N32205-15-R-5000-P0003.doc

DOC document 52 KB Posted

Attached to
USNS MERCY (T-AH 19) ROH/DD Federal contract opportunity
Solicitation number
N32205-15-R-5000
Issued by
Department of the Navy Military Sealift Command

About this file

Amendment 0003 for USNS MERCY (T-AH 19) ROH/DD

View the file

Other files for this federal contract opportunity

Other files attached to USNS MERCY (T-AH 19) ROH/DD, newest first.
File Type Posted
RFQ_Q_and_A_-_No._2.docx DOCX document
RFQ_Q_and_A_-_No._1.docx DOCX document
0112_B_NO_1_BALLAST_TANK_FORWARD_STEEL_REPAIRS_-_Revision_A.doc DOC document
MERCY_FY16_0515_A_CHT_PIPING_REPAIRS.doc DOC document
0203_A_FUEL_SETTLER_TANKS_REPAIR.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____3_Aug_2015.doc DOC document
Attachment_J_-_2_Category_A_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
N32205-15-R-5000-P0006.doc DOC document
0903_A_UW_HULL_PRESERVATION_MERCY_FY16.docx DOCX document
Attachment_J_-_3_Category_B_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
0514_A_ADG_ENGINE_MOUNTS_REPLACEMENT.doc DOC document
Pictures_for_WI_0515.zip ZIP file
TANK_CAPACITY_TABLES.PDF PDF
USNS_MERCY_Reference_List__15_ROH_DD___3_Aug_2015.doc DOC document
0607_A_ANNUAL_CRANES_INSPECTIONS_-_Revision_A.doc DOC document
N32205-15-R-5000-P0005.doc DOC document
0901_A_DOCKING_AND_UNDOCKING_-_Revision_A.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____24_July_2015.doc DOC document
0105_A_WATER_TIGHT_DOOR_REPAIR_-_Revision_A.docx DOCX document
0202_A_AUTOMATION_SYSTEM_GROOM_-_Revision_A.doc DOC document
0508_A_EDG_MAINTENANCE_-_Revision_A.doc DOC document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_COFFERDAMS_AND_SPACES_-_Revision_A.doc DOC document
MERCY_EVAP_3_ _4_140_STATION_RELIEF_VALVE_2.5in_x_4in.jpg JPG image
N32205-15-R-5000-P0004.doc DOC document
MERCY_LAUNDRY_RED_STATION_RELIEF_VALVE_3in_x_4in.jpg JPG image
Non-Disclosure_Agreement_-_International_Inspections.docx DOCX document
N32205-15-R-5000-P0002.doc DOC document
390-100-041_G_is__Fr_78-87.PDF PDF
390-100-039_F.PDF PDF
Amendment_P0001.doc DOC document
5980056_A_Scantling_Plan.PDF PDF
0101_5981321_G_Painting_Schedule.pdf PDF
J-Attachments.zip ZIP file
N32205-15-R-5000.doc DOC document
WORK_ITEMS.zip ZIP file
MERCY_-_CDRLs_J-6.zip ZIP file
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_25_June.doc DOC document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SUMMARY OF CHANGES

A. REQUEST FOR SPECIFICATION CLARIFICATION

SPECIFICATION ITEM NO: HULL STRUCTURE – Work Items - 101, 102, 105, 109, 110, 111, and 112.

PARAGRAPH / SECTION NO: __VARIOUS_______

TITLE:_STEEL REPAIRS _

QUESTIONS:

Upon review of the various work items involving steep repairs, it appears there are numerous unknowns and variables to take into account in order to provide a competitive proposal.

1. Is there a general report from which the steel work items are based on?

2. Can MSC provide exact locations on the vessel where work will commence in order to determine what and if any interference will need to be accounted for?

ANSWERS:

1. There is an Ultrasonic Gauging Survey report performed on the USNS MERCY (T-AH 19) during its previous availability in 2015, annotating the following items which were ultrasonically gauged:

a. Three Transvers Belts of Deck, Bottom and Side Shell Plating;

b. Plating and Stiffeners in the Fore Peak and Aft Peak Tanks;

c. Aft Main Deck, Forecastle and 01 Deck Plating;

d. Port/Starboard Wind-and-Water Strakes;

e. Keel and Bottom Shell Plating;

f. Sea Chests;

g. Suspect Areas.

Any interested offerors or its subcontractors must sign the attached Non-Disclosure Form and return it to Melanie Barrett at Melanie.Barrett@navy.mil or to Eddie Nelson at Eddie.Nelson1@navy.mil prior to receiving this report.

Ms. Barrett can also be reached via phone at (757) 443-5962 or (757) 777-6766.

Attached: Non-Disclosure Form

2. Refer to the two (2) CDs provided – one (1) which identifies all work items, in particular the steel replacement specifications; and two (2) which identifies all references for all work items with the exception of WI 101. The references for WI 101 were provided via Amendment P0001 dated, 13 July 2015.

B. REQUEST FOR SPECIFICATION CLARIFICATION

SPECIFICATION ITEM NO.: _302 & 510_________________

PARAGRAPH / SECTION NO:___1.1_________________

TITLE: TURNING GEAR MOTOR OVERHAUL

QUESTION:

It is noted that work items 302 and 510 are titled “TURNING GEAR MOTOR OVERHAUL.” Which of the two (2) work items is correct and should be accomplished, Section 300-Electrical or Section 500-Machinary?

1. Please verify which item is to be accomplished.

ANSWER:

1. The correct Work Item is 302: “TURNING GEAR MOTOR OVERHAUL (VRR15-005)” is to be accomplished.

2. Work Item 510 is a duplicate work item and will be removed from the availability work specifications.

Work Item 510 is hereby cancelled in its entirety due to duplication; Work Item 302 outlines the correct work specifications.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .