapter 2, Section 7. The Annual Survey includes the following:
7.4.3.1 Visual inspection of the crane structure for deformation, excessive wear, corrosion, damage or fractures, as necessary. The boom is to be lowered for this examination.
7.4.3.2 Visual examination of crane hooks for deformation, excessive wear or fractures.
7.4.3.3 Conduct a full operational test using normal and emergency launch/lowering and recovery procedures and controls. Conduct a visual external examination of crane machinery including prime mover, clutches, brakes, hoisting, slewing, luffing machinery.
7.4.3.4 Visual inspection of wire rope including end attachments.
NOTE: The Wire rope is not to be used if in any length of ten diameters: 1) The total number of visible broken wires exceeds 5 percent of the total number of wires, 2) If there is more than one broken wire immediately adjacent to an end fitting, 3) If the broken wires are concentrated in one area or one strand, or 4) If the rope shows signs of excessive wear, corrosion, flattening, kinks, separation of the strands or wires, core failures or other defect which renders it unfit for use.
7.4.3.5 The slewing ring assembly, where applicable, is to be examined for slack bolts, damaged bearings and deformation or fractured weldments. Rocking Tests, in accordance with the bearing manufacturer’s instructions, are to be taken and recorded for review by the attending surveyor at each annual survey.
7.4.3.6 Retesting Survey- ABS surveyor is to witness Rocking Test and a bearing grease sample is to be analyzed (chemically).
7.4.3.6.1 Assume the Cranes to be 5 to 10 years old – Surveyor is to witness the requirements of above plus 10 percent of the slew ring bearing bolts are to be removed and nondestructively tested. Upon completion re-install as per tech rep direction.
7.4.3.7 Functional tests including main and auxiliary load hoisting and lowering, boom raising and lowering, slewing (swinging), safety protective (fail-safe) and limiting devices and load and boom angle or radius indicators.
7.4.4 At the completion of operational testing, survey
shall include an examination for slack bolts, damaged bearings and deformation or fractured weldments.
7.5 Accomplish the maintenance requirements in Allied Marine Crane Technical Manuals 2.2.2 through 2.2.5 paragraph 4.3.3 Service Instructions on the cranes and davits in paragraph 3.1. Maintenance requirements are to include but not limited to the following:
· Swing Bearing
· Pinions and Ring Gear
· Swing Drive
· Lift Cylinder
· Winch
· Wire Rope
· Sheaves, Pins and Bearings
· Hook Block/Lifting Eye
· Hydraulic Tank
· Hydraulic Tank Breather
· Hydraulic Filter
· Crane (and Davit) Assembly
· Boom Pivot Bearings
· Extension Cylinder
· Accumulators
· Starter Box
· Anti-2-Block
· Hydraulic Lines and Fittings
· Fasteners/Mounting Bolts
· Load Indicator
NOTE: Do not disassemble winch
7.5.1 All lubricants will be provided as GFM except cable grease MobilArma 798 to be CFM.
7.6 The contractor shall provide a report of all conditions found and any discrepancies noted. Additional repairs, if authorized, will be covered by a change order to this work item.
7.7 Reassemble using new gaskets and CRES fasteners.
7.8 Disposition all used materials to the ILS Representative or
MSCREP.
7.9 Adjust and make minor repairs, adjustments and calibrations as necessary to make all cranes operate in accordance with OEM technical manuals.
7.10 Mechanically clean and paint all new and disturbed areas, color to match existing. Apply one spot of Ameron 240 to achieve 6 mils dft to all mechanically cleaned areas. Apply one full coat of Ameron 240 to achieve 6 mils dft to all spot coated areas.
7.11 Demonstrate satisfactory operation of all davits and winches to MSCREP, ABS Surveyor and USCG Inspector.
7.12 Reports.
7.12.1 Upon completion the contractor shall provide the MSCREP three (03) typed copies and one electronic copy of the service report.
7.12.2 The report shall describe in detail the scope and results of the inspection and a statement confirming that the arrangements remain fit for purpose should be issued by the manufacturer's representative or by the person certified by the manufacturer for the work.
7.12.3 The report shall be endorsed by contractor’s representative, MSCREP, ABS Surveyor and USCG inspector.
7.13 Manufacturer's Representative
7.13.1 Provide the services of a Marine Crane Technical Representative to accomplish the work described in this specification. Sources, information is given below:
Benchmark Industrial Services
808 N River Street
Portland, OR 97227
POC: Dan Molyneux
Phone: 503-860-7129
Benchmark-industrial.com
ALLIED SYSTEMS COMPANY (OEM)
21433 SW Oregon Street Sherwood, OR 97140
POC:
Adam Quint
Phone:
503-625-2560;
Fax:
503-625-7980
Email:
Adam.Quint@AlliedSystems.com service@alliedsystems.com
8.0 GENERAL REQUIREMENTS None