N32205-15-R-5000-P0005.doc
DOC document 52 KB Posted
- Attached to
- USNS MERCY (T-AH 19) ROH/DD Federal contract opportunity
- Solicitation number
- N32205-15-R-5000
About this file
Amendment 0005 for Solicitation N32205-15-R-5000
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from USNS MERCY (T-AH 19) Category "A" Work Items Prepare for and accomplish the Regular Overhaul/Dry-Docking Availability of the USNS MERCY (T-AH 19)Total Category "A" Items
Proposed Hazardous Waste handling fee rate inaccordance with Work Item 023 ______% Proposed unit price per KWh $_____ in accordance with Work Item 011, 7.1.1.4 Proposed unit price per gallon of potable water $_______ in accordance with Work Item 011, 7.1.3.2 Proposed unit price per gallon of distilled water $_______ in accordance with Work Item 011, 7.1.4.2 Proposed unit price per gallon of bilge water $__________in accordane with Work Item 011, 7.1.20.3 Proposed unit price per crane usage WI 11 $_________________ in accordance with Work Item 011, Refer to sub-paragraph 7.9.1 - "400 Crane Lifts".
The following have been modified:
SUMMARY OF CHANGES
1. The attached work items have been revised for USNS MERCY (T-AH 19) Regular Overhaul/Dry-Docking (ROH/DD) scheduled for 16 November 2015 through 29 January 2016.
2. Listed below are the revised work items:
a. WI 0011 - GENERAL SERVICES FOR SHIP (T-AH) – Revision A
b. WI 0021 - CLEAN & GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES – Revision A
c. WI 0103 - WATERTIGHT DOOR REPAIRS (VRR14-093) – Revision A
d. WI 0115 - CHT, EFFLUENT AND SURGE TANKS COATING- Revision A
e. WI 0202 - AUTOMATION SYSTEM GROOM – Revision A
f. WI 0508 - EDG MAINTENANCE – Revision A
g. WI 0607 - ANNUAL CRANES INSPECTIONS (VRR14-019)- Revision A
h. WI 0901 - DOCKING AND UNDOCKING – Revision A
3. All other terms and conditions remain in full force and effect.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
SECTION 000
GENERAL
INTENT, SCOPE, GEN REQUIREMENTS, DEFINITIONS
N
TECHNICAL REPRESENTATIVES
N
APPROACH, BERTH AND MOORING
N
TESTING AND QUALITY ASSURANCE
N
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
N
HEAVY WEATHER PLAN
N
COLD WEATHER PLAN
N
FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)
A GENERAL SERVICES FOR SHIP (T-AH) – Revision A A
TELEPHONE SERVICES
A
PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
A
PREPARATION OF WEIGHT AND MOMENT REPORT
A
INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
A
FIRE PROTECTION AND SHIPS SAFETY PROGRAM
A
HANDLING SHIPS STORES
A
DELIVERY AND REDELIVERY OF THE VESSEL
A
SHIPBOARD ACCESS AND SECURITY
A
GAS FREE CERTIFICATES
A
CLEAN & GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES– Revision A A
DOCK TRIALS AND SEA TRIALS
A
HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY
PHYSICAL SECURITY OF VESSEL
A physical security AT PRIVATE CONTRACTOR’S FACILITY
B
CONTINUATION OF SERVICES
B
FURNISH OFFICE FOR SMT
A
SECTION 100
HULL, STRUCTURE
STEEL REPAIR IN AND AROUND SERVICE AREA NUMBER 4
A
AC FLAT STEEL REPAIRS
A
SERVICE AREA NUMBER 2 STEEL REPAIRS
A
UT GAUGING
B
WATERTIGHT DOOR REPAIRS (VRR14-093) – Revision A A
MOORING ROLLER REPAIRS (VRR14-045)
A
WEATHERDECK VENT CLOSURE REPAIRS
A
FLIGHT DECK RESURFACING
A
AFT PEAK TANK STEEL REPAIRS
A
110 MISCELLANEOUS STEEL REPLACEMENT
B
SERVICE AREA 5 STEEL REPAIRS
A
NO 1 BALLAST TANK FORWARD STEEL REPAIRS
A
CHT, EFFLUENT AND SURGE TANKS COATING – Revision A A
SECTION 200
MACHINERY, PROPULSION
MAIN CIRCULATING PUMP AND MOTOR REPLACEMENT (VRR14-051) A
AUTOMATION SYSTEM GROOM– Revision A
SECTION 300
ELECTRICAL
SWITCHBOARD AND GROUP CONTROL CENTER CLEANING
A
TURNING GEAR MOTOR OVERHAUL (VRR15-015)
A
ENGINE ROOM SWITCHBOARD REPAIR (VRR14-072)
A
FUEL OIL, CHT, FEED, AND POTABLE WATER TANK TLI INSTALL
(T-AH-009R & VRR14-099)
A
SECTION 400
COMMUNICATION AND NAVIGATIONAL AIDS
ANNUAL GMDSS, S-VDR, SASS, AND LRIT SYSTEMS RECERT
A
ANNUAL RADAR AND ECDIS PREVENTIVE MAINTENANCE
A
NAVMACS UPGRADE SYSTEM SUPPORT
A
SECTION 500
MACHINERY, AUXILIARIES SYSTEMS
SEWAGE PIPING MODIFICATION (T-AH 440 & VRR15-012)
A
FEED PUMP VALVE REPAIRS
A
FIRE/FLUSHING PUMP PIPING MODIFICATION (T-AH 14-043R)
A
OILY WATER SEPARATOR REPLACEMENT (T-AH 450 & VRR15-011)
A
OVERHAUL AND SET RELIEF VALVES (VRR15-005)
A
ADG EXHAUST GASKETS AND INSULATION REPAIRS (VRR15-14)
A
PRESSURE & TEMPERATURE GAUGE CALIBRATION (VRR15-018)
A
EDG MAINTENANCE– Revision A
A
BALLAST PUMP OVERHAUL
A
NOT USED
FOREPEAK AND BALLAST TANK NO.1
EDUCATOR PIPING REPLACEMENT
A
SECTION 600
OUTFITTING, FURNISHINGS AND HABITABILITY
ANNUAL FIRE FIGHTING SYSTEMS INSPECTION
A
ANNUAL SELF-CONTAINED BREATHING APPARATUS INSPECTION
A
SERVICING SCBA COMPRESSOR REFILL STATION
A
ANNUAL ELEVATORS RECERTIFICATION
A
ANNUAL DAVITS INSPECTIONS
ANNUAL CRANES INSPECTIONS (VRR14-019) – Revision A A
ANNUAL TENDER AND LIFEBOAT INSPECTIONS
ANNUAL RESCUE BOATS INSPECTION
A
ANNUAL PICKET BOAT INSPECTION
A
ANNUAL UTILITY BOAT INSPECTION
A
SECTION 800
HEATING, VENTILATION, AND AIR CONDITIONING
500 TON AC PLANT 30,000 HOUR MAINTENANCE (VRR14-094)
A
SECTION 900
DRYDOCKING
DOCKING AND UNDOCKING– Revision A
A
REPLACE GATE VALVES AND TRANSDUCERS ON FATHOMETER AND
SPEED LOG (VRR15-13)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .